Work, including, but not be limited to, the availability and cost of labour, applicable<br />

laws and regulations and facilities for transportation, handling and storage of<br />

materials and equipment and limitation of working days due to monsoon.<br />

It must be understood and agreed that such factors have been properly<br />

investigated and considered in the preparation of the Proposal submitted. No<br />

claims for financial and time adjustment to the Contract awarded for the Work<br />

under these Specifications and Documents will be permitted by the Board/Engineer<br />

which are based on the lack of such prior information or its affect on the cost of the<br />

work and its completion time.<br />

9.0 DEPARTURES FROM SPECIFICATIONS<br />

Tenderers shall base their Proposals on the Tender requirement. However, if they<br />

so desire, they may also submit alternate Proposals on equipment which departs<br />

from these requirement and which would, in the opinion of the Tenderer, be of<br />

benefit to the Board. The Tenderer shall state in detail the departures which he<br />

deems advisable, and how they will be of benefit to the Board. Alternate Proposals<br />

shall be accompanied by drawings showing the suggested layout and<br />

arrangements. Alternative proposal shall be a separate complete proposal with<br />

complete set of drawings, catalogues, manual, etc. without any reference to the<br />

main Proposal. Alternate proposal of only technically responsive lowest evaluated<br />

Tenderer shall be considered.<br />

10.0 INFORMATION TO BE SUPPLIED WITH THE PROPOSALS<br />

Tenderers shall supply sufficient details to permit complete evaluation of all aspects<br />

of the Proposals. Tenderers are requested not to put any clause of their own i.e.<br />

anything outside this Tender Document.<br />

The drawing showing the location and the layout recommended by the Tenderer<br />

shall also be submitted along with the Proposal. Proposals shall be in English and<br />

executed on the Tender Forms, annexed hereto, for that purpose. All the Tender<br />

Forms shall be completely and legibly filled in and all information asked for in the<br />

Tender Documents shall be furnished.<br />

11.0 TIME SCHEDULE<br />

The Construction Schedule in the Tender Documents for performing the specified<br />

work will be a basic consideration of the Contract. The construction schedule<br />

shows the period in calendar days for completion of the Power Plant as desired by<br />

the Board and the estimated equipment delivery and erection time that will be<br />

required to meet this period for completion.<br />

The Tenderer shall furnish with his Proposal, Time Schedule showing the respective<br />

times for manufacture, shipment from shop to the Site, erection, preliminary<br />

testing, trial operation and performance testing for complete Power Plant included<br />

in his Proposal.<br />

Ghorasal 200 MW -300 MW Gas Turbine Peaking Power Plant Project 2nd Re-tender (Vol-1 of 3)<br />

16