- 24 -<br />
involve actions as per ROSDCP and generally to cover the initial part in<br />
table top exercise for altering, notification quantification assessment of<br />
response actions and the deployment for containment, recovery, transport,<br />
disposal, shoreline cleanup and claims preparation should be worked up as<br />
practical exercise.<br />
(c) Level 3. Spill scenarios reflecting an incident of significance to<br />
generally wider area response calls for invoking of NOSDCP. As invoking<br />
NOSDCP involves invoking national <strong>disaster</strong> management <strong>plan</strong>, these<br />
exercises will be coordinated from CGHQ.<br />
1.47. The Level-1 and Level -2 exercises can be preceded by table Top exercise<br />
and Mock Drills, if the level of knowledge of the personnel taking part in the<br />
exercise is not adequate enough to understand the procedures that are followed<br />
after a <strong>spill</strong> occurs in the site.<br />
Periodicity of Exercise<br />
1.48. Level 1 and Level 2 exercises are promulgated as part of annual training<br />
programme. Participation in Level 3 exercise will be as per the schedule<br />
promulgated by CGHQ.<br />
Planning Exercise<br />
1.49. The Coordinating <strong>Coast</strong> <strong>Guard</strong> unit to conduct the exercise as per the<br />
annual training programme in consultation with stake holders emphasizing<br />
stages of exercise <strong>plan</strong>ning as per OSREG.<br />
Equipment Deployment<br />
1.50. The purpose of the equipment deployment exercise is to validate that the<br />
equipment is appropriate for the operating environment in which it is intended to<br />
be used and that operating personnel are trained and capable of its deployment<br />
and operation.<br />
Documentation<br />
1.51. Proper Documentation for evaluation should include the following<br />
information:-<br />
(a) Type of exercise<br />
(b) Date and time of the exercise<br />
(c) A detailed description of the exercise<br />
(d) Objectives achieved during the exercise<br />
(e) The components of the response <strong>plan</strong> exerdis3ed