May 4, 20<strong>10</strong><br />
Dear Nuclear Medicine Professional,<br />
As the molybdenum 99 (Mo 99) shortage continues, we remain focused on all aspects of the situation to<br />
maximize patient access to the vital, daughter medical isotope of Mo 99 – technetium 99m (Tc 99m).<br />
As a reminder, the High Flux Reactor (HFR) in the Netherlands remains down as scheduled through mid-<br />
August 1 , and the National Research Universal reactor in <strong>Canada</strong> is not expected to return until late July 2 .<br />
The BR2 reactor in Belgium is also offline during May for routine maintenance.<br />
Based on updated supply estimates from the Maria, BR2, OSIRIS (France) and Safari (South Africa)<br />
reactors, daily projection calendars for Tc 99m generators in the Americas are shown below through June.<br />
As always, projections are subject to change.<br />
UPDATED MAY 20<strong>10</strong> JUNE 20<strong>10</strong><br />
S M T W T F S S M T W T F S<br />
1 1 X 3 X 5<br />
X 3 4 X 6 X 8 6 X 8 9 <strong>10</strong> 11 12<br />
9 X 11 X 13 14 15 13 14 15 16 17 18 19<br />
16 X 18 X ! X 22 20 21 22 23 24 25 26<br />
23 X 25 26 ! X 29 27 28 29 30<br />
30 X<br />
Generator standing orders met with some extra; minimal Tc 99m UD impact<br />
Majority of generator standing orders met but no extra; some Tc 99m UD impact<br />
Generator standing order shortage resulting in size reductions, Tc 99m shortage and UD impact<br />
Significant shortage to generator standing orders, severe Tc 99m shortage and UD impact<br />
X No <strong>Mo99</strong> supply expected. Generator production canceled.<br />
! Special production run due to timing of Mo 99 supply<br />
It is important to remember the color coding reflects the day a generator is manufactured, with delivery the<br />
next day. Use of the Tc 99m from that generator goes well beyond the original production date to supply<br />
patient procedures.<br />
JULY 20<strong>10</strong><br />
S M T W T F S<br />
1 2 3<br />
4 5 6 7 8 9 <strong>10</strong><br />
11 12 13 14 15 16 17<br />
18 19 20 21 22 23 24<br />
25 26 27 28 29 30 31<br />
A weekly view of our projected supply for July is also<br />
shown on the calendar at left. While there are periods<br />
of extreme shortage, the addition of the Maria reactor<br />
will make an otherwise difficult month more<br />
manageable. Note that the full weeks are shown with<br />
anticipated supply levels over the course of the week;<br />
Actual production days may be higher or lower than<br />
the color indicates.<br />
7300 TRANS-CANADA HWY 1-877-664-8926 [T] WWW.COVIDIEN.COM<br />
POINTE-CLAIRE QC H9R 1C7<br />
CANADA<br />
1-800-567-1939 [F]
We also continue to increase production of thallium Tl 201 within our supply capacity for those procedures<br />
where it can be a clinically appropriate substitute. You are encouraged to plan your thallium needs in<br />
advance and contact your <strong>Covidien</strong> Customer Service representative to ensure those needs are known.<br />
We are committed to frequent communication when new updates are available. To learn more about the<br />
current Mo 99 supply situation and Maria, please visit www.covidien.com/<strong>Mo99</strong>supply.<br />
Sincerely,<br />
Philippe Hebert<br />
Director, Sales & Marketing, Pharmaceuticals<br />
1. HFR repairs progressing according to plan http://www.nrg.eu/hfr-repair/hfr-updates/ (last accessed 5- 4-<strong>10</strong>)<br />
2. NRU Status <strong>Update</strong> #53: AECL provides update on NRU activities<br />
http://www.nrucanada.ca/en/home/projectrestart/statusupdates/nrustatusupdate53.aspx (last accessed 5-4-<strong>10</strong>)<br />
7300 TRANS-CANADA HWY 1-877-664-8926 [T] WWW.COVIDIEN.COM<br />
POINTE-CLAIRE QC H9R 1C7<br />
CANADA<br />
1-800-567-1939 [F]