APPENDIX-2<br />
FORM OF <strong>TENDER</strong><br />
(SPECIMEN)<br />
SHORT DESCRIPTION OF WORKS:<br />
Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project, Narashingdi<br />
(Note : - Tenderers are required to fill up all the blank<br />
spaces in this Tender Form and Appendices).<br />
To<br />
Bangladesh Power Development Board<br />
GENTLEMEN,<br />
Having examined the Conditions of Contract, Specifications, Drawings, Bill of Quantities<br />
and Addenda Nos. --- dated --- for above named works, and having been satisfied as to<br />
all conditions under which the above named works must be performed, we the<br />
undersigned offer to design, manufacture, furnish, deliver to the Site, store at the Site,<br />
construct civil works, erect, start up, trial operation and put into initial commercial<br />
operation, carry out Performance Tests, be responsible for two year's Warrantee service as<br />
well as LTSA for the next 4 years of the whole of the said works in conformity with the said<br />
Conditions of Contract, Specifications, Bill of Quantities and Drawings etc., for the total<br />
Tender Price of Bangladesh Taka-------------------------------(TK---------------------------------)<br />
and Foreign Currency------------------------------------------------(convertible currency )<br />
2. Should this Tender be accepted by you, we propose to send a representative or<br />
representatives having our Power of Attorney to Dhaka, Bangladesh within 10 days<br />
following receipt of your written acceptance of this Tender for the purpose of executing<br />
a Contract Agreement in the form set out in the Contract Documents with such<br />
alterations or additions thereto as you may require to adopt for such agreement to the<br />
circumstances of this Tender.<br />
3. We undertake if our Tender is accepted to commence the Works within (30) days of<br />
receipt of the Board/Engineer orders to commence and complete all the Work<br />
specified in the Contract Documents so that the unit is ready for initial commercial<br />
operation from the date of the Board/Engineer's order to commence. schedule of<br />
manufacture, delivery, erection, commissioning and making ready for commercial<br />
operation to achieve the aforesaid Initial commercial operation dates are given in the<br />
Appendix-4.<br />
Ghorasal 200 MW -300 MW Gas Turbine Peaking Power Plant Project 2nd Re-tender (Vol-1 of 3)<br />