Figure 7<br />
Condition of <strong>Morningside</strong> Drive pedestrian crossing as reported by Track<br />
Inspector 5 September 2012<br />
The Track Inspector had reported the condition of the asphalt seal between the rails on both<br />
the Down <strong>and</strong> Up Main Lines during a foot inspection, but had not at that time raised either<br />
the lack of fill nor the overall deteriorated condition of the remaining fill in the field <strong>and</strong> flange<br />
gaps on either side of the rails as an issue.<br />
As noted later in this <strong>Report</strong>, no remedial work was undertaken to address the issues raised<br />
by the Track Inspector prior to the accident.<br />
At the end of November or early December 2012 the same Track Inspector had revisited the<br />
site (as part of his Turnout inspections). He was concerned that nothing had been done in<br />
the way of repairs to the crossing so he applied fluorescent paint to mark danger spots for<br />
members of the public using the crossing. Those markings are shown in Figure 5.<br />
<strong>Report</strong> on Collision Train 126 with Power Wheelchair, <strong>Morningside</strong>, 25 February 2013 Page 13