26.0 EXCHANGE RATE<br />

For comparison of Proposals, the Board shall convert all the currencies excepting<br />

Bangladesh currency quoted by the Tenderers into Bangladesh Taka. Such<br />

conversions shall be made on the basis of the selling rates for the relevant<br />

currencies quoted by the Sonali Bank on the date of Tender closing and applicable<br />

to similar transactions.<br />

27.0 <strong>TENDER</strong> SECURITY<br />

The Technical & Financial Proposals shall be accompanied by a Tender Security in<br />

the sum not less than US Dollar 1,000,000 (USD one million) in the form of an<br />

unconditional and irrevocable Bank Guarantee (on non-judicial stamp) by a<br />

scheduled bank in Bangladesh or a foreign bank authenticated by a Scheduled Bank<br />

in Bangladesh payable in favour of Secretary, Bangladesh Power Development<br />

Board, WAPDA Building, Motijheel Commercial Area, Dhaka-1000, Bangladesh. Such<br />

Bank Guarantee shall remain valid for a period of twenty-eight [28] days beyond<br />

the original validity period of Tender or beyond any period of extension<br />

subsequently requested under ITT Clause 3.0 days from the date of opening of the<br />

Tender. If a Tenderer withdraws its Tender during the period of Tender validity<br />

specified by the Tenderer on the Tender Form, the Tender Security shall be<br />

forfeited. The scheduled bank shall guarantee that after conclusion of successful<br />

contract negotiation between the Board and the selected Tenderer and upon<br />

Board's issuing notice of award of contract to the successful Tenderer giving him<br />

fifteen (15) day's notice to enter into contract with the Board within the above<br />

notice period. Otherwise the Security and the Bank Guarantee shall be liable to be<br />

forfeited to the Board. Failure to enclose the Tender Security with the Proposal<br />

shall automatically disqualify the Proposal concerned. A Proposal with a Tender<br />

Security in an amount less than US $ 1,000,000 (USD one million) will not be<br />

considered and will be rejected. The Tender Securities of all the unsuccessful<br />

Tenderers will be returned without interest after the successful Tenderer has signed<br />

the contract and furnish the Performance Security. Specimen form of the Tender<br />

Security is furnished in Appendix -1.<br />

28.0 PERFORMANCE SECURITY<br />

The Contract shall be accompanied by a Performance Security in the form of a Bank<br />

Guarantee issued by a Scheduled Bank in Bangladesh on behalf of the Contractor's<br />

banker. The Performance Security shall be in a penal sum not less than ten<br />

percent (10%) of the accepted Tender, conditioned for the complete and faithful<br />

performance of the Contract according to its tenor and effect and the satisfaction of<br />

obligations for the materials used and labour employed in the same, and shall<br />

insure the payment of any obligations, damages, liquidated damages or expenses<br />

for which the Contractor may become liable to the Board. The Contractor's<br />

Performance Security under these specifications shall remain in full force and effect<br />

until the Contractor has fully performed the Contract including the maintenance and<br />

warranty periods set forth in the scope of works of the Technical Requirements.<br />

Unless a different period of time is allowed in the Notice of Tender, the Contract<br />

shall be signed by the successful tenderer within thirty (30) days after receipt of<br />

notice of award. The specimen of Performance Security is furnished at Appendix-5.<br />

Ghorasal 200 MW -300 MW Gas Turbine Peaking Power Plant Project 2nd Re-tender (Vol-1 of 3)<br />