Environmental Impact Assessment<br />

Khan Younis Wastewater Treatment Plant <strong>May</strong> 20<strong>10</strong><br />

4. Ambient Air Emission Monitoring<br />

5. Solid and Hazardous waste Monitoring<br />

6. Noise Level Monitoring<br />

7. Traffic Monitoring<br />

A monitoring program has been prepared for the project. This program provides<br />

details regarding monitoring parameters, monitoring location, number of tests/<br />

samples, method/equipment for testing, frequency and responsibility for<br />

monitoring and preliminary costs. Environmental Monitoring <strong>Report</strong>s will be<br />

prepared on monthly basis and complete record will be maintained at the site<br />

office. The environmental monitoring reports will be submitted to Environment<br />

Quality Authority (EQA) on quarterly basis.<br />

Table 8.1outlines the monitoring protocols, parameters and frequencies required to be<br />

observed during the construction and operation of the KY WWTP project.<br />