operation and maintenance of equipment/ machinery until acceptance by<br />
the Board. The cost of local purchase and transportation of any Bangladesh<br />
manufactured equipment/ machinery and materials shall also be included<br />
under this category.<br />
iii)<br />
iv)<br />
Prices of essential spare parts & consumables shall be quoted in accordance<br />
with Art. 24.0.<br />
Prices for the training of the Board's personnel at the manufacturer's factory<br />
shall include cost required for the Contractor at manufacturer's factory plus<br />
the required expenditure for the Board's personnel during the training.<br />
v) The Tenderer may submit cost saving proposal (optional) with the financial<br />
offer, but this will not be considered in the evaluation , as the evaluation will<br />
be done on the basis of tender requirement. However, if the Tenderer's<br />
offer found to be lowest at the evaluation, then this cost saving proposal<br />
may be considered during negotiation.<br />
15.0 DEVIATION IN PAYMENT SCHEDULE<br />
Tenderer shall state their Tender price for the payment schedule outlined in the<br />
General Conditions of Contract. Tenders will be evaluated on the basis of this base<br />
price. Tenderers are, however, permitted to state additionally an alternative<br />
payment schedule and indicate the reduction in Tender price they wish to offer for<br />
such alternative payment schedule. The employer may or may not consider the<br />
alternative payment schedule offered by the selected Tenderer.<br />
16.0 CONDITIONS OF CONTRACT<br />
Tenderers are advised that the Contractor will be required to function within<br />
General Conditions and Special Conditions as stipulated in the Tender Document<br />
which will form part of the Contract Documents.<br />
17.0 SOURCE OF FINANCE<br />
The Government of the People's Republic of Bangladesh is expected to receive<br />
foreign financing or to allocate necessary fund in foreign exchange and in<br />
Bangladeshi Taka towards the cost of the project and it is intended that the<br />
proceeds of the fund will be applied for eligible payments under the contract.<br />
18.0 CURRENCY OF PAYMENTS<br />
Currency of payments to be made to the Contractor shall be in U.S. Dollar/Euro and<br />
in Bangladesh Taka which have been described in the General Conditions of the<br />
Contract Document.<br />
19.0 LANGUAGE, UNITS AND DIMENSIONS<br />
The Proposal and data shall be in English, and all dimensions in SI unit and/or<br />
metric unit system.<br />
Ghorasal 200 MW -300 MW Gas Turbine Peaking Power Plant Project 2nd Re-tender (Vol-1 of 3)<br />
20