APPENDIX-2<br />

FORM OF <strong>TENDER</strong><br />

(SPECIMEN)<br />

SHORT DESCRIPTION OF WORKS:<br />

Ghorasal 200 MW to 300 MW Gas Turbine Peaking Power Plant Project, Narashingdi<br />

(Note : - Tenderers are required to fill up all the blank<br />

spaces in this Tender Form and Appendices).<br />

To<br />

Bangladesh Power Development Board<br />

GENTLEMEN,<br />

Having examined the Conditions of Contract, Specifications, Drawings, Bill of Quantities<br />

and Addenda Nos. --- dated --- for above named works, and having been satisfied as to<br />

all conditions under which the above named works must be performed, we the<br />

undersigned offer to design, manufacture, furnish, deliver to the Site, store at the Site,<br />

construct civil works, erect, start up, trial operation and put into initial commercial<br />

operation, carry out Performance Tests, be responsible for two year's Warrantee service as<br />

well as LTSA for the next 4 years of the whole of the said works in conformity with the said<br />

Conditions of Contract, Specifications, Bill of Quantities and Drawings etc., for the total<br />

Tender Price of Bangladesh Taka-------------------------------(TK---------------------------------)<br />

and Foreign Currency------------------------------------------------(convertible currency )<br />

2. Should this Tender be accepted by you, we propose to send a representative or<br />

representatives having our Power of Attorney to Dhaka, Bangladesh within 10 days<br />

following receipt of your written acceptance of this Tender for the purpose of executing<br />

a Contract Agreement in the form set out in the Contract Documents with such<br />

alterations or additions thereto as you may require to adopt for such agreement to the<br />

circumstances of this Tender.<br />

3. We undertake if our Tender is accepted to commence the Works within (30) days of<br />

receipt of the Board/Engineer orders to commence and complete all the Work<br />

specified in the Contract Documents so that the unit is ready for initial commercial<br />

operation from the date of the Board/Engineer's order to commence. schedule of<br />

manufacture, delivery, erection, commissioning and making ready for commercial<br />

operation to achieve the aforesaid Initial commercial operation dates are given in the<br />

Appendix-4.<br />

Ghorasal 200 MW -300 MW Gas Turbine Peaking Power Plant Project 2nd Re-tender (Vol-1 of 3)<br />