ARROW LNG PLANT<br />

Geotechnical Investigations<br />

‣ <strong>Arrow</strong> is commencing a drilling program<br />

in June 2012 with both marine and land<br />

based drilling rigs.<br />

‣ The drilling program will target the soil,<br />

rock and sediment located at the<br />

mainland launch site, cross harbour<br />

tunnel, marine facilities and LNG Plant<br />

on Curtis Island.<br />

‣ The program will assess the following:<br />

• Geotechnical properties<br />

• Acid Sulfate Soils (ASS/PSS)<br />

• Dredge sediment characterisation<br />

Jack-up Barge – <strong>Arrow</strong> Drilling Program 2010