Potentially<br />
Significant<br />
Impact<br />
Less than<br />
Significant<br />
with<br />
Mitigation<br />
Incorporated<br />
Less<br />
Than<br />
Significant<br />
Impact<br />
No<br />
Impact<br />
Mitigation: No mitigation measures are required.<br />
Monitoring: No monitoring measures are required.<br />
20. Wind Erosion and Blowsand from project either<br />
on or <strong>of</strong>f site.<br />
a) Be impacted by or result in an increase in wind<br />
erosion and blowsand, either on or <strong>of</strong>f site?<br />
D<br />
D<br />
D<br />
Source: Riverside County General Plan Figure S-8 "Wind Erosion Susceptibility Map," Ord. 460,<br />
Sec. 14.2 & Ord. 484<br />
Findings <strong>of</strong> Fact:<br />
a) The site is located in an area <strong>of</strong> Moderate Wind Erodibility rating. The General Plan, Safety<br />
Element Policy for Wind Erosion requires buildings and structures to be designed to resist wind loads<br />
which are covered by the Universal Building Code. With such compliance, the project will not result in<br />
an increase in wind erosion and blowsand, either on or <strong>of</strong>f site. The project will have no impact.<br />
Mitigation: No mitigation measures are required.<br />
Monitoring: No monitoring measures are required.<br />
GREENHOUSE GAS EMISSIONS Would the project<br />
21. Greenhouse Gas Emissions<br />
a) Generate greenhouse gas emissions, either directly<br />
or indirectly, that may have a significant impact on the<br />
environment?<br />
b) Conflict with an applicable plan, policy or regulation<br />
adopted for the purpose <strong>of</strong> reducing the emissions <strong>of</strong><br />
greenhouse gases?<br />
D D D<br />
D D D<br />
Source: Project application materials<br />
Findings <strong>of</strong> Fact:<br />
a) The project is for the installation <strong>of</strong> an unmanned wireless telecommunication facility disguised as a<br />
60 foot high monopalm within a 578 square foot lease area. The installation <strong>of</strong> the monopalm will<br />
involve small-scale construction activities that will not involve an extensive amount <strong>of</strong> heavy duty<br />
eqUipment or labor. Therefore, greenhouse gas emissions generated during construction phase are<br />
minimal. In addition, the powering <strong>of</strong> the cell tower will not require an extensive amount <strong>of</strong> electricity.<br />
Therefore, project is not anticipated to generate greenhouse gas emissions, either directly or<br />
indirectly, that may have a significant impact on the environment.<br />
b) The project will not conflict with an applicable plan, policy or regulation adopted for the purpose <strong>of</strong><br />
reducing the emissions <strong>of</strong> greenhouse gases. The project will have less than significant impact.<br />
Mitigation: No mitigation measures are required.<br />
Page 17 <strong>of</strong> 35 EA No. 42367