<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

The Office will be utilised for a staff operations, including staff sign on/ sign off and administrative<br />

functions (i.e. conferences, training, briefings, and meetings). Details of the proposed facility are provided<br />

in the following summation:<br />

• The office building will have a capacity for 130 operation staff (an increase of 30 additional staff from<br />

the current Sarina office);<br />

• The facility will cater for 24 hours, 7 days a week operation to accommodation the nature of coal rail<br />

operations in the region.<br />

• Pacific National staff shift-on/shift-off periods are irregular, with an expected one-third of the on-shift<br />

staff to be present at the office at any one time.<br />

Car parking will be provided for approximately seventy (70) Pacific National staff vehicles (this will<br />

fluctuate, but should not exceed 70); eight (8) Pacific National vehicles and ten (10) staff transport<br />

vehicles. Due to the irregularity of staff shift on/shift off periods and off-site work areas, the proposed 80<br />

space car parking area designated for the Pacific National office use is considered sufficient.<br />

2.2 SUMMARY AND LIST OF SUPPORTING SPECIALIST <strong>REPORT</strong>S<br />

The following specialist reports and information have been prepared in support of this development<br />

application:<br />

• Plans of Development prepared by i4 Architecture;<br />

• Photographs of the proposed development site, taken 21st November 2011.<br />

• Code Compliance Statements prepared by Wolter Consulting Group<br />

• Traffic Engineering Report prepared by TTM Traffic consultants;<br />

• Landscape Concept Plan prepared by Hywel Jones Landscape Architects<br />

• Detailed Site Survey undertaken by WS Group<br />

• Social Impact Assessment prepared by Warwick Powell (Director, Urban Advisory - SINO<br />

Australia Investment & Trade Group)<br />

It is anticipated that Council may require additional specialist reports to assess the development<br />

application. We expect that the requirement for these will be confirmed by Council during its initial<br />

assessment of the application, and requested as part of an Information Request if required.<br />

This application also includes a copy of correspondence from BHP Billiton Mitsubishi Alliance (BMA)<br />

demonstrating present demand for the facility and a pre-commitment to utilise 100 rooms of the first<br />

stage of the proposed Non-Resident Workforce Accommodation facility to accommodate staff required<br />

for the expansion of the Hay Point Coal Terminal. This pre-commitment clearly demonstrates that the<br />