ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong><br />

<strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

<strong>Proposed</strong> Non-Resident Workforce Accommodation<br />

& Commercial Premises (Office)<br />

Part of Lot 1 RP726644<br />

Armstrong Beach Road, Sarina<br />

Mackay Regional Council<br />

Our Ref: PL2553<br />

Prepared for:<br />

QCV Sarina Pty Limited<br />

March 2012<br />

WOLTER CONSULTING GROUP Page 1


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Wolter Consulting Group ABN 63 366 350 062<br />

Suite 1, Ground Floor, 30 Florence Street QLD 4006.<br />

P.O Box 436, New Farm QLD 4005.<br />

T: (07) 3666 5200 F: (07) 3666 5202 E: brisbane@wolterconsulting.com.au<br />

© Wolter Consulting Group 2011<br />

This document is and shall remain the property of Wolter Consulting Group. The document may only be used for the<br />

purposes for which it was commissioned and in accordance with the Terms of Engagement for the commission.<br />

Unauthorised use of this document in any form whatsoever is prohibited.<br />

Document Status<br />

Rev<br />

No.<br />

Author<br />

Reviewer<br />

Approved for Issue<br />

Name Signature Name Signature Date<br />

0 A. O’Neill S. Spargo S. Spargo 14/03/2012<br />

WOLTER CONSULTING GROUP Page 2


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Development Assessment Report<br />

Contents<br />

EXECUTIVE SUMMARY-------------------------------------------------------------------------------------------------------------------4<br />

Summary Table -------------------------------------------------------------------------------------------------------------------------------4<br />

1 INTRODUCTION---------------------------------------------------------------------------------------------------- 9<br />

2 PROPOSAL---------------------------------------------------------------------------------------------------------10<br />

1.1 GENERAL DESCRIPTION------------------------------------------------------------------------------------------------------------ 10<br />

1.2 GENERAL JUSTIFICATION FOR PROPOSAL / DESIGN ------------------------------------------------------------------------- 10<br />

2.1 PROPOSAL DETAIL ---------------------------------------------------------------------------------------------12<br />

2.2 SUMMARY AND LIST OF SUPPORTING SPECIALIST <strong>REPORT</strong>S--------------------------------------------------------------- 16<br />

3 PRE - <strong>APPLICATION</strong> / CONSULTATION AND HISTORY-----------------------------------------------18<br />

3.1 SITE HISTORY------------------------------------------------------------------------------------------------------------------------ 18<br />

3.2 PRELODGEMENT MEETINGS------------------------------------------------------------------------------------------------------- 19<br />

4 SITE INFORMATION AND ANALYSIS-----------------------------------------------------------------------20<br />

4.1 PHYSICAL DESCRIPTION ----------------------------------------------------------------------------------------------------------- 20<br />

4.2 EXISTING USES ---------------------------------------------------------------------------------------------------------------------- 20<br />

4.3 CONTEXT------------------------------------------------------------------------------------------------------------------------------ 20<br />

5 <strong>ASSESSMENT</strong> FRAMEWORK---------------------------------------------------------------------------------23<br />

5.1 STATE FRAMEWORK ---------------------------------------------------------------------------------------------------------------- 23<br />

5.2 REGIONAL FRAMEWORK ----------------------------------------------------------------------------------------------------------- 23<br />

5.3 LOCAL FRAMEWORK ---------------------------------------------------------------------------------------------------------------- 27<br />

6 REFERRAL AGENCIES -----------------------------------------------------------------------------------------34<br />

7 KEY <strong>DEVELOPMENT</strong> ISSUES---------------------------------------------------------------------------------38<br />

8 CONCLUSIONS AND RECOMMENDATIONS -------------------------------------------------------------41<br />

APPENDICES------------------------------------------------------------------------------------------------------------------43<br />

WOLTER CONSULTING GROUP Page 3


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

EXECUTIVE SUMMARY<br />

Summary Table<br />

Address of Site: Armstrong Beach Road, Sarina<br />

Real Property Description: Part of Lot 1 on RP726644<br />

Area of Subject Site: Approx. 6ha (Part of subject Lot)<br />

Regional Plan Land Use Category: Mackay, Isaac, and Whitsunday Regional Plan – Regional Landscape & Rural Production Area<br />

Area Classification / Local Plan: Open Space Zone – Sarina Shire Planning Scheme<br />

Name of Land Owner: 1 Sarina Golf Club Inc.<br />

Type of Application: 1<br />

Prelodgement / Consultation:<br />

Aspects of<br />

Development<br />

MCU<br />

Type of Approval<br />

Requested<br />

PA<br />

DP<br />

Council:<br />

- DA<br />

Y / N<br />

Date<br />

21 st Nov<br />

2011<br />

Contact Name / Ref<br />

Peter Cardiff, ongoing consultation.<br />

Shane Kleve, Peter Bratt;<br />

prelodgement meeting in Mackay.<br />

RoL<br />

- Other<br />

BW<br />

OW<br />

PA s242 yes no<br />

Referral Agencies:<br />

Transport & Main Roads,<br />

DLGP, Mackay<br />

21 st Nov<br />

2011<br />

29th Feb<br />

2012<br />

Prelodgement meeting with TMR,<br />

Mackay office<br />

Application submitted to DLGP for<br />

referral agency response before<br />

application is made<br />

Community:<br />

Ongoing consultation with land<br />

owners (Sarina Golf Club, and<br />

contact with adjacent owners (QR<br />

National, Jilalan)<br />

Local Councillor:<br />

Consultation and briefings to Mayor<br />

and other Council staff during 2 nd -<br />

half 2011 and early 2012<br />

Other:<br />

BHP Billiton Mitsubishi<br />

Alliance – Hay Point<br />

Expansion Project<br />

February<br />

2012<br />

Consultation with BMA and Bechtel<br />

related to staff accommodation<br />

requirements for the Hay Point Coal<br />

Terminal expansion project – A precommitment<br />

was received (see<br />

Appendix H) confirming staff<br />

accommodation required at the<br />

proposed NRWA facility.<br />

Brief Description/ Purpose of Proposal: Development Permit for Material Change of Use for an Undefined Use (Non-Resident<br />

Workforce Accommodation) & Commercial Premises (Office)<br />

Staged Development: Yes<br />

Referral Agencies: 1 Yes<br />

Agency C / A 2 Referral Agency response received?<br />

Department of Transport and Main Roads yes no<br />

Department of Local Government & Planning yes no<br />

Proposal submitted to DLGP on 29/2/2012 for<br />

referral agency response before application is<br />

made.<br />

Level of Assessment: code code notifiable impact<br />

Public Notification: no yes If Yes: 15 30 business days<br />

Superseded Planning Scheme Application: no yes<br />

1 Preliminary Approval (PA), Development Permit (DP), Material Change of Use (MCU), Reconfiguration of a Lot (RoL),<br />

Building Works (BW), Operational Works (OW).<br />

2 Concurrence (C), Advice (A).<br />

WOLTER CONSULTING GROUP Page 4


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Applicant Contact Person: Wolter Consulting Group Pty Ltd c/- Shane Spargo, Associate Town Planner<br />

(ph) 3666 5200 (f) 3666 5202 sspargo@wolterconsulting.com.au<br />

WOLTER CONSULTING GROUP Page 5


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Figure 1: Simple Site Plan<br />

Summary of Proposal<br />

The proposed development comprises a non-resident workforce accommodation facility to be<br />

constructed by QCV Sarina Pty Limited, and a separate office building to be constructed by QCV Sarina<br />

Pty Limited and operated independently by the Pacific National/ Asciano group for administrative<br />

activities and staff amenities. The development is to be located over land on Armstrong Beach Road,<br />

Sarina. The site is also described as part of Lot 1 on RP726644.<br />

The purpose of the proposed QCV workers accommodation facility is to support local industry and<br />

construction projects by increasing the available short to medium-term accommodation available for<br />

industry and mining workers within the Mackay region.<br />

The proposed Pacific National office use within the development is aimed at providing a purpose-built<br />

office and administrative facility to replace its existing facility within the Sarina Township. The office will<br />

increase capacity for their staff, improve the standard of facilities available, and offer greater efficiency<br />

and functionality for operations through a more appropriate location for its 24 hours, 7 days a week<br />

operational requirements at the facility.<br />

Key Issues<br />

Defined Use<br />

Our review of Schedule 1 of the Sarina Shire Planning Scheme 2005 (Planning Scheme) has identified<br />

that the proposed workers accommodation facility does not fall within a defined use category. However,<br />

Council have confirmed that the definition for Non-resident Workforce Accommodation derived from the<br />

Queensland Planning Provisions is appropriate for the proposed facility. This application therefore seeks<br />

approval for the development as Non-resident Workforce Accommodation, however for the purposes of<br />

WOLTER CONSULTING GROUP Page 6


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

assessment against the planning scheme and other relevant policies and provisions, it is an Undefined<br />

Use.<br />

The proposed office falls within the Commercial Premises use definition in accordance with Schedule 1<br />

of the Planning Scheme.<br />

Non-resident Workforce Accommodation<br />

The proposed Non-resident Workforce Accommodation is intended to provide worker accommodation<br />

opportunities for a variety of mining, construction, and other resource-related industry companies from<br />

both the private and public sectors, which require accommodation for their staff operating in the<br />

Mackay, regional area. This development is responding to a recognised significant shortfall of housing<br />

accommodation suitable for short to medium-term workers in the region. This is despite the region being<br />

renowned for its strong resource industries and mining activities. Detailed plans of the proposed<br />

development are enclosed at Appendix A.<br />

Environmentally Relevant Activity (ERA) 63<br />

The development and operation of a worker’s accommodation facility will require an on-site sewage<br />

treatment facility. For the purposes of compliance and licensing, a sewage treatment facility is<br />

categorised under Section 2 of the Environmental Protection Regulation 2008 as being an ERA 63,<br />

which is identified as “operating 1 or more sewage treatment works at a site that have a total daily peak<br />

design capacity of at least 21EP”. In support of the Non-resident Workforce Accommodation, a<br />

separate development application for an ERA63 will be prepared and lodged with the Department of<br />

Environment and Resource Management (DERM) for their approval and issuing of the appropriate<br />

license for the facility.<br />

Traffic, Transport, and Access<br />

The site was previously subject of a development application for a temporary workers accommodation<br />

facility, which was approved and constructed to house the workforce that undertook the related upgrade<br />

of the Jilalan Railway Yard complex. That facility housed in excess of 200 workers, and provided for a<br />

significant number of private vehicle car parks for staff while they were staying at the facility on-shift.<br />

During prelodgement discussions with both Mackay Regional Council and the Department of Transport<br />

and Main Roads, the potential traffic and transport impacts of the proposed facility were identified as<br />

being a key issue that this application and the operation of the facility would need to address and<br />

appropriately mitigate any impacts.<br />

WOLTER CONSULTING GROUP Page 7


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

In support of this application TTM Traffic consultants have prepared a Traffic Engineering Report which<br />

identifies and addresses any foreseeable traffic and transport impacts from the operation of the facility,<br />

and makes recommendations regarding the management of vehicle moments from the site. This report<br />

is enclosed at Appendix D, and its findings and recommendations are referenced throughout the<br />

application.<br />

Recommendation<br />

This development application for the proposed Non-resident Workforce Accommodation facility and<br />

integrated Office facility is recommended for approval subject to reasonable and relevant conditions.<br />

WOLTER CONSULTING GROUP Page 8


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

1 INTRODUCTION<br />

This town planning development assessment report has been prepared in support of a development<br />

application seeking a Material Change of Use for Non-resident Workforce Accommodation facility and<br />

Commercial Premises (Office) on land at Armstrong Beach Road, Sarina. This site is described as part<br />

of Lot 1 on RP726644.<br />

Please note that throughout this development assessment report and application, given the undefined<br />

nature of the proposed use under the Planning Scheme, the facility will be referred to as a Non-resident<br />

Workforce Accommodation facility in accordance with the definitions within the Queensland Planning<br />

Provisions. This has been agreed to with the assessment manager, Mackay Regional Council, following<br />

prelodgement meeting discussions, and provides the most-appropriate description of the use to be<br />

assessed, approved, and constructed.<br />

This report provides the following information with respect to the assessment of the development<br />

proposal:<br />

• Proposal Overview;<br />

• Site Information and Analysis;<br />

• Assessment Framework;<br />

• Key Planning Issues; and<br />

• Recommendations and Conclusions.<br />

• Appendices<br />

Given the nature of the proposal, a series of technical reports, architectural plans, site survey, and other<br />

supporting information has been prepared and submitted with this development application in support of<br />

the proposal.<br />

WOLTER CONSULTING GROUP Page 9


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

2 PROPOSAL<br />

1.1 GENERAL DESCRIPTION<br />

The proposed development seeks Council approval for a:<br />

• Development Permit for a Material Change of Use for an Undefined Use - Non-resident<br />

Workforce Accommodation; and<br />

• Development Permit for a Material Change of Use for Commercial Premises (Office).<br />

1.2 GENERAL JUSTIFICATION FOR PROPOSAL / DESIGN<br />

The Whitsunday, Isaac and Mackay regional area incorporates an established but also expanding and<br />

evolving industrial, resource and mining sector that are expected to contribute significantly to the<br />

economic development of the region, and the State of Queensland. In particular, the region includes a<br />

number of Major (Sarina, Moranbah, Bowen, Airlie Beach, and Proserpine) and Principal (Mackay)<br />

Regional Activity Centres which comprise developing industrial and construction activities in support of<br />

regional mining and resource activities. These Centres are further complemented by established and<br />

expanding mining and extractive resource operations around Nebo, Moranbah, Clermont, Collinsville<br />

and Middlemount. In support of these operations are ancillary industries including rail haulage and port<br />

services (Hay Point/ Dalrymple Bay) for the export of mined materials, and emerging markets such as<br />

natural and coal-seam gas that will require new infrastructure in the region.<br />

As part of the ongoing expansion and growth of the mining, industrial and construction sectors in the<br />

region, a significant increase in suitable worker accommodation is required to match the growth<br />

anticipated. Without it, the present shortfall of worker accommodation being experienced around Mackay<br />

will continue unabated. The proposed QCV accommodation facility presents an opportunity to address<br />

this need in the Sarina area with respect to an appropriate accommodation type, site context, proximity<br />

to surrounding activities, and accessibility by way of major road and nearby airport services.<br />

The location of the subject site on the fringe of the Sarina Township provides an ideal location for an<br />

accommodation facility of the type proposed, given the previous use of the site for a temporary projectrelated<br />

accommodation facility, and the context of the site to the surrounding road network. This location<br />

provides companies using the facility for its employees with excellent connections to the various mining<br />

and industrial activities and activity centres within the region, as well as specific projects in the region<br />

which have a current demand for accommodation for their employees.<br />

The accommodation facility will provide for short, medium, and long-term lease opportunities for relevant<br />

companies and other private contractors to accommodate workers within appropriate proximity to work<br />

sites and projects.<br />

WOLTER CONSULTING GROUP Page 10


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

The accommodation facility will be largely self-sufficient in terms of its facilities, limiting the need for<br />

resident workers to leave the site while they are in-between daily work shifts. The proposed kitchen,<br />

laundry, and other staff amenities on site will likely utilise local and regional service industries when<br />

sourcing supplies and labour.<br />

By providing substantial facilities on-site for use by staff between shifts, the potential for impacts from<br />

private vehicle usage between rostered stays at the facility will be limited. It is expected that companies<br />

utilising the facility for its employees will make arrangements for pooled transportation of staff to and<br />

from project sites at shift-changes, as well as transporting staff coming in and out of the region by air<br />

through Mackay. The adjoining Sarina Golf Course and other sports, recreation, and social clubs and<br />

groups in Sarina will provide for active recreation and lifestyle opportunities for workers in-between daily<br />

work shifts.<br />

WOLTER CONSULTING GROUP Page 11


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

2.1 Proposal Detail<br />

This application proposes a worker’s accommodation facility to support industry and construction projects<br />

in the immediate vicinity, and also the broader Mackay, Isaac and Whitsunday region. A detailed<br />

synopsis of the development is provided below:<br />

Material Change of Use (Non-resident Workforce Accommodation)<br />

The proposed Non-resident Workforce Accommodation will be located over part of Lot 1 on RP726644<br />

and provided over a two (2) stage program of delivery, comprising the following. Detailed plans of the<br />

development are provided within Appendix A, while a corresponding detailed survey was prepared for the<br />

site, and is contained at Appendix F:<br />

Stage 1<br />

• 402 rooms, comprised of:<br />

o 2x3 Bed Accommodation Building (12m x 9m) – Forty-nine (49) Blocks; and<br />

o 4x3 Bed Accommodation Building (25m x 9m) – Nine (9) Blocks.<br />

• Ancillary facilities, including:<br />

o Kitchen/Dining Building (36.9m x 12m) – One (1) Block;<br />

o Dining Building () - Two (2) Blocks;<br />

o Laundry Building (14.4m x 3.3m) – Six (6) Blocks;<br />

o Gym Building (12m x 12m) – One (1) Block;<br />

o Recreation Hall (18m x 12m) – One (1) Block; and<br />

o Administration Building – One (1) Block.<br />

• Office Building<br />

• 233 Car Parking Spaces<br />

The design capacity for many of the facilities at the development will be well in excess of 600 persons,<br />

including the waste-water treatment plant, and the kitchen, communal and recreational facilities. This is to<br />

ensure that residents of the facility do not experience sub-standard levels of service or comfort. Given the<br />

staging of the development, the majority of service facilities are to be provided as part of Stage 1 but with<br />

a capacity capable of accommodating the additional Stage 2 demand. This intended delivery program will<br />

result in the accommodation facility having a total capacity of 600 persons.<br />

Stage 2<br />

• 198 rooms, comprised of:<br />

o 2x3 Bed Accommodation Building (12m x 9m) – One (1) Block; and<br />

o 4x3 Bed Accommodation Building (25m x 9m) – Sixteen (16) Blocks.<br />

WOLTER CONSULTING GROUP Page 12


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

• Ancillary facilities, including:<br />

o Dining Building (12m x 12m) – One (1) Block;<br />

o Recreation Hall – One (1) Block;<br />

o Laundry Building (14.4m x 3.3m) – Two (2) Blocks.<br />

• 80 Car Parking Spaces.<br />

The timing of the delivery of Stage 2 is yet to be determined, but it can be assumed that it will be based<br />

on demand for the accommodation, and will be constructed within the currency period of the development<br />

application post-approval. The extent of the proposed Staging is shown in the enclosed architecture<br />

plans at Appendix A.<br />

Layout and Facilities<br />

With respect to proposed Stage 1, much of the development will align with the footprint and infrastructure<br />

that existed from the abandoned temporary accommodation facility that has since vacated the site (visible<br />

on the current imagery of the online Google Maps service). In particular, the facilities main Kitchen/Dining<br />

Room, Administration Building, Gym and Recreation Hall will be centrally located, with the three (3) main<br />

accommodation areas surrounding these facilities, supported by smaller ancillary services including<br />

laundry rooms and dining rooms interspersed between them to increase convenience for staff and reduce<br />

walking distances.<br />

Because a significant proportion of staff will arrive to site for their shift roster period via private vehicle, an<br />

adequate car parking area of some 233 car spaces will be provided to cater for the accommodation<br />

facility alone at Stage 1. The number of car parking spaces will increase proportionately with the<br />

establishment of Stage 2, with an additional 80 car spaces to be provided. This car park has the potential<br />

to hold other vehicles for short-term parking, such as site transport buses when not in use, and other<br />

facility service vehicles. .It also provides for sufficient turn-around areas and access for service vehicles<br />

accessing facilities such as the kitchen and laundries.<br />

The bedroom units are self contained with respect to bathroom/ensuite facilities. All connecting walkways<br />

between the units will be covered, and the elevated connecting walkway surfaces will be made from allweather<br />

timber decking or a similar material. Other walkways between units and facilities will either be<br />

concreted, sealed bitumen, or a suitable chip-seal material. The facility will connect with the existing<br />

pathway constructed as part of the previous temporary accommodation facility and still existing. This will<br />

provide pedestrian access from the facility, through the Golf Course, to the Sarina Golf Club clubhouse.<br />

The accommodation facility will provide sufficient amenities for staff comfort, such as televisions in each<br />

room, split-system air-conditioning, and internet access to all rooms across the site. The details of other<br />

WOLTER CONSULTING GROUP Page 13


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

amenities and facilities to be provided are yet to be confirmed, but could be provided to Council during its<br />

assessment of the application.<br />

Infrastructure<br />

• Waste-water treatment<br />

o A waste-water treatment package plant is to be installed to service the accommodation facility.<br />

A separate application for an ERA 63 is currently under preparation and will be lodged with<br />

DERM to ensure the workers accommodation camp is suitably serviced by a package plant<br />

sewage treatment facility in accordance with the requirements of the ERA 63 provisions of the<br />

Environmental Protection Regulation 2008. This sewage treatment system will be designed<br />

specifically to be in excess of the required Equivalent Persons (EP), accommodating the<br />

envisaged peak workforce of 600 staff.<br />

• Power supply<br />

o Permanent site power supply will be via an existing Ergon overhead supply that travels along<br />

Armstrong Beach Road adjacent to the site. Access to this supply is currently being submitted<br />

to Ergon for both Stages of the project. The previous abandoned accommodation facility<br />

utilised this connection.<br />

• Water supply<br />

o Water supply is currently being organised by the developers of the facility, and will likely be<br />

sourced from the town water mains supply. During prelodgement discussions with Council<br />

staff, we were made aware that insufficient water pressure may exist in the area of the<br />

development to service the facility by gravity feed. In that event, a tank storage arrangement<br />

will be installed, from which the development will be serviced under pressure by pump. The<br />

previous abandoned accommodation facility utilised a similar arrangement to connect to the<br />

town water supply.<br />

Noise<br />

Given the context of the site and proximity to Armstrong Beach Road and the Jilalan Railyards/<br />

Goonyella Rail network, it is expected that the accommodation will be somewhat affected by existing<br />

noise impacts. However, as per the enclosed architectural plans and prepared site survey the following<br />

measures have been incorporated to reduce the potential for sleep-disturbing noise impacts:<br />

o the setback and orientation of accommodation buildings on the site,<br />

o the utilisation of an existing earth-bund along the Armstrong Beach Rd boundary,<br />

o the retention of existing and planting of supplementary vegetation around the extents of<br />

the property; and,<br />

o the use of air-conditioning within the units to enable windows to be closed.<br />

WOLTER CONSULTING GROUP Page 14


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Access<br />

Access to the accommodation facility is to be gained via the pre-established vehicular crossover to<br />

Armstrong Beach Road. However, given the capacity increase of the accommodation facility in<br />

comparison to the previous 200-person temporary facility,, the access and internal driveway/carpark area<br />

is to be upgraded to ensure safe, all-weather access for vehicles entering and exiting the site. This will<br />

include new linemarking and turning-lane provision along Armstrong Beach Road, in accordance with the<br />

recommendations within the TTM Traffic Engineering Report enclosed at Appendix D. This report also<br />

details the internal vehicle circulation proposed, demonstrating all vehicle types anticipated to be servicing<br />

the facility can be accommodated in the proposed design.<br />

The proposed accommodation facility will also incorporate an emergency access road around the main<br />

accommodation area in the event that emergency services are required to access an area of the facility<br />

away from car parks and access roads. They will also be used by facility service vehicles during cleaning<br />

and other maintenance activities to the facility. No staff is to use personal vehicles to access these<br />

emergency access roads and areas of the facility, with private vehicles to be restricted to the designated<br />

driveway and parking areas for safety reasons.<br />

Site Selection<br />

The site was selected based on the following factors:<br />

• to ensure that the accommodation facility would be free from stormwater and flood impacts,<br />

• the site would have limited potential for impacts on or constraints from any nearby existing<br />

residential uses,<br />

• be suitably located with a high level of access to surrounding major roads that connect it with the<br />

centres and major project sites nearby and elsewhere in the region; and,<br />

• be located on a site under single ownership, and with adequate infrastructure services to the<br />

site.<br />

Furthermore, the site has been subject to a previous development application for a Temporary Workers<br />

Accommodation which operated up until early 2010 (estimated). The proposed new Non-resident<br />

Workforce Accommodation will utilise the existing development footprint and services over the site left<br />

abandoned from the previous temporary facility. Further details of the previous use and development<br />

footprint are detailed in Section 3.1 of this Report.<br />

Material Change of Use (Office)<br />

While the proposed Office is to be co-located with the workers accommodation facility, the office will be<br />

independently run by Pacific National–Asciano. The office is proposed as an upgrade to the existing<br />

Pacific National office and staff amenity facility located on Broad Street (Bruce Highway) within Sarina.<br />

WOLTER CONSULTING GROUP Page 15


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

The Office will be utilised for a staff operations, including staff sign on/ sign off and administrative<br />

functions (i.e. conferences, training, briefings, and meetings). Details of the proposed facility are provided<br />

in the following summation:<br />

• The office building will have a capacity for 130 operation staff (an increase of 30 additional staff from<br />

the current Sarina office);<br />

• The facility will cater for 24 hours, 7 days a week operation to accommodation the nature of coal rail<br />

operations in the region.<br />

• Pacific National staff shift-on/shift-off periods are irregular, with an expected one-third of the on-shift<br />

staff to be present at the office at any one time.<br />

Car parking will be provided for approximately seventy (70) Pacific National staff vehicles (this will<br />

fluctuate, but should not exceed 70); eight (8) Pacific National vehicles and ten (10) staff transport<br />

vehicles. Due to the irregularity of staff shift on/shift off periods and off-site work areas, the proposed 80<br />

space car parking area designated for the Pacific National office use is considered sufficient.<br />

2.2 SUMMARY AND LIST OF SUPPORTING SPECIALIST <strong>REPORT</strong>S<br />

The following specialist reports and information have been prepared in support of this development<br />

application:<br />

• Plans of Development prepared by i4 Architecture;<br />

• Photographs of the proposed development site, taken 21st November 2011.<br />

• Code Compliance Statements prepared by Wolter Consulting Group<br />

• Traffic Engineering Report prepared by TTM Traffic consultants;<br />

• Landscape Concept Plan prepared by Hywel Jones Landscape Architects<br />

• Detailed Site Survey undertaken by WS Group<br />

• Social Impact Assessment prepared by Warwick Powell (Director, Urban Advisory - SINO<br />

Australia Investment & Trade Group)<br />

It is anticipated that Council may require additional specialist reports to assess the development<br />

application. We expect that the requirement for these will be confirmed by Council during its initial<br />

assessment of the application, and requested as part of an Information Request if required.<br />

This application also includes a copy of correspondence from BHP Billiton Mitsubishi Alliance (BMA)<br />

demonstrating present demand for the facility and a pre-commitment to utilise 100 rooms of the first<br />

stage of the proposed Non-Resident Workforce Accommodation facility to accommodate staff required<br />

for the expansion of the Hay Point Coal Terminal. This pre-commitment clearly demonstrates that the<br />

WOLTER CONSULTING GROUP Page 16


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

accommodation facility is an activity associated with primary industry activities or construction work for<br />

primary industry purposes occurring in the surrounding area.<br />

WOLTER CONSULTING GROUP Page 17


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

3 PRE - <strong>APPLICATION</strong> / CONSULTATION AND<br />

HISTORY<br />

3.1 SITE HISTORY<br />

The site has been subject to a previous Development Approval in 2008 for a Temporary Construction<br />

Accommodation Village (Council Ref: MCU-00053). This facility existed for approximately 15 to 18<br />

months, and was removed at the end of its requirement to support the upgrade of the adjacent Jilalan<br />

Railway Yard at that time. The use included three (3) accommodation areas comprising a total of 74<br />

four person units, supported by administration, kitchen/dining, recreation, and service buildings (Please<br />

refer to Figure 2 below. The aerial photograph illustrates the previous camp during operation). In<br />

accordance with the Schedule of Conditions of its approval, the use was decommissioned prior to<br />

January 2010 with all buildings removed from the site.<br />

Figure 2: Aerial Photograph of previous Temporary Construction Accommodation Village<br />

(subject of DA Ref: MCU-00053)<br />

Source: Google Maps<br />

The balance of the subject Lot, Lot 1 RP726644 contains some areas of the Sarina Golf Club golf<br />

course, as well as a man-made water storage dam used for irrigation by the golf club on the course. The<br />

site also contains vegetation to the north and north-east of the facility that will remain unaffected by the<br />

development.<br />

WOLTER CONSULTING GROUP Page 18


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

3.2 PRELODGEMENT MEETINGS<br />

Mackay Regional Council<br />

An initial prelodegment meeting was held on 17 May 2011 between representatives of Mackay Regional<br />

Council planning (Shane Kleve) and engineering staff (Peter Bratt), and Shane Spargo of Wolter<br />

Consulting Group, Lee Bermingham representing QCV Australia Pty Limited, and Brian Camilleri of<br />

TTM Group consultants. This meeting was used to discuss key planning issues associated with the<br />

proposed development, as well as confirming the nature of the development application required.<br />

Transport And Main Roads<br />

A prelodgement meeting was held on 21 st November 2011 with Transport and Main Roads officers Ross<br />

Young and Ainsley Welch and project representatives Shane Spargo of Wolter Consulting Group, and<br />

Brian Camilleri of TTM Group consultants. The primary matter discussed at this meeting was the<br />

potential for impacts on the intersection of Armstrong Beach Road, and the Bruce Highway. The<br />

enclosed Traffic Engineering Report was prepared in response to these discussions and the issues<br />

raised by TMR.<br />

Department of Local Government and Planning<br />

No prelodgement meeting was held with Department representatives, however several initial phone<br />

discussions were held between project representative Shane Spargo of Wolter Consulting Group, and<br />

Ms Shantelle Ianna of the Mackay DLGP office. These conversations confirmed the status of the<br />

relevant Draft Regional Plan applying to the development at that time, and confirmation of how the site<br />

was represented in the Plan.<br />

The adoption of the Mackay, Isaac, Whitsunday Regional Plan in February 2012 required further<br />

enquires to DLGP officers in Mackay, including Ms Katrina Clarke (Principal Planner). As a result of our<br />

interpretation of the adopted regional plan, the application was referred to the Department for their<br />

comment prior to lodgement of this application. This early referral sought to confirm that the<br />

development is not a material change of use to which division 2 of the State planning regulatory<br />

provisions for the Mackay, Isaac and Whitsunday Regional Plan applies.<br />

This development application demonstrates that there is an over-riding and urgent need for the<br />

proposed Non-Resident Workforce Accommodation facility to support associated primary industry<br />

activities in the surrounding area and the larger Mackay, Isaac and Whitsunday region.<br />

The key issues identified in all of these meetings have been addressed in detail in Section 7 of this<br />

report.<br />

WOLTER CONSULTING GROUP Page 19


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

4 SITE INFORMATION AND ANALYSIS<br />

4.1 PHYSICAL DESCRIPTION<br />

The site of this development application is formed by part of Lot 1 on RP726644 and has a total area of<br />

6ha. A detailed survey of this site is provided at Appendix F. Under the Sarina Planning Scheme, the<br />

site is located in the Open Space Zone and forms part of the Sarina Golf Club. However, the portion of<br />

Lot 1 which forms the subject site has been previously used for the purposes of a temporary<br />

Construction Accommodation Village. To assist in minimising the potential of any detrimental impacts to<br />

the site or surrounding area, the proposed Non-resident Workforce Accommodation facility will utilise the<br />

pre-established development footprint of the previously-approved use, with the footprint to extend further<br />

west over land that is clear of any significant vegetation. The subject site has a single frontage to<br />

Armstrong Beach Road, with vehicular access gained by an existing vehicular crossover which<br />

previously serviced the Temporary Construction Accommodation Village once on the site. Details of the<br />

proposed cross-over are provided in the enclosed Traffic Engineering Report at Appendix D.<br />

Recent photographs of the site of the proposed use are contained within Appendix B of this report.<br />

4.2 EXISTING USES<br />

The site is currently vacant; with the previous Temporary Workers Accommodation Village<br />

decommissioned and all buildings removed from the site subject of its approval (Council Ref: MCU-<br />

00053).<br />

4.3 CONTEXT<br />

The subject site is located approximately 3km south-east of the centre of the township of Sarina, and<br />

some 40km south of Mackay via the Bruce Highway. Its distance from Sarina limits the potential for any<br />

conflict with the existing low-density residential housing that dominates the township, while still ensuring<br />

that it is within close proximity to utilise its services. The proximity to Sarina can be seen in the aerial<br />

imagery and map provided in Figures 3 and 4 respectively.<br />

The subject site is formed by under-utilised land under ownership of the Sarina Golf Club, and located to<br />

the east of the extent of the golf course complex. The golf course immediately surrounds the site to the<br />

north and west, which can be seen in the aerial imagery in Figure 3. Pedestrian access to the course<br />

will be available via the existing footpath constructed to make the same connection for the previous<br />

temporary worker accommodation facility at the same site.<br />

WOLTER CONSULTING GROUP Page 20


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

The wider surrounding area is predominantly formed by rural uses, in particular sugar cane farming, with<br />

the exception of the Jilalan Railyards located directly opposite the south-east corner of the subject site.<br />

The proposed Non-resident Workforce Accommodation facility will be complimentary to this extensive<br />

and state-significant rail industry complex, given its support of the mining and industrial projects in the<br />

area.<br />

The nearest residential dwelling visible from the site is approximately 550m from the proposed<br />

development westwards along Armstrong Beach Road towards the Bruce Highway. This dwelling is a<br />

sugar cane farm farmhouse, and its view of the subject site is dominated by the Jilalan Railway Yard<br />

complex adjacent to the development. It is argued that the visual impact currently experienced by this<br />

dwelling from the Jilalan Railway Yard complex will remain far more significant that the proposed<br />

accommodation facility.<br />

WOLTER CONSULTING GROUP Page 21


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Figure 3: Aerial Map (subject site depicted by red outline)<br />

Source: Google maps<br />

Subject Site<br />

Figure 4: Locality Plan (approximate subject site depicted by indicative circle)<br />

Source: Google maps<br />

WOLTER CONSULTING GROUP Page 22


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

5 <strong>ASSESSMENT</strong> FRAMEWORK<br />

The development application will be assessed against relevant provisions of the Sustainable Planning<br />

Act 2009 (SPA), other State legislation, the Sarina Shire Planning Scheme and supporting planning<br />

policies. Consideration of this assessment framework is outlined below.<br />

5.1 STATE FRAMEWORK<br />

The statutory framework for decision making in relation to land use and development in Queensland is<br />

contained within the Sustainable Planning Act 2009 (SPA) and its subordinate legislation. The relevant<br />

Planning Scheme against which this application is assessed is the Sarina Shire Planning Scheme<br />

(Sarina Planning Scheme), which is governed by the Mackay Regional Council following Council<br />

amalgamations.<br />

The key responsibilities of the State in relation to development are to oversee and ensure that:<br />

• State, Regional and Local planning legislation is appropriately implemented under SPA;<br />

• State interests and policies are integrated within the land use planning and development<br />

assessment framework through State planning instruments; and<br />

• IDAS is maintained as an efficient and effective development assessment system.<br />

As further identified within SPA, the assessment manager for the application is the Mackay Regional<br />

Council, and referral of the development application to State Agencies is reviewed within Section 6 –<br />

Referral Agencies of this report.<br />

5.2 REGIONAL FRAMEWORK<br />

The Mackay, Isaac and Whitsunday (MIW) Regional Plan 2011-2031 (referred to as the Regional Plan)<br />

was adopted on 8 February 2012 and provides the framework for managing growth, change, land use<br />

and development in the MIW region to the year 2031. The Regional Plan represents an agreed<br />

Queensland Government position on the future of MIW and takes precedence over all other planning<br />

instruments.<br />

The subject site is located within the Regional Landscape and Rural Production Area of the regional plan<br />

and is subject to Section 2.1 (Material Change of Use outside the Urban Footprint) of Division 2 under<br />

the MIW State Planning Regulatory Provisions 2012. While the proposed site of the development will be<br />

located outside of the Urban Footprint area of the adopted Regional Plan, it is our interpretation the<br />

proposed Non-Resident Workforce Accommodation use is not defined as a Residential Development, or<br />

an Urban Activity according to Schedule 2 (s2.1 and s2.2) of the Regional Plan. Therefore the<br />

WOLTER CONSULTING GROUP Page 23


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

development is not a material change of use to which division 2 of the State planning regulatory<br />

provisions for the Mackay, Isaac and Whitsunday Regional Plan applies.<br />

While Division 2 of the WIM Regional Plan may not apply, the proposal is considered to be consistent<br />

with the key principles and policies of the relevant Desired Regional Outcomes (DROs) of the Regional<br />

Plan, as demonstrated in Table A below.<br />

Table A – Desired Regional Outcomes<br />

Desired Regional Outcomes<br />

Our Response<br />

5. Strong Communities<br />

Principle 5.5.1<br />

The long term viability of resource communities is sustained by enhancing liveability, providing diverse<br />

housing and employment options and accommodating the needs of the resource sector.<br />

Policy 5.5.3<br />

Flexible living arrangements are available and are<br />

reflected in housing stock diversity, choice, and<br />

affordability; including the needs of FIFO and DIDO<br />

workers, while ensuring workers are not<br />

disadvantaged based on employment status<br />

Policy 5.5.7<br />

Planning for workers’ accommodation and<br />

infrastructure must address the impacts of the<br />

site’s eventual closure.<br />

Policy 5.5.10<br />

Continue to monitor the number and location of<br />

non-resident workforces in the Bowen Basin to<br />

The proposed Non-resident Workforce<br />

Accommodation facility provides a temporary<br />

housing outcome for non-permanent, non-resident<br />

workers associated with mining and construction<br />

industry projects in the surrounding area. By<br />

providing the accommodation facility in this location<br />

minimises risk of pricing-out lower income groups<br />

of residential opportunities in the Sarina township,<br />

as well as allowing fly-in, fly-out workers to position<br />

their usual place of residence (and families) out of<br />

town, minimising any social disruption.<br />

The proposed accommodation facility is expected<br />

to have an ongoing life span linked with the need<br />

for accommodation to support primary industry,<br />

mining, and construction projects in the<br />

surrounding area and the region.<br />

However, at which time the facility does cease<br />

operation, the site will be vacated and any natural<br />

features existing at the site at the time of<br />

occupation will have been protected and then reinstated.<br />

The current workforce demand generated by<br />

primary industry, mining and construction projects<br />

has significantly strained accommodation<br />

WOLTER CONSULTING GROUP Page 24


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

assist future social infrastructure provision. opportunities in nearby townships and the region.<br />

As demonstrated through with the pre-commitment<br />

for accommodation provided by BMA (enclosed<br />

with this application), the proposed NRWA facility<br />

provides a temporary accommodation option for<br />

various companies associated with significant<br />

mining and construction projects underway or<br />

about to commence in the surrounding area and<br />

the region.<br />

By making this development application and<br />

securing the required development permit, regional<br />

planning authorities and the local government can<br />

monitor this and other NRWA facilities to ensure<br />

that adequate social infrastructure can be provided<br />

as workforces grow.<br />

7. Managing Growth<br />

Principle 7.4.1<br />

Housing meets the needs of the community, considering all lifecycles stages, varying demands, and<br />

economic circumstances.<br />

Policy 7.4.6<br />

The proposed facility provides temporary<br />

Provide housing and accommodation for temporary accommodation for fly-in and fly-out workers<br />

residents and employees involved in industrial associated with the region’s primary industry<br />

development, mining and construction, and mining and construction projects directly in<br />

seasonal work.<br />

accordance with this policy item.<br />

Policy 7.4.7<br />

The location of the proposed facility will ensure any<br />

Ensure the scale and number of people potential social impacts as a result of temporary<br />

accommodated by non-resident worker accommodation are avoided. In particular, the<br />

accommodation is compatible with the nearby provision of this NRWA facility in conjunction with<br />

permanent residential population.<br />

longer-term workforce accommodation such as<br />

housing rental accommodation provides much<br />

needed housing diversity in the Sarina area, and<br />

reduces the proven demand that housing<br />

temporary workforces can place on longer-term<br />

accommodation options.<br />

The location of this NRWA facility and the nature of<br />

the shift work undertaken by its residents ensures<br />

that it is compatible with its immediate surrounds,<br />

WOLTER CONSULTING GROUP Page 25


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Policy 7.4.8<br />

Facilitate the location of non-resident worker<br />

accommodation to ensure access to services and<br />

community integration, and social cohesion with<br />

the existing community.<br />

and that it will not conflict with existing residential<br />

areas in Sarina.<br />

The proposed development is strategically located<br />

to ensure that its residents have direct access to<br />

major roads, nearby railway facilities and rail<br />

corridors so that this workforce can quickly access<br />

primary industry activities and projects in the<br />

surrounding area and region.<br />

Its location also ensures that it is in close proximity<br />

to the Sarina township to ensure that the residents<br />

have the opportunity to integrate with the<br />

community when staying at the facility..<br />

WOLTER CONSULTING GROUP Page 26


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

5.3 LOCAL FRAMEWORK<br />

The proposal requires assessment against the provisions of the Sarina Planning Scheme, including the<br />

Strategic Framework, Desired Environmental Outcomes (DEOs), zoning and any relevant planning<br />

scheme policies and codes. Specifically, this application has been identified as requiring assessment<br />

against the relevant strategies of the Strategic Framework and the Desired Environmental Outcomes<br />

contained in Part 1 and 2 respectively of the Sarina Planning Scheme. The application will also require<br />

a full assessment against the relevant primary, secondary and overlay code provisions.<br />

The application for an Undefined Use – Non-resident Workforce Accommodation facility within the Open<br />

Space Zone is subject to Impact Assessment in accordance with the relevant provisions of Sarina<br />

Planning Scheme and thus will be subject to public notification.<br />

5.3.1 Strategic Framework<br />

The development proposal has been assessed against the relevant development guidelines outlined in<br />

the Strategic Framework contained in Part 1, Division 2 of the Sarina Planning Scheme.<br />

The proposed development achieves the Broad Strategies for the Sarina Shire as listed and addressed<br />

in Table 3 below.<br />

Table 3: Strategic Framework<br />

Broad Strategies for Sarina Shire<br />

Residential, commercial, industry, community and<br />

recreation uses are:<br />

(a) Primarily located in Sarina town, Koumala, and the<br />

beachside communities at Louisa Creek, Half Tide,<br />

Salonika Beach, Grasstree Beach and Grasstree,<br />

Campwin Beach, Sarina Beach, Armstrong Beach and<br />

Freshwater Point; and<br />

(b) Only located outside these areas where they cannot be<br />

practicably located in the towns due to their nature,<br />

scale, effects or necessary relationship to other<br />

activities, particularly cultural heritage features, natural<br />

features, resources or infrastructure.<br />

Sarina Town is the main commercial and community centre<br />

in the Shire.<br />

The shire remains a productive rural area which manages<br />

its agricultural land resource to ensure this continues.<br />

Response<br />

The proposed Non-resident Workforce<br />

Accommodation facility is located on the fringe of<br />

the Sarina township. The accommodation facility<br />

is appropriately located to capitalise on industrial<br />

and mining operations in the wider region given<br />

its location and proximity to major roads<br />

connecting to mining projects and ports.<br />

The site’s previous operation as a temporary<br />

accommodation facility approved by Council<br />

demonstrates that the proposed facility is<br />

appropriate in this location.<br />

The proposed Non-resident Workforce<br />

Accommodation facility is not to be located in the<br />

Sarina township. However, its proximity to the<br />

Sarina Township will provide easy access to the<br />

town’s services for future workers during on-shift<br />

and transitioning between shift periods.<br />

Because of its location on the town’s outskirts, it<br />

will be able to support Sarina’s role as the<br />

Shire’s main commercial and community centre.<br />

The subject site is not identified as land intended<br />

for rural purposes. The previous use of the site,<br />

WOLTER CONSULTING GROUP Page 27


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Broad Strategies for Sarina Shire<br />

Response<br />

for a similar purpose, re-iterates the<br />

appropriateness of this location for a Workers<br />

accommodation facility.<br />

Its underlying zoning is Open Space.<br />

Rural residential development is encouraged in the northeastern<br />

part of the Shire in locations which avoid productive<br />

rural lands and ecological assets, do not intrude on the long<br />

term economic role of the Hay Point facility, and are located<br />

within reasonable distance of necessary community<br />

facilities.<br />

Tourist facilities are located where necessary to take<br />

advantage of the economic potential of the Shire.<br />

Agricultural and extractive uses are located within the rural<br />

area as necessary to take advantage of the economic<br />

potential of the areas’ natural resources and are protected<br />

for their long term contribution to the Shire’s economy.<br />

The extensive ecological resources and landscape values<br />

of the Shire are protected and integral to the Shire’s<br />

character and tourist potential.<br />

The Hay Point facility is recognised for its important<br />

economic function to the state of Queensland and its future<br />

operation and expansion is not impeded by encroaching<br />

residential or other incompatible land uses.<br />

The identified road hierarchy and railway corridors are<br />

protected from inappropriate development.<br />

Buildings and structures reflect the existing character of<br />

each community and are consistent with the visual amenity<br />

of the respective area.<br />

New uses and works are located, designed and managed in<br />

ways that maximise the efficiency of infrastructure, and of<br />

compatibility with other uses, works, cultural heritage<br />

features, natural and cultural resources.<br />

The proposal is for a Non-resident Workforce<br />

Accommodation facility and will not jeopardise the<br />

future development or amenity of future rural<br />

residential uses.<br />

Given its proximity to the Goonyella Railway<br />

corridor connecting to Hay Point, it is not<br />

expected that Rural Residential development will<br />

encroach on the site of the facility.<br />

The site is not located in the north-eastern part of<br />

the Shire, as referenced in the relevant Broad<br />

Strategy.<br />

The proposed Non-resident Workforce<br />

Accommodation facility will not detract from any<br />

tourist facilities operating in the wider region.<br />

The proposal is for a Non-resident Workforce<br />

Accommodation facility which will not be located<br />

over rurally zoned land.<br />

The proposed Non-resident Workforce<br />

Accommodation facility will not jeopardise the<br />

ecological resources or landscape values of the<br />

local area. In particular, the proposed use will<br />

operate over a site which has been previously<br />

utilised for a similar use, with emission and waste<br />

mitigation measures to be adopted.<br />

The proposed use will not have any impact upon<br />

the Hay Point facility, and will contribute to its<br />

economic function by supporting the regional<br />

resource industries that supply the port.<br />

The proposed Non-resident Workforce<br />

Accommodation facility will not jeopardise the<br />

Sub-Arterial nature of Armstrong Beach Road.<br />

The proposed demountable structures are<br />

appropriate given the site’s context and proximity<br />

to the Jilalan Railway Yard industrial complex.<br />

The proposed worker’s accommodation facility<br />

will utilise a similar development footprint to the<br />

previous temporary workers accommodation<br />

facility that existed over the site.<br />

The Dudgeon Point/ Bally Keel area is recognised for its<br />

potential for new industry. This potential is also recognised<br />

in the regional planning framework for Whitsunday<br />

Hinterland and Mackay region. This potential relates to<br />

major industry, manufacturing and port related industry and<br />

The subject site is not located within the Dudgeon<br />

Point/ Bally Keel area.<br />

WOLTER CONSULTING GROUP Page 28


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Broad Strategies for Sarina Shire<br />

Response<br />

will only be realised where detailed and comprehensive<br />

investigations demonstrate that all necessary infrastructure<br />

(including appropriate transport access and water supply) is<br />

provided; the development is consistent with the<br />

environmental values of the locality (including coastal and<br />

marine precincts); development is ecologically sustainable;<br />

and the amenity of the surrounding rural residential and<br />

rural areas is protected.<br />

WOLTER CONSULTING GROUP Page 29


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

5.3.2 Desired Environmental Outcomes<br />

The development proposal has been assessed against Council’s Desired Environmental Outcomes<br />

(DEOs) contained in Part 3 of the Sarina Shire Planning Scheme.<br />

The proposed development achieves the DEOs as listed and addressed in Table 4 below.<br />

Table 4: Desired Environmental Outcomes<br />

Desired Environmental Outcomes<br />

The overall biodiversity and coastal values of the Shire are<br />

maintained, and natural ecological processes are protected<br />

and enhanced.<br />

Response<br />

The accommodation facility will be located on<br />

land that has been previously utilised for the<br />

same purpose. Given the self-containment of the<br />

facility in terms of emission outputs, it is<br />

considered that the facility will not affect the<br />

biodiversity and coastal values of the Shire. By<br />

utilising a previously-developed site, the<br />

proposed Non-resident Workforce<br />

Accommodation facility will not impact on the<br />

biodiversity and coastal values of the Shire, as<br />

well as protecting the natural ecological<br />

processes by locating on a Brownfield site.<br />

The Shire’s natural resources, including its agricultural soils,<br />

fisheries, timber resources and construction materials, are<br />

protected and utilised in a manner that ensures their<br />

ecological and economic values are available for future<br />

generations.<br />

Due to the sites prior use as an accommodation<br />

village, the natural resources are conserved<br />

because the proposed development seeks to<br />

only exist within a similar footprint of the<br />

previous use. This allows for conservation of<br />

surrounding existing vegetation and minimal<br />

disturbance of the surrounding area.<br />

Sarina Shire contains a prosperous community with a<br />

sustainable industrial and rural base, with a wide range of<br />

employment opportunities due to the diversity of local<br />

industries, including the Port of Hay Point, the Plane Creek<br />

Sugar Mill and Distillery, Jilalan QR maintenance yards, the<br />

cane industry and new rural industries, home based<br />

business activities and tourism (particularly at Sarina Beach<br />

and Salonika Beach), and through Sarina Township<br />

performing a strong role as the main service centre for the<br />

Shire.<br />

Reconfiguration of lots and material changes of use for<br />

urban and rural residential purposes are located where they<br />

increase the efficient and sustainable use of existing<br />

infrastructure in terms of water supply, stormwater<br />

management and waste disposal and projects infrastructure<br />

(including transport corridors) from inappropriate activities.<br />

Places of cultural significance in the Shire (Indigenous and<br />

non-Indigenous settlement) are respected, the village<br />

character in the Shire settlements is maintained and the<br />

relationship of traditional owners to the land and water<br />

The proposed Non-resident Workforce<br />

Accommodation will allow for a larger workforce<br />

to exist within the Sarina township in support of<br />

major projects underway or proposed in the<br />

region. Accommodation for this workforce will<br />

allow existing and new industries to continue<br />

with certainty that workers can be<br />

accommodated, which will contribute to making<br />

Sarina Shire a even more prosperous<br />

community in the region.<br />

The proposed accommodation facility is<br />

appropriately located to ensure efficient and<br />

sustainable use of existing infrastructure, such as<br />

the existing major road network, the existing town<br />

water supply, and waste disposal systems in the<br />

immediate area. It will not impact on or constrain<br />

future infrastructure projects such as transport<br />

corridors.<br />

The proposed development does not affect any<br />

areas of cultural significance. During construction,<br />

the relevant Cultural Heritage legislation and<br />

guidelines will be followed.<br />

WOLTER CONSULTING GROUP Page 30


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Desired Environmental Outcomes<br />

Response<br />

resources is recognised.<br />

Sarina Shire offers a high standard of living with a range of<br />

different residential lifestyles and housing types. New<br />

residential (both urban and rural residential) areas are<br />

developed in an efficient and sustainable manner with regard<br />

to infrastructure, are accessible to services provided in<br />

established settlements and maintain amenity by avoiding<br />

the establishment of adjacent incompatible land uses.<br />

Residents of the Shire and visitors have a high level of<br />

access to community services and facilities, including public<br />

transport.<br />

The proposed Non-resident Workforce<br />

Accommodation facility provides an alternative<br />

living arrangement for temporary workers and<br />

allows for some living flexibility from traditional<br />

long-term housing in the area. This type of<br />

development is sustainable because of the low<br />

impact on the natural environment as well as the<br />

built environment, and the way it can be rapidly<br />

deployed in response to new major projects in<br />

the region. The adjacent Open Space and<br />

Industrial land uses do not present a conflict with<br />

the proposed use, given the previous use of the<br />

site as a temporary accommodation facility.<br />

While the site is some distance from established<br />

residential development in Sarina township, its<br />

proximity still allows and promotes accessibility<br />

to existing services in Sarina town.<br />

The location of the proposal allows for and<br />

promotes access into the Sarina township so that<br />

staff can and will use its services and associated<br />

community facilities.<br />

The proposal therefore is consistent with the DEOs in part 3 of the planning scheme.<br />

WOLTER CONSULTING GROUP Page 31


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

5.3.3 Area Classification<br />

The subject site is located within the Open Space Zone of the Sarina Planning Scheme. As the<br />

proposed development is categorised as an Undefined Use within the planning scheme, the proposal is<br />

identified as being impact assessable. The applicable codes are listed in Section 5.3.4 of this report.<br />

Location of Subject Site<br />

Figure 12: Extract from the Shire Zoning Map<br />

Source: Sarina Planning Scheme<br />

The proposed development is to be located within a site zoned as Open Space land for a number of<br />

reasons, detailed below:<br />

• The site was previously used for the development and operation of a temporary workers<br />

accommodation facility, constructed in support of the upgrade of the Jilalan Railway Yard<br />

which is of state significance and a critical component in the supply-chain for the coal industry.<br />

• The location of the site is intentionally in close proximity to support an existing overwhelming<br />

need for workforce accommodation to service local industry and mining operations in the<br />

Mackay, Isaac and Whitsunday Region.<br />

• The Open Space site is presently surplus land unused by its owner, the Sarina Golf Club. The<br />

area proposed for this development is mostly the area previously used by the abandoned<br />

temporary workers accommodation facility, and the adjacent area of cleared grassed land.<br />

Despite the Open Space zoning, no land subject of this development is used for public active<br />

or passive recreation. The development will not result in the loss of public open space land. It<br />

is currently private property and is fenced.<br />

WOLTER CONSULTING GROUP Page 32


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Given the development approval history of the site for a temporary accommodation facility, it is<br />

proposed that the site is suitable for a new Non-resident Workforce Accommodation facility, which will<br />

immediately provide a substantial increase in worker accommodation and housing diversity in the<br />

Sarina area, and contribute to further economic development across the Region.<br />

5.3.4 Codes<br />

A summary of the applicable Codes is provided in the table below:<br />

Sarina Planning Scheme<br />

Primary Codes • Open Space Zone Code<br />

Overlay Codes • Conservation Areas Overlay Code<br />

• Natural Hazards Management Areas Overlay<br />

Code<br />

• Remnant Vegetation Overlay Code<br />

The relevant Primary and Secondary Codes are addressed in the Code Compliance Statement outlined<br />

in Appendix C of this report.<br />

WOLTER CONSULTING GROUP Page 33


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

6 REFERRAL AGENCIES<br />

A key part of the Integrated Development Assessment System (IDAS) framework (refer to Subdivision 2<br />

of the SPA) is the identification of referral agencies and their jurisdictions with respect to assessment of<br />

development applications. These agencies and their jurisdictions are detailed in Schedule 7 of the<br />

Sustainable Planning Regulation 2009.<br />

The relevant referral triggers for the development identified in Schedule 7 have been reviewed and<br />

noted respectively in Tables B & C below. It is further noted that the IDAS Checklist and Forms 1 and 5<br />

have been executed and provided in support of the development application.<br />

Please refer to the completed IDAS Checklist submitted in support of the application:<br />

Table B – Referral Check for MCU<br />

Under Schedule 7 of Sustainable Planning Regulation 2009 (as in force 4 February 2011)<br />

Referral Trigger / Comments<br />

Table 1 - For building work assessable against the Building Act<br />

N / A<br />

Table 2 - Other development made assessable under schedule 3 (whether or not the development<br />

is also assessable under a planning scheme, temporary local planning instrument or preliminary<br />

approval to which section 242 of the Act applies)<br />

Environmentally Relevant<br />

Activities<br />

<br />

A separate application is to be lodged with DERM for a Sewage<br />

Treatment Facility (ERA 63). The Sewage Treatment Facility is<br />

to service the proposed accommodation facility.<br />

Clearing Vegetation The application will not involve the clearing of native vegetation.<br />

Strategic Port Land The subject site is not identified as strategic port land.<br />

Airport Land The subject site is not identified as airport land.<br />

Major Hazard Facilities The proposed Material Change of Use is not for a Major Hazard<br />

Facility.<br />

Taking or Interfering with<br />

Water<br />

Any works involving the water storage adjacent to the site will be<br />

subject to an Operational Works application following this DA.<br />

Particular Dams The proposed development does not involve the<br />

Removal of quarry material<br />

Tidal works, or development<br />

in a coastal management<br />

district<br />

Queensland Heritage Place<br />

Contaminated Land<br />

<br />

<br />

<br />

<br />

The proposed development does not involve the removal of<br />

quarry material from a watercourse or lake made assessable<br />

under schedule 3, part 1, table 4, item 5<br />

The site is not situated within a Coastal Management District,<br />

the proposal is not in connection with the construction of a canal,<br />

and the site is not within the limits of a port under the Transport<br />

Infrastructure Act 1994<br />

The subject site is not identified as a Queensland Heritage<br />

Place.<br />

The subject site is not identified on the Contaminated Land<br />

Register or Environmental Management Register.<br />

WOLTER CONSULTING GROUP Page 34


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Table B – Referral Check for MCU<br />

Under Schedule 7 of Sustainable Planning Regulation 2009 (as in force 4 February 2011)<br />

Referral Trigger / Comments<br />

Mobile and Temporary<br />

Relevant Activity<br />

Works or other<br />

Development in or Adjoining<br />

a Fish Habitat Area<br />

<br />

<br />

The application is not for a mobile and temporary<br />

environmentally relevant activity.<br />

The subject site is not located within or adjoining to a fish habitat<br />

area.<br />

Certain Aquaculture The proposal is not the purposes of aquaculture.<br />

Removal, destruction or<br />

damage of marine plants<br />

Development in interim<br />

koala habitat protection area<br />

Certain agricultural or animal<br />

husbandry activities in a wild<br />

river area<br />

Land in or near a<br />

conservation estate<br />

<br />

<br />

<br />

<br />

The proposed development does not involve the removal,<br />

destruction or damage of marine plants<br />

The subject site is not contained within the interim koala habitat<br />

protection area.<br />

The proposed development is not for agricultural or animal<br />

husbandry activities.<br />

The site is not located in or near a conservation estate<br />

Table 3 - Development made assessable under a planning scheme, temporary local planning<br />

instrument, preliminary approval to which section 242 of the Act applies or State planning<br />

regulatory provisions<br />

Land relating to a Statecontrolled<br />

road<br />

Development Impacting on<br />

a State-controlled Road<br />

Acid sulfate soils<br />

Declared catchment areas<br />

Coastal management<br />

districts (CMD)<br />

Land designated for<br />

community infrastructure<br />

Electricity infrastructure<br />

Clearing vegetation<br />

Contaminated land<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

The site is not located within 100m of a State-controlled road.<br />

The proposed residential development exceeds the prescribed<br />

threshold of 50 accommodation units (LGA population 2) under<br />

Schedule 11.<br />

Previous soil studies over the subject site concluded that the<br />

subject site is not anticipated to comprise Acid Sulfate Soils.<br />

The site is not identified as a declared catchment area under the<br />

Water Act 2000<br />

The site is not situated within a Coastal Management District.<br />

The subject lots are not identified as land designated for<br />

community infrastructure<br />

The proposed development is not located on a site that is<br />

subject to an electricity infrastructure easement or within 100m<br />

of a sub-station<br />

Whilst the parent lot is identified as contain remnant vegetation<br />

that is a least concern regional ecosystem under the Vegetation<br />

Management Act 1999, the subject site applicable to this<br />

development application is not identified as containing<br />

significant vegetation.<br />

The site is not a premises as defined, and is not within an area<br />

where an area management advice has been given for<br />

unexploded ordinance<br />

Regional plans TBC The site is located within the Regional Landscape and Rural<br />

WOLTER CONSULTING GROUP Page 35


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Table B – Referral Check for MCU<br />

Under Schedule 7 of Sustainable Planning Regulation 2009 (as in force 4 February 2011)<br />

Referral Trigger / Comments<br />

Production Area of the Mackay, Isaac, Whitsunday Regional Plan<br />

and therefore requires consideration of the MIW Regulatory<br />

Provisions.<br />

However, as outlined in a letter submitted to DLGP prior to<br />

lodging this application, the proposed Non-Resident Workforce<br />

Accommodation use is not defined as a Residential<br />

Development, or an Urban Activity according to Schedule 2 (s2.1<br />

and s2.2) of the Regional Plan. Therefore the development is not<br />

a material change of use to which division 2 of the State planning<br />

regulatory provisions for the Mackay, Isaac and Whitsunday<br />

Regional Plan applies.<br />

Public passenger transport<br />

Railways<br />

Oil and gas infrastructure<br />

Land in or near a wetland<br />

Land in or near a<br />

conservation estate<br />

Land adjacent to or<br />

including a Queensland<br />

heritage place<br />

Certain preliminary<br />

approvals<br />

Removal, destruction or<br />

damage of marine plants<br />

Development in Distributorretailer’s<br />

Geographic Area<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

The proposed residential development does not exceed the<br />

prescribed thresholds under schedule 12.<br />

While the proposed development is for residential purposes, the<br />

site area subject to this development application does not exceed<br />

5ha.<br />

The site is not subject to an easement for purposes of oil and gas<br />

infrastructure<br />

No part of the site is located within a Wetland Management Area<br />

or the GBR Wetland Protection Area.<br />

The site is not situated in, and is not located within 100m of<br />

conservation estate<br />

The site is not identified as, nor does it share a boundary with a<br />

Queensland Heritage Place<br />

The application does not seek a Preliminary Approval under<br />

section 242 of SPA<br />

The proposed Material Change of Use does not involve<br />

operational work that is the removal, destruction or damage of<br />

marine plants<br />

The subject site is not located in an area of a local government<br />

under the SEQ Water Act.<br />

From this review it has been concluded that the application requires referral under IDAS to the<br />

Department of Transport and Main Roads as detailed in Table C below.<br />

Table C – Referral Agencies<br />

Referral Agency<br />

Status<br />

(C / A)<br />

Referral Trigger<br />

Department of Transport<br />

and Main Roads<br />

C The proposed development exceeds the threshold of 50<br />

dwellings for land not contiguous to a State-controlled<br />

Road.<br />

Department of Local To be As outlined in a letter submitted to DLGP prior to lodging<br />

WOLTER CONSULTING GROUP Page 36


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

Table C – Referral Agencies<br />

Referral Agency<br />

Status<br />

(C / A)<br />

Referral Trigger<br />

Government and Planning confirmed this application, the proposed Non-Resident Workforce<br />

Accommodation use is not defined as a Residential<br />

Development, or an Urban Activity according to Schedule 2<br />

(s2.1 and s2.2) of the Regional Plan. Therefore the<br />

development is not a material change of use to which<br />

division 2 of the State planning regulatory provisions for<br />

the Mackay, Isaac and Whitsunday Regional Plan applies.<br />

WOLTER CONSULTING GROUP Page 37


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

7 KEY <strong>DEVELOPMENT</strong> ISSUES<br />

The key town planning issues associated with the proposal are:<br />

Key Issues<br />

Defined Use<br />

Our review of Schedule 1 of the Sarina Shire Planning Scheme 2005 (Planning Scheme) has identified<br />

that that the proposed workers accommodation facility does not fall within a defined use category.<br />

However, through negotiations with Council it has been clarified that the definition for Non-resident<br />

Workforce Accommodation, derived from the Queensland Planning Provisions is appropriate for the<br />

proposed facility. This application therefore seeks approval for the development as Non-resident<br />

Workforce Accommodation, however for the purposes of assessment against the planning scheme and<br />

other relevant policies and provisions, it is an Undefined Use.<br />

The proposed office falls within the Commercial Premises use definition in accordance with Schedule 1<br />

of the Planning Scheme.<br />

Non-resident Workforce Accommodation<br />

The proposed Non-resident Workforce Accommodation is intended to provide worker accommodation<br />

opportunities for a variety of mining, construction, and other resource-related industry companies from<br />

both the private and public sectors, who require accommodation for their staff operating in the Mackay,<br />

regional area. This development is responding to a recognised significant shortfall of housing<br />

accommodation suitable for short to medium-term workers in the region. This is despite the region being<br />

renowned for its strong resource industries and mining activities.<br />

This development has been purposefully conceived and progressed to address part of this shortfall by<br />

providing accommodation in an appropriate location on the outskirts of Sarina, where good connections<br />

to the surrounding industrial and mining activities exist on the State-controlled Road and local road<br />

networks (i.e. Bruce Highway, Marlborough-Sarina Road, Sarina-Homebush Road, Armstrong Beach<br />

Road) and connections to the Goonyella rail system. The facility will also be within 30 minutes driving<br />

time from the Mackay Airport, which presents the opportunity tor specialist Fly In-Fly Out workers to<br />

work and live temporarily at the facility while on-shift at Primary Industry projects in the surrounding area<br />

and region.<br />

The provision of a Non-resident Workforce Accommodation facility in Sarina will lessen the potential for<br />

impacts that the demand for workforce accommodation has on short-term Motel/Hotel accommodation,<br />

and rental accommodation affordability and availability in townships. By providing workforce-specific<br />

WOLTER CONSULTING GROUP Page 38


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

housing suited to short/medium-term or FI-FO workers, the demand for rental tenancies specifically for<br />

short-term workers will be minimised.<br />

A social impact assessment has been prepared in support of this development application and in<br />

response to issues such as housing affordable and social impacts, and is provided at appendix G.<br />

Office Facility<br />

The development also proposes an Office building, which is proposed to be used by Pacific National to<br />

accommodate its administrative and field staff in the Sarina region, related to their operations on the<br />

Goonyella railway and North Coast railway. This single Office building, and related car parking area, is<br />

to be constructed as part of the accommodation facility, utilising similar demountable buildings fixed in<br />

place as permanent structures in accordance with relevant building codes.<br />

The current Pacific National office and staff amenity premises, located in Broad Street, Sarina, operate<br />

24-hours, 7 days a week to accommodate the non-stop nature of their coal and freight rail operations.<br />

While this facility is within commercial premises, it is still restricted in terms of car parking available, and<br />

its proximity to nearby residential uses. By locating this new facility as part of a workforce<br />

accommodation development, Pacific National will be able to develop for itself a purpose-built office and<br />

amenities facility that has adequate car parking, and the required 24-hour access required of its<br />

operations, without being constrained by nearby existing sensitive uses.<br />

While it is recognised that the location of this office on open space-zoned land, outside of the Sarina<br />

commercial area in the town’s main street is inconsistent in terms of land use context, the nature of<br />

Pacific National operations and their need to be within close proximity to the Jilalan railway complex and<br />

main roads justifies this location and the development of this office use.<br />

Environmentally Relevant Activity (ERA) 63<br />

The development and operation of a worker’s accommodation facility will require an on-site sewage<br />

treatment facility. For the purposes of compliance and licensing, a sewage treatment facility is<br />

categorised under Section 2 of the Environmental Protection Regulation 2008 as being an ERA 63,<br />

which is identified as “operating 1 or more sewage treatment works at a site that have a total daily peak<br />

design capacity of at least 21EP”.<br />

In support of the Non-resident Workforce Accommodation, a separate development application for an<br />

ERA63 will be prepared and lodged with the Department of Environment and Resource Management<br />

(DERM). Many aspects of this development application and proposed accommodation facility are reliant<br />

on aspects of this ERA application. During its assessment of the application, Council is requested to<br />

WOLTER CONSULTING GROUP Page 39


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

assume that the wastewater treatment system proposed for the development will be located on site, and<br />

that the wastewater produced from this treatment may be utilised for irrigation of the golf course,<br />

depending on the level of treatment achieved and quality of wastewater.<br />

Council will be provided with details about and a copy of this separate application when it is submitted,<br />

as well as the approval and licensing of the ERA that should follow.<br />

Traffic, Transport, and Access<br />

The site was previously subject of a development application for a temporary workers accommodation<br />

facility, which was approved and constructed to house the workforce that undertook the related upgrade<br />

of the Jilalan Railway Yard complex. That facility housed in excess of 200 workers, and provided for a<br />

significant number of private vehicle car parks for staff while they were staying at the facility on-shift.<br />

During prelodgement discussions with both Mackay Regional Council and the Department of Transport<br />

and Main Roads, the potential traffic and transport impacts of the proposed facility were identified as<br />

being a key issue that this application and the operation of the facility would need to address and<br />

appropriately mitigate any impacts through operational measures such as using buses for staff transport<br />

to site, and restricting private vehicle parking offset with bus services from nearby towns and airports to<br />

collect employees as they arrive to stay for rostered periods.<br />

In support of this application TTM Traffic consultants have prepared a Traffic Engineering Report which<br />

identifies and addresses any foreseeable traffic and transport impacts from the operation of the facility,<br />

and makes recommendations regarding the management of vehicle moments from the site. In particular<br />

this report forecasts the future traffic impacts expected from the operation of the facility, against the<br />

forecast traffic and intersection traffic volumes obtained from recent surveys and vehicle counts in the<br />

area. The recommendations are consistent with the intended operation of the facility once completed.<br />

WOLTER CONSULTING GROUP Page 40


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

8 CONCLUSIONS AND RECOMMENDATIONS<br />

The application seeks a Development Permit for a Material Change of Use for an Undefined Use (Nonresidential<br />

Workforce Accommodation) and Commercial Premises (Office) on land located at Armstrong<br />

Beach Road, Sarina and also described as part of Lot 1 on RP726644.<br />

Through the assessment and consideration of the proposed development, the following key conclusions<br />

have been determined:<br />

• The site has been previously subject to an approved development application for a similar worker<br />

accommodation facility related to the recent expansion of the Jilalan Railway Yard.<br />

• While the accommodation and office facilities are proposed on a site zoned as Open Space in the<br />

relevant planning scheme, it is land identified a surplus by its owner, the Sarina Golf Club, and is<br />

not currently or proposed to be used for public active or passive recreation.;<br />

• Although traffic generation has been identified as being a key issue to be addressed by the<br />

development, the enclosed Traffic Engineering Report prepared by TTM Traffic has assessed the<br />

potential impacts expected from the facility and made recommendations to ensure that the<br />

operation of the facility is not detrimental to the immediate local road fronting the development, or<br />

the nearby State-controlled road (Bruce Highway).<br />

• The Sarina Shire Planning Scheme Strategic Framework requires that the “extensive ecological<br />

resources and landscape values of the Shire are protected and integral to the Shire’s character and<br />

tourist potential”. The proposed Non-resident Workforce Accommodation facility will not jeopardise<br />

the ecological resources or landscape values of the local area, given its location on a site which has<br />

been previously utilised for a similar use.<br />

• The Desired Environmental Outcomes (DEOs) contained in Part 3 of the Sarina Planning Scheme<br />

state that the Sarina Shire area is “a prosperous community with a sustainable industrial and rural<br />

base, with a wide range of employment opportunities due to the diversity of local industries,<br />

including the Port of Hay Point, the Plane Creek Sugar Mill and Distillery, Jilalan QR maintenance<br />

yards, the cane industry and new rural industries”. It also states that Sarina township performs a<br />

“strong role as the main service centre for the Shire”. The proposed Non-resident Workforce<br />

Accommodation will allow for a larger workforce to exist within the Sarina Township in support of<br />

major projects underway or proposed in the region. Accommodation for this workforce will allow<br />

existing and new industries to continue with certainty that workers can be accommodated. The<br />

WOLTER CONSULTING GROUP Page 41


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

facility’s close proximity to the township will contribute to making Sarina Shire and the township an<br />

even more prosperous community in the region, and continue its role as the main service centre in<br />

the Shire and this part of the Mackay region. Addressing the DEO’s is further supported by the<br />

social impact assessment report prepared by Warwick Powell (Director, Urban Advisory - SINO<br />

Australia Investment & Trade Group) and enclosed at Appendix G.<br />

• The Draft Mackay, Isaac, and Whitsunday Regional Plan defines the site within the Regional<br />

Landscape and Rural Production Area of the regional plan, and as such warrants consideration of<br />

the development against the Regulatory Provisions of the Regional Plan. A review of the regulatory<br />

provisions concluded that the proposed Non-Resident Workforce Accommodation use is not<br />

defined as a Residential Development, or an Urban Activity according to Schedule 2 (s2.1 and s2.2)<br />

of the Regional Plan. Therefore the development is not a material change of use to which division 2<br />

of the State planning regulatory provisions for the Mackay, Isaac and Whitsunday Regional Plan<br />

applies.<br />

Ultimately, it is recommended that the application be approved as proposed, subject to reasonable and<br />

relevant conditions.<br />

WOLTER CONSULTING GROUP Page 42


<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

APPENDICES<br />

A. Architectural Plans prepared by i4 Architecture<br />

B. Photographs of Site taken 21 st November 2011<br />

C. Code Compliance Statements prepared by Wolter Consulting Group Pty Ltd<br />

D. Traffic Engineering Report prepared by TTM Traffic consultants<br />

E. Landscape Concept Plan prepared by Hywel Jones Landscape Architects<br />

F. Detailed Site Survey plan prepared by WS Group<br />

G. Social Impact Assessment prepared by Warwick Powell (Director, Urban Advisory - SINO Australia<br />

Investment & Trade Group)<br />

H. Correspondence from BMA providing a pre-commitment to occupy part of the NRWA facility.<br />

WOLTER CONSULTING GROUP Page 43