24.10.2014 Views

arrow lng plant - Arrow Energy

arrow lng plant - Arrow Energy

arrow lng plant - Arrow Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ARROW LNG PLANT PROJECT UPDATE<br />

MAINLAND LAUNCH SITES AND ACCOMMODATION FACILTIES<br />

Two mainland marine launch site<br />

options are being assessed for the<br />

transfer of personnel to and from Curtis<br />

Island;<br />

‣ Launch Site 1 – located in the mouth<br />

of the Calliope River adjacent to the<br />

RG Tanna Coal Terminal<br />

TWAF 8<br />

Launch Site<br />

4N<br />

Fisherman<br />

’s Landing<br />

North China<br />

Bay<br />

Hamilton<br />

Point<br />

Boatshed<br />

Point<br />

‣ Launch Site 4N – located on the<br />

northern tip of the Western Bay<br />

Dredging Reclamation area<br />

Launch Site<br />

1<br />

Two mainland temporary workers<br />

accommodation facility (TWAF) site<br />

options are being assessed;<br />

Calliope<br />

River<br />

TWAF 7<br />

‣ TWAF 8 – located on Targinie Rd<br />

‣ TWAF 7 – located adjacent to<br />

Gladstone<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!