Schedule-5<br />
Long Term Service Agreement (LTSA) for 4 years after warrantee period: [Will be considered in<br />
Evaluation]<br />
(Tenderer shall submit item-wise price list with his tender according to the recommendation of the OEM and experience of LTSA provider)<br />
Sl. Description<br />
Foreign currency Bangladesh Taka<br />
No.<br />
Rate Total Rate Total<br />
5A.1 Spare parts & consumables for the 1st year of LTSA 1(one) Lot<br />
5A.2 Service for the 1st year of LTSA (with break-up cost for required service 1(one) Lot<br />
personnel including no. of visits, per-diem cost and expected man-days)<br />
5B.1 Spare parts & consumables for the 2nd year of LTSA 1(one) Lot<br />
5B.2 Service for the 2nd year of LTSA (with break-up cost for required service 1(one) Lot<br />
personnel including no. of visits, per-diem cost and expected man-days)<br />
5C.1 Spare parts & consumables for the 3rd year of LTSA 1(one) Lot<br />
5C.2 Service for the 3rd year of LTSA (with break-up cost for required service 1(one) Lot<br />
personnel including no. of visits, per-diem cost and expected man-days)<br />
5D.1 Spare parts & consumables for the 4th year of LTSA 1(one) Lot<br />
5D.2 Service for the 4th year of LTSA (with break-up cost for required service<br />
personnel including no. of visits, per-diem cost and expected man-days)<br />
Sub-total : 5<br />
N.B: In preparation of the list the tenderer have to consider plant factor as 80%.<br />
1(one) Lot<br />
Ghorasal 200 MW -300 MW Gas Turbine Peaking Power Plant Project 2nd Re-tender (Vol-1 of 3)<br />