United Nation Development Programme<br />

Programme <strong>of</strong> Assistance to the Palestinian People<br />

Rehabilitation <strong>of</strong> Daklia Road<br />

PAL 10-00071488<br />

<strong>Bill</strong> <strong>of</strong> <strong>Quantity</strong> (<strong>BOQ</strong>)


PREAMBLE TO BILL OF QUANTITY (<strong>BOQ</strong>)<br />

1. GENERAL<br />

The nature <strong>of</strong> this contract is re-measured unit price contract and the <strong>Bill</strong> <strong>of</strong> <strong>Quantity</strong><br />

(<strong>BOQ</strong>) shall reflect this fact.<br />

<strong>BOQ</strong> shall be read and construed in conjunction with other Contract Documents.<br />

General directions and description <strong>of</strong> work and material given in the Technical<br />

Specification are not necessarily repeated in the <strong>Bill</strong> <strong>of</strong> <strong>Quantity</strong>. The Technical<br />

Specification forms an integral part <strong>of</strong> the <strong>Bill</strong> <strong>of</strong> <strong>Quantity</strong>.<br />

The Tenderer is obliged to check the number <strong>of</strong> the pages <strong>of</strong> the <strong>Bill</strong> <strong>of</strong> <strong>Quantity</strong> and<br />

should any be found missing or duplicated or the figures <strong>of</strong> writing indistinct, the Tenderer<br />

must notify the Employer/Engineer at once and have the matter rectified before the Tender<br />

is submitted. No liability whatsoever will be accepted in respect <strong>of</strong> any claim for errors in<br />

the Tenderer’s <strong>of</strong>fer resulting from failure to comply with the fore-going.<br />

The Tenderer is deemed to have visited the site/s and fully acquainted himself as to the<br />

location <strong>of</strong> each <strong>of</strong> the items and works to be carried out and to all conditions which may<br />

affect the performance <strong>of</strong> the works, including but not limited to:<br />

Access for the storing dump site and <strong>UNDP</strong> crushing site as well as access to<br />

required services<br />

Restrictions applicable to working in GAZA Strip area.<br />

All safety regulations and employer site safety procedures.<br />

All Palestinian regulations.<br />

The Tenderer is also deemed to have surveyed the actual condition <strong>of</strong> the site and buildings<br />

and made his own assessment <strong>of</strong> the type and extent <strong>of</strong> the works prior to submitting his<br />

<strong>of</strong>fer.<br />

2. QUANTITIES<br />

Although practical care was exercised in preparing the <strong>BOQ</strong>, all quantities given herein<br />

shall be deemed to be estimated quantities <strong>of</strong> the work to be done. They are not to be taken<br />

as actual and correct quantities <strong>of</strong> the work to be executed and they do not absolve the<br />

contractor <strong>of</strong> his obligations under the Contract. At any time, the actual quantities increase<br />

or decrease, hence, it is understood that the actual quantities increase or decrease is<br />

expected risk and no claim whatsoever will be taken into consideration for extra cost in<br />

that respect by employer. Any claim whatsoever submitted for cost or extra expenses<br />

incurred from such increase or decrease will not be accepted by Employer/Engineer except<br />

where else stipulated in the Contract.<br />

3. MATERIALS<br />

All materials used are to be <strong>of</strong> the best new available, subject to the Employer/Engineer<br />

approval, durable nature, guaranteed, not liable to any base exchange and manufactured<br />

Contractor’s signature and stamp Page 2


according to applicable BS, ASTM or DIN Standards. Execution also is subject to<br />

approval <strong>of</strong> Employer/Engineer and shall be in conformance <strong>of</strong> the best available common<br />

practice in engineering codes at the time <strong>of</strong> execution.<br />

Items that contain materials or products <strong>of</strong> special make with names <strong>of</strong> manufacturers are<br />

to be taken as samples <strong>of</strong> what will be required. Subject to the Employer/Engineer<br />

approval, the Contractor may, at his discretion, <strong>of</strong>fer similar products <strong>of</strong> other make if the<br />

equivalent quality <strong>of</strong> the specified materials is obtained. In this case, the Contractor shall<br />

submit a description and/or drawings showing all technical conditions, characteristics,<br />

make, type and address <strong>of</strong> Manufacturer, etc., <strong>of</strong> the materials <strong>of</strong>fered as alternatives.<br />

4. PRICES AND CURRENCY<br />

The prices given, by the Contract, hereunder in the <strong>BOQ</strong> shall be in United States Dollars<br />

or ILS. Furthermore inflation and escalation or changes whatsoever shall not be subject <strong>of</strong><br />

claim later on.<br />

The Unit Prices entered against the various items in the following <strong>Bill</strong> <strong>of</strong> Quantities<br />

include all operation costs for execution, completion and maintenance <strong>of</strong> the various items<br />

<strong>of</strong> the works finished completely in every respect till the final acceptance as specified or<br />

described in the Tender Documents, with or without modifications, either by way <strong>of</strong><br />

additions or deductions, or alterations as may be <strong>of</strong>fered in writing during the progress <strong>of</strong><br />

the works, and include, without being limited to, all what is deemed necessary particularly<br />

referred to in the Tender Documents.<br />

The Unit Price shall cover all costs <strong>of</strong> every kind whatsoever including, without being<br />

limited to, all charges for additional site installations, relocation, supervision, labor,<br />

transportation and supply <strong>of</strong> materials; the provision, maintenance, use and efficient repair<br />

<strong>of</strong> all plant, equipment and appliance <strong>of</strong> every kind, the construction and maintenance <strong>of</strong><br />

all temporary works, the performance <strong>of</strong> all services and the fulfillment <strong>of</strong> all obligations<br />

and responsibilities herein defined.<br />

The Tenderer shall be deemed to have fully considered all the conditions, obligations, and<br />

requirements <strong>of</strong> the Tender Documents before entering the respective unit price against the<br />

various items <strong>of</strong> the <strong>Bill</strong> <strong>of</strong> Quantities.<br />

The Unit Prices given hereunder the <strong>BOQ</strong> shall also include erection, installation, fixing,<br />

and re-fixing <strong>of</strong> all elements. These prices shall also include taxes, visa for labor, gate<br />

passes, accommodations for the Contractor’s staff and labors, all required insurance and<br />

work permits, guarantees, bonds, traffic plan requirements, safety procedures, etc. and all<br />

requirements necessary to have the work maintained until its final handing over.<br />

The Unit Prices given hereunder in the <strong>Bill</strong> <strong>of</strong> <strong>Quantity</strong> for this work shall also include<br />

overheads, risks, pr<strong>of</strong>it etc. and all other financial matters to have all these civil works<br />

completed.<br />

Contractor’s signature and stamp Page 3


The works, materials or activities listed in the following shall always be considered as<br />

supportive works to be included in the Unit Prices bid for any item in the <strong>Bill</strong> <strong>of</strong><br />

Quantities:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Any measurement for execution and payment <strong>of</strong> the works, including the provision <strong>of</strong><br />

measuring instruments, gauges, setting out marks, marking paint and relevant tools,<br />

labor, etc., the maintenance and preservation <strong>of</strong> gauges and setting-out marks during<br />

the execution <strong>of</strong> the works.<br />

Provision <strong>of</strong> small tackle tools or any other equipment required for the execution <strong>of</strong> the<br />

works.<br />

Supply <strong>of</strong> consumable materials for the Contractor’s equipment.<br />

Removal <strong>of</strong> all contamination (refuse, debris, building rubbish and the like) arising<br />

from or in connection with the Contractor’s work to locations approved by the<br />

engineers<br />

Protection <strong>of</strong> the executed works and <strong>of</strong> the items made available for execution <strong>of</strong> the<br />

works from damage, fire, inclement weather, vandalism and theft etc., until the time <strong>of</strong><br />

final acceptance.<br />

Transportation <strong>of</strong> all materials and structural components from the storage places on<br />

site to the points <strong>of</strong> use and return transportation, if required.<br />

Submitting and transporting any samples required.<br />

Carrying out tests on materials and works, etc., that is required by the Engineer.<br />

Fuel and lubricants for operation <strong>of</strong> Contractor’s equipment.<br />

All safety precautions and measures for safeguarding labor as well as securing<br />

surrounding areas.<br />

Lighting <strong>of</strong> the work site.<br />

Maintenance , repair or reconstruct damaged infrastructure resulted by contractor’s<br />

activities<br />

5. RIGHTS OF EMPLOYER<br />

The following rights are reserved to the Employer:<br />

<br />

<br />

<br />

To omit individual items mentioned in the Schedule <strong>of</strong> Prices if not required in the<br />

opinion <strong>of</strong> the Employer and/or to replace them should it be more advantageous to<br />

execute them in another way.<br />

To order execution <strong>of</strong> alternative or provisional items as if they were main items.<br />

To order execution <strong>of</strong> additional works as well as alternatives <strong>of</strong> works, always in<br />

conformity with the conditions outlined in the Contract.<br />

Any order and/or delivery <strong>of</strong> material or equipment by the Contractor for performance <strong>of</strong><br />

the works may only be based on instructions and/or approved execution drawings by the<br />

Employer/Engineer.<br />

Contractor’s signature and stamp Page 4


All equipment and materials for installation and finishing works to be incorporated in this<br />

contract shall prior to ordering and/or delivery by the Contractor, be approved by the<br />

Employer/Engineer both in respect <strong>of</strong> quality and type as well as <strong>of</strong> quantity.<br />

6. SITE ACCESS AND STORAGE<br />

The Tenderer shall visit all sites and ascertain the location <strong>of</strong> required access onto these<br />

sites and the location <strong>of</strong> allowance for complying with the requirements and for the<br />

reinstatement to original condition <strong>of</strong> all roads and areas used or disturbed by the<br />

Contractor to the satisfaction <strong>of</strong> the Engineer.<br />

7. SITE INSTALLATION<br />

All costs <strong>of</strong> labor, works, provisions, materials and equipment for Site Installations<br />

required by the Contractor and stipulated in the Tender Documents shall be included in the<br />

various unit prices <strong>of</strong> the <strong>Bill</strong> <strong>of</strong> Quantities. No extra payment will be allowed by the<br />

Employer for any <strong>of</strong> these activities.<br />

8. DURATION<br />

The total duration <strong>of</strong> the contract is Four (4) calendar months including weekends,<br />

holidays and <strong>of</strong>ficial holidays. Official weekends are Fridays and Saturdays.<br />

9. OTHER CONTRACTOR’S OBLIGATIONS<br />

The Contractor has to submit Detailed Shop Drawings to be approved by the Engineer<br />

before commencement <strong>of</strong> the work, and all required materials should be supplied as<br />

specified and subject to the Engineer approval.<br />

The Contractor has to fix the underground services that may be damaged during his<br />

work.<br />

The Contractor has to maintain the Existing Open Channels flow during construction.<br />

All works has to be done according to the Engineer's instructions, Drawings and<br />

specification.<br />

The Contractor has to repair any damages <strong>of</strong> any services at full satisfaction <strong>of</strong><br />

relevant Service Authority<br />

The contractor has to test on his own expenses, the sub-grade CBR before<br />

commencement <strong>of</strong> work, In case the CBR value less than 15%, then soil replacement<br />

should be applied.<br />

The contractor has to check the upper 30 cm below the top <strong>of</strong> the sub-grade to verify<br />

that they are uniform, and any rubbish material or saturated /wet soil shall be removed<br />

and replaced with suitable material approved by the Engineer ,<br />

NO EXTRA COST SHALL BE PAID FOR SUCH REPLACEMENT<br />

The contractor has to Execute any required side slope according to specifications,<br />

drawings , and Engineer’s instructions<br />

Price will include costs <strong>of</strong> removing and/or relocating <strong>of</strong> all obstacles such as debris,<br />

garbage, trees and existing services in addition to the required materials necessary for<br />

work completion according to engineer's instructions and specifications.<br />

Contractor’s signature and stamp Page 5


The contractor has to coordinate with Municipalities regarding garbage containers<br />

location.<br />

The contractor should include in his price the costs <strong>of</strong> cut and removal <strong>of</strong> trees roots,<br />

backfilling, watering, and compaction in layers with clean sand as specified and<br />

according to the Engineer instructions, the price will also include relocation <strong>of</strong> Power,<br />

Telephone poles and networks to sidewalk.<br />

Price will include costs <strong>of</strong> adjusting the levels <strong>of</strong> existing manholes (in any diameter)<br />

to suit the new situation. Replacing covers, frames, rings if defected and all materials<br />

and work required to complete the task.<br />

The contractor has to remove the existing base coarse during preparation works and<br />

transport it wherever directed by the engineer to the related Municipality.<br />

The price will include costs <strong>of</strong> cutting and removing <strong>of</strong> the existing asphalt pavement<br />

layer and transporting the removed material to a site approved by the Engineer<br />

Prices for excavation item shall include the removal <strong>of</strong> any buried structure not to be<br />

part <strong>of</strong> the proposed roads, including transport <strong>of</strong> excavated, surplus material and<br />

buried structure (not to be part <strong>of</strong> the proposed roads) to a location approved by the<br />

engineer or his representative outside the site, workmanship and anywhere else,<br />

needed, all according to drawings, specifications, conditions and directed instructions<br />

by the Engineer or his representative.<br />

Quantities <strong>of</strong> excavation shall be measured according to the dimensions mentioned in<br />

the drawings(engineering measurements in m 2 )<br />

Back-filling item should be in layers (25cm max. each & compaction test 97%). Prices<br />

shall includes material supply, watering, compacting, transporting, testing and<br />

anywhere else, needed, all according to drawings, specifications, conditions and direct<br />

instructions by the Engineer or his representative.<br />

Suitable clean sand should be used for back-filling in layers (25cm max. each &<br />

compaction test 97%), selected from the approval excavated soil or imported. Prices<br />

shall includes supply, watering, compacting, transporting, testing and anywhere else,<br />

needed, all according to drawings, specifications, conditions and directed instructions<br />

by the Engineer or his representative.<br />

The contractor shall check and ascertain that the Benchmark used by him and its<br />

elevation is accurate and correct in all respects. The contractor shall check the<br />

surveying work. If correction is needed, the contractor has to redo the surveying work<br />

on his own.<br />

Contractor’s signature and stamp Page 6


<strong>Bill</strong> <strong>of</strong> <strong>Quantity</strong> <strong>of</strong> Daklia Road<br />

<strong>Bill</strong> No 1: Roads Works<br />

Rehabilitation <strong>of</strong> Daklia Road<br />

Item<br />

No.<br />

Description Unit Qty.<br />

- The Contractor has to submit Detailed Shop<br />

Drawings to be approved by the Engineer before<br />

commencement <strong>of</strong> the work, and all required<br />

materials should be supplied as specified and subject<br />

to the Engineer approval.<br />

- The Contractor has to fix the under ground services<br />

that may be damaged during his work.<br />

- The Contractor should include in his price the costs<br />

<strong>of</strong> sampling and testing as required and according to<br />

technical specifications and work requirement.<br />

- Price will include costs <strong>of</strong> removing and/or<br />

relocating <strong>of</strong> all obstacles such as debris, garbage,<br />

trees and existing services in addition to the required<br />

materials necessary for work completion according<br />

to engineer's instructions and specifications.<br />

- The Contractor should include in his price the costs<br />

<strong>of</strong> cut and removal <strong>of</strong> trees roots, backfilling,<br />

watering, and compaction in layers with clean sand<br />

as specified and according to the Engineer<br />

instructions, the price will also include relocation <strong>of</strong><br />

Power, Telephone poles and networks to sidewalk.<br />

- Price will include costs <strong>of</strong> adjusting the levels <strong>of</strong><br />

existing manholes (in any diameter) to suit the new<br />

situation. Replacing covers, frames, rings if defected<br />

and all materials and work required to complete the<br />

task.<br />

- The price will include costs <strong>of</strong> cutting and<br />

removing <strong>of</strong> the Existing Asphalt pavement layer<br />

and transporting the removed material to a site<br />

approved by the Engineer<br />

Unit<br />

Price<br />

(US$)<br />

Total<br />

(US$)<br />

1.1<br />

Clean, excavate, cut and fill sidewalks with clean<br />

dune sand from natural ground level to the bottom<br />

<strong>of</strong> the sub-base layer design level for carriageway<br />

and 23cm under the top face <strong>of</strong> the curb stone for<br />

sidewalks including watering, compaction not less<br />

than 97% & CBR not less than 15% ,all according to<br />

drawing and technical specifications .The price<br />

include dismantle existing curbstone if exist and<br />

receive to municipality stores & remove all existing<br />

block fences or others which objected the execution<br />

<strong>of</strong> works in carriageway or sidewalks., all according<br />

to drawing and technical specifications . All tests as<br />

per specifications & Engineer Instructions.<br />

m 2 3300<br />

Contractor’s signature and stamp Page 7


Item<br />

No.<br />

1.2<br />

1.3<br />

1.4<br />

1.5<br />

1.6<br />

Description Unit Qty.<br />

Supply and lay approved sub-base material (<br />

Kurkar) <strong>of</strong> 15 cm thickness for the sidewalks in one<br />

layer with CBR.> 30%, watering and compaction up<br />

to 98% maximum dry density according to modified<br />

proctor test. the work includes all tests as per<br />

specifications & Engineer Instructions<br />

Supply & lay pre-cast concrete curbstones for<br />

sidewalks (15x30x80 cm) including all necessary<br />

excavations, compaction to 98% <strong>of</strong> MDD and<br />

compacted Existing crushed stone 15 cm thick,<br />

B250 plain concrete foundation (27x12cm) under<br />

the curb and (12x21cm) behind, spreading 2 cm<br />

mortar under the curb, filling joints between curbs<br />

with cement mortar and painting with one prime<br />

coat and two finishing coats <strong>of</strong> approved brand<br />

name painting material ,expansion joint every 12 mr<br />

with selotex board and filling 3cm with seka flex<br />

,all according to drawing and technical<br />

specifications.<br />

Supply, install and compact <strong>of</strong> interlock tiles 8 cm<br />

thick, The price include supply and spread dune<br />

sand 5 cm thick under interlock, all the required<br />

tests, all works are according to specifications,<br />

Drawings and Engineer instructions.<br />

Construct reinforced concrete retaining walls, beams<br />

or any structural element as instructed by the<br />

Engineer including all necessary excavations &<br />

filling dune sand to the required level, B300<br />

concrete & expansion joint at 12m interval with<br />

selotex board all in accordance with the<br />

specification & drawings.<br />

Supply and construct storm water collection gullies<br />

with length <strong>of</strong> 3.0m at least, as detailed in drawings<br />

constructed <strong>of</strong> reinforced concrete B300 , including<br />

cast iron grills, benching, excavation and<br />

backfilling with clean sand and compaction, remove<br />

the surplus soil to the tip as shown in the drawings<br />

and according to the specifications and the<br />

engineer’s instructions.<br />

m 2 3300<br />

L.m 1100<br />

m 2 5500<br />

m 3 25<br />

No 6<br />

Unit<br />

Price<br />

(US$)<br />

Total<br />

(US$)<br />

Contractor’s signature and stamp Page 8


Item<br />

No.<br />

1.7<br />

1.8<br />

1.9<br />

1.10<br />

Description Unit Qty.<br />

Supply, install, UPVC pipes 315 mm outside<br />

diameter SN8 with wall thickness 9.20mm for outlet<br />

drain with watertight and flexible joints sealed with<br />

approved gasket rubber ring including dewatering,<br />

excavation in any ground, shoring, shuttering, safety<br />

measures, testing, providing specified bedding<br />

backfilling .The pipe should be bedded and covered<br />

with at least 20 cm <strong>of</strong> clean dune sand around and at<br />

the top and bottom <strong>of</strong> the pipe . The kurkar will be<br />

used for backfilling the rest <strong>of</strong> the trench in layers<br />

not exceeding 20cm, with compaction not less than<br />

98 % , up to the design leveling <strong>of</strong> the roads,<br />

leveling the roads after backfilling, leveling <strong>of</strong> the<br />

roads after backfilling, take away the surplus soil to<br />

tip and all other accessories, trial trenches to locate<br />

the existing services supporting them as necessary<br />

all as specified.<br />

Adjust level <strong>of</strong> existing Line or Manholes (Sewer,<br />

Water, Telephone, Storm water, etc.) to the required<br />

level. The work includes decreasing the height <strong>of</strong><br />

manholes by demolishing the extra parts or<br />

increasing the height by supplying & installing<br />

precast concrete ring B300, in cast the height more<br />

than 30 cm, otherwise casting <strong>of</strong> concrete may be<br />

used, also include( if need) cast iron cover 25 ton<br />

with the word sewer in English & Arabic) and all<br />

required materials. The work also includes cleaning<br />

<strong>of</strong> existing manholes & lines.<br />

Supply and cast concrete B250 for poles base<br />

Dimension (110x110x100 cm) the work include<br />

excavation , shuttering , supplying and installing hot<br />

galvanized steel pole base for 12 m poles, the work<br />

include supplying and fixing a 3" sharshori conduits<br />

with a rope inside it in the base ,nuts , wishers and<br />

all required accessories required to complete the job,<br />

all according to drawings, specifications and<br />

engineer instructions.<br />

Supply and install 3" sharshori conduit with a rope<br />

inside it , the work include Excavation ,backfilling<br />

on layers 20 cm thick <strong>of</strong> dune sand with compacting<br />

to 98 % MDD. The price including for any depth<br />

excavation( at least 1.0 m from the face <strong>of</strong> sidewalk<br />

pavement), laying and re-back filling with suitable<br />

Materials also included electrical warning tape.<br />

Total Roads Works<br />

L.m 200<br />

Unit 40<br />

Unit 28<br />

L.M 1100<br />

Unit<br />

Price<br />

(US$)<br />

Total<br />

(US$)<br />

Contractor’s signature and stamp Page 9


<strong>Bill</strong> No 2: Water works<br />

Item<br />

No. Description Unit Qty.<br />

2<br />

_All works must be coordinated with the water<br />

department at the Municipality and all testes need<br />

to be included.<br />

_ All executed works must be documented in as<br />

Built Drawings, connected By Total station with<br />

sample presented <strong>of</strong> GIS municipality department,<br />

also observe all existing points coordination. ( This<br />

mission will be finished by Approval Surveying<br />

<strong>of</strong>fice).<br />

_The price includes the cost <strong>of</strong> excavation to depth<br />

indicated in drawings using retaining shuttering,<br />

shoring according to instructions <strong>of</strong> Engineer,<br />

bedding <strong>of</strong> 20 cm clean dune sand under around<br />

and above the pipe with compaction, backfilling the<br />

rest <strong>of</strong> the trench up to design level with kurkar in<br />

layers 20cm thick each with compaction 98% MDD<br />

and all required tests.<br />

_The work includes removal <strong>of</strong> the surplus<br />

materials outside the site to places as instructed by<br />

the Engineer.<br />

_Supply and installation <strong>of</strong> elbows with any angles,<br />

Tees, Flanges, joints, metallic warning tap, and<br />

other accessories and thrust blocks according to<br />

details.<br />

The covers <strong>of</strong> manholes are made <strong>of</strong> cast iron with<br />

diameter 60 cm engraved by the word " Water " in<br />

English and Arabic. the ring is from cast iron<br />

square shaped with 70*70 cm dimensions. the<br />

concrete which used around the ring is B350 and<br />

should have a Basalts layer <strong>of</strong> 2 cm above the<br />

concrete and around the cover rings. According to<br />

drawings, specifications and Engineer’s instruction.<br />

_Depth <strong>of</strong> trench is 1.4 m in carriage way and 1.1m<br />

in shoulders.<br />

_The price includes cutting the existing asphalt (if<br />

any) in suitable width using machine and reinstate<br />

the road to its original condition using two layers <strong>of</strong><br />

base coarse 15 cm each, supply and spread prime<br />

coat layer (MCO) under the new asphalt layer, and<br />

spread RC2 between the new and the existing<br />

asphalt and the asphalt layer shall be 6 cm thick. In<br />

case the existing pavement is interlock tiling items<br />

should include removal and re-tiling interlock<br />

pavement to the original state including all required<br />

material to complete the pavement layers such as<br />

base coarse, interlock and sand ..etc.<br />

_ The price should include the connection <strong>of</strong> the<br />

new pipes to the existing pipes with all needed<br />

fitting and support to complete the work<br />

Unit<br />

Price<br />

(US$)<br />

Total<br />

(US$)<br />

Contractor’s signature and stamp Page 10


2.1<br />

2.2<br />

2.3<br />

successfully.<br />

-The price include putting magnetic water tape<br />

above the water pipes.<br />

Supply, install 110 mm outside diameter<br />

UPVC Pipes with wall thickness 4.2 mm water<br />

pipes PN 10 . The price should include<br />

excavation <strong>of</strong> the trench 1 m from the design<br />

level <strong>of</strong> the sidewalk, the pipe should be<br />

bedded and covered with at least 20 cm <strong>of</strong><br />

clean dune sand around and at the top and<br />

bottom <strong>of</strong> the pipe , The remaining depth <strong>of</strong> the<br />

trench will be filling with kurkar in layers not<br />

exceeding 20cm each, with compaction not<br />

less than 98 % , up to the design leveling <strong>of</strong> the<br />

road or sidewalk .All works are performed<br />

according to the drawings, specifications and<br />

Engineer’s instruction.<br />

Supply and install 125 cm internal diameter<br />

precast circular reinforced concrete water<br />

manholes, complete with B300 cast in place<br />

reinforced concrete base, cast iron cover (25ton<br />

Capacity), Frame, ring's , the concrete which is<br />

to be used around the ring is B350 for at least<br />

30cm width and depth, Basalt layer <strong>of</strong> 2 cm<br />

thick above the concrete and around the cover<br />

to fix the ring should be supplied and installed,<br />

cast iron steps @ 30cm maximum, excavation<br />

in any type <strong>of</strong> soil to any depth , backfilling<br />

with clean dune sand and compaction 98%<br />

MDD up to the design leveling <strong>of</strong> the roads,<br />

drainage opening with aggregate bed, two<br />

external hot bitumen coating (75/25). Price<br />

shall include all required tests. The price<br />

includes supply and install 4" Gate valve 16<br />

bar working pressure including all needed<br />

fittings, nibbles ,reducers, steel Tee's 16 bar<br />

pressure(T8''x8''x4'') and support to complete<br />

the works successfully. Price shall include all<br />

required tests and all work as per drawings,<br />

specification and Engineer instruction<br />

Connect the proposal water network with<br />

existing water network. The price include<br />

Supply & Install all Flanges, 16 bar Pressure<br />

for Steel Tees ( T12''x12''x4''), ( T6''x6''x4'') &<br />

all fittings required. Price shall include all<br />

required tests and all work as per drawings,<br />

specification and Engineer instruction.<br />

Total <strong>of</strong> Water works<br />

L.M 1200<br />

Unit 2<br />

L.S 1<br />

Contractor’s signature and stamp Page 11


Rehabilitation <strong>of</strong> Daklia Road<br />

PAL10-00071488<br />

Summary:<br />

Description<br />

Total (US$)<br />

Total Roads Works<br />

Total <strong>of</strong> Water works<br />

Grand Total (US$) – Not including Value<br />

Added Tax (VAT)<br />

Grand Total (in letters):-------------------------------------------------------------<br />

Contractor’s Name:------------------------------------------------------------------<br />

Signature and Stamp:----------------------------------------------------------------<br />

Date:-------------------------------------------------------------------------------------<br />

Contractor’s signature and stamp Page 12