01.11.2014 Views

DEVELOPMENT APPLICATION ASSESSMENT REPORT Proposed ...

DEVELOPMENT APPLICATION ASSESSMENT REPORT Proposed ...

DEVELOPMENT APPLICATION ASSESSMENT REPORT Proposed ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>DEVELOPMENT</strong> <strong>APPLICATION</strong> <strong>ASSESSMENT</strong> <strong>REPORT</strong><br />

ARMSTRONG BEACH ROAD, SARINA MARCH 2012<br />

4 SITE INFORMATION AND ANALYSIS<br />

4.1 PHYSICAL DESCRIPTION<br />

The site of this development application is formed by part of Lot 1 on RP726644 and has a total area of<br />

6ha. A detailed survey of this site is provided at Appendix F. Under the Sarina Planning Scheme, the<br />

site is located in the Open Space Zone and forms part of the Sarina Golf Club. However, the portion of<br />

Lot 1 which forms the subject site has been previously used for the purposes of a temporary<br />

Construction Accommodation Village. To assist in minimising the potential of any detrimental impacts to<br />

the site or surrounding area, the proposed Non-resident Workforce Accommodation facility will utilise the<br />

pre-established development footprint of the previously-approved use, with the footprint to extend further<br />

west over land that is clear of any significant vegetation. The subject site has a single frontage to<br />

Armstrong Beach Road, with vehicular access gained by an existing vehicular crossover which<br />

previously serviced the Temporary Construction Accommodation Village once on the site. Details of the<br />

proposed cross-over are provided in the enclosed Traffic Engineering Report at Appendix D.<br />

Recent photographs of the site of the proposed use are contained within Appendix B of this report.<br />

4.2 EXISTING USES<br />

The site is currently vacant; with the previous Temporary Workers Accommodation Village<br />

decommissioned and all buildings removed from the site subject of its approval (Council Ref: MCU-<br />

00053).<br />

4.3 CONTEXT<br />

The subject site is located approximately 3km south-east of the centre of the township of Sarina, and<br />

some 40km south of Mackay via the Bruce Highway. Its distance from Sarina limits the potential for any<br />

conflict with the existing low-density residential housing that dominates the township, while still ensuring<br />

that it is within close proximity to utilise its services. The proximity to Sarina can be seen in the aerial<br />

imagery and map provided in Figures 3 and 4 respectively.<br />

The subject site is formed by under-utilised land under ownership of the Sarina Golf Club, and located to<br />

the east of the extent of the golf course complex. The golf course immediately surrounds the site to the<br />

north and west, which can be seen in the aerial imagery in Figure 3. Pedestrian access to the course<br />

will be available via the existing footpath constructed to make the same connection for the previous<br />

temporary worker accommodation facility at the same site.<br />

WOLTER CONSULTING GROUP Page 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!