Whittier Bridge I-95 Improvement Project Newburyport/Amesbury ...
Whittier Bridge I-95 Improvement Project Newburyport/Amesbury ...
Whittier Bridge I-95 Improvement Project Newburyport/Amesbury ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Project</strong> Description<br />
MassDOT Proposes to Replace the Current Structurally<br />
Deficient John Greenleaf <strong>Whittier</strong> <strong>Bridge</strong> and Improve I-<strong>95</strong><br />
from Exit 57 (Rt 113) to Exit 59 (I-4<strong>95</strong>)<br />
• The 1<strong>95</strong>1 main span is a double-barreled, 3-span continuous<br />
riveted steel through truss.<br />
• Structurally Deficient, Nearing End of Economic Life<br />
• Poor Structural Rating , Excessive Deterioration<br />
• Non-redundant Structure<br />
• Geometrically Deficient<br />
• Highway<br />
• Insufficient Number of Lanes<br />
• Non-conforming Shoulder Width<br />
• Insufficient Number of Lanes<br />
• Exit 58 (Rt 110) Substandard Acceleration/Deceleration Lanes<br />
Innovation, Efficiency, Transparency