Construction - Palmetto's 1.2 MGD Dry Season Reclaimed <strong>Water</strong> ASR<br />

System<br />

Critical Project Milestones<br />

Projected<br />

Amended<br />

Actual<br />

Draft Agreement to Contract Administration: 09/30/2006 09/30/2006<br />

Agreement Executed / Notice to Proceed: 11/30/2006 01/24/2007<br />

Start Design of ASR 03/01/2007 03/06/2007<br />

Complete Design of ASR 08/30/2007 01/31/2012 02/02/2012<br />

Start construction of reclaimed water ASR: 09/01/2007 03/05/2008<br />

Complete construction of reclaimed water ASR: 08/30/2010 01/31/2013<br />

Start Cycle Testing: 09/01/2010 04/01/2013<br />

Complete Cycle Testing & Obtain Operational Permit: 12/31/2010 06/30/2014<br />

Status As Of February 22, 2012<br />

Since the ASR is planned to be constructed in a potable aquifer, the project was placed on hold pending the results of the <strong>District</strong>'s<br />

arsenic pretreatment study at the City of Bradenton ASR project. Results from the Bradenton study were very positive and other<br />

acceptable methods are now available. The City has resumed work on the project as of February 15, 2011. The consultant is<br />

renewing the FDEP permit and designing the ASR system. An Administrative Order will be issued by FDEP with the permit<br />

renewal. PBS&J (now Atkins) has completed the 100% design of the ASR. To date, $661,000 has been budgeted, of which the<br />

<strong>District</strong> has reimbursed the City $223,711.63 for its share of design and construction of the exploratory/SZMW.<br />