7. Issues and Challenges in Aquatic Invasive Alien Species - Seafdec
7. Issues and Challenges in Aquatic Invasive Alien Species - Seafdec
7. Issues and Challenges in Aquatic Invasive Alien Species - Seafdec
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Issue No. 2: Inadequate scientific research capacities to prevent, control, eradicate <strong>and</strong> mitigate<br />
aquatic IAS<br />
1. Intensify extension activities so that prevention,<br />
control, eradication <strong>and</strong> mitigation efforts on<br />
aquatic IAS technologies can be effectively<br />
dissem<strong>in</strong>ated <strong>and</strong> adopted<br />
• SOPs on prevention, control, eradication <strong>and</strong><br />
mitigation efforts on aquatic IAS technologies<br />
2. Strengthen <strong>in</strong>frastructure for research as well<br />
as research networks that <strong>in</strong>corporate risk<br />
assessment, risk management <strong>and</strong> research<br />
approaches on aquatic IAS<br />
• 1 laboratory / clear<strong>in</strong>g house<br />
Issue No. 3: Lack of collaborative studies among local, regional <strong>and</strong> <strong>in</strong>ternational <strong>in</strong>stitutions<br />
1. Collaborate with other relevant agencies,<br />
organizations, <strong>in</strong>itiatives <strong>and</strong> conventions (e.g.,<br />
FAO, WHO, IMO, CITES, OIE, ICAO <strong>and</strong> IPPC,<br />
etc.)<br />
• 1 laboratory / clear<strong>in</strong>g house<br />
Strategy 6:<br />
Establish F<strong>in</strong>ancial <strong>and</strong> Infrastructure Supports<br />
No. Key Actions KPI<br />
Issue No. 1: Insufficient f<strong>in</strong>ancial support to conduct studies related to aquatic IAS<br />
1. Monitor the efficacy of <strong>in</strong>terventions, <strong>in</strong>clud<strong>in</strong>g<br />
attempt<strong>in</strong>g to underst<strong>and</strong> the returns on<br />
<strong>in</strong>vestment<br />
• 1 scientific paper<br />
2. Allocate adequate f<strong>in</strong>ancial resources to build<br />
capacity <strong>in</strong> effective mitigation, border control<br />
<strong>and</strong> quarant<strong>in</strong>e measures, with a view to<br />
improve synergies with policies relat<strong>in</strong>g to<br />
trade, food security, human health <strong>and</strong><br />
environment protection, scientific research <strong>and</strong><br />
exchange of <strong>in</strong>formation<br />
• 1 collaborative paper on trade<br />
Issue No. 2: Lack of political will <strong>and</strong> support to manage aquatic IAS issues<br />
1. Monitor the efficacy of <strong>in</strong>terventions, <strong>in</strong>clud<strong>in</strong>g<br />
attempt<strong>in</strong>g to underst<strong>and</strong> the returns on<br />
<strong>in</strong>vestment<br />
2. Allocate adequate f<strong>in</strong>ancial resources to build<br />
capacity <strong>in</strong> effective mitigation, border control<br />
<strong>and</strong> quarant<strong>in</strong>e measures, with a view to<br />
improve synergies with policies relat<strong>in</strong>g to trade,<br />
food security, human health <strong>and</strong> environment<br />
protection, scientific research <strong>and</strong> exchange of<br />
<strong>in</strong>formation<br />
• 1 bus<strong>in</strong>ess proposal<br />
• 1 paper on budget requirement Fund<strong>in</strong>g<br />
from central agency<br />
Issue No. 3: Limited availability of adequate quarant<strong>in</strong>e <strong>and</strong> risk assessments facilities<br />
1. Enhance the upgrad<strong>in</strong>g of quarant<strong>in</strong>e<br />
facilities through provid<strong>in</strong>g of appropriate<br />
equipment <strong>and</strong> facilities<br />
• 1 paper on Recruitment<br />
2. Provision of advanced equipment/ tool kits at<br />
all quarant<strong>in</strong>e centres<br />
• 1 paper on provision requirement at all<br />
quarant<strong>in</strong>e centres<br />
25