PART 2 / Management Plan<br />

55<br />

How <strong>Council</strong><br />

worked towards<br />

this vision<br />

during <strong>2010</strong>-11<br />

Upgrade existing and deliver new<br />

community assets such as parks,<br />

open spaces, community centres,<br />

roundabouts and roads, that<br />

minimise long-term operational<br />

and maintenance costs and take<br />

into account <strong>the</strong> needs <strong>of</strong> our<br />

community<br />

Implement Road Safety Action Plan<br />

(Technical Services)<br />

<br />

Project complete.<br />

Six ‘Choose Right Buckle Right’ child<br />

restraint checking events were held with<br />

184 vehicles and 266 restraints inspected.<br />

25 per cent <strong>of</strong> all restraints checked were<br />

found to be unsafe.<br />

Four ‘Helping Learner Drivers Become<br />

Safer Drivers’ workshops held with<br />

71 participants (participants are <strong>the</strong><br />

supervising drivers)<br />

‘Slow Down’ program delivered with<br />

eight local streets targeted.<br />

Acquire land and commence <strong>the</strong> staged<br />

construction <strong>of</strong> Kurrajong Road between<br />

Kookaburra Road and Sarah Hollands<br />

Drive (Technical Services)<br />

Project continuing. Land<br />

acquisitions commenced, however delays<br />

occurred due to <strong>the</strong> need to resolve<br />

adjustments and clearance to major<br />

electrical transmission lines with Transgrid<br />

and Endeavour Energy, which impacted<br />

on determination <strong>of</strong> road alignment. Site<br />

works to commence in late <strong>2011</strong>.<br />

Acquire land and complete <strong>the</strong><br />

construction <strong>of</strong> <strong>the</strong> road works and<br />

culvert on Strzelecki Drive, Horningsea<br />

Park (Technical Services)<br />

Project continuing. Land<br />

acquired with works to be undertaken by<br />

adjoining developer as part <strong>of</strong> subdivision<br />

construction. Works by developer<br />

underway.<br />

Commence <strong>the</strong> construction <strong>of</strong> <strong>the</strong><br />

bridge over Cabramatta creek,<br />

Kurrajong Road (Technical Services)<br />

Project continuing. Design work<br />

underway with site works to start in<br />

<strong>2011</strong>-12 in conjunction with extension <strong>of</strong><br />

Kurrajong Rd between Kookaburra Road<br />

and Sarah Hollands Drive. Delayed due to<br />

need to finalise approvals and works on<br />

transmission line adjustments.<br />

Commence construction <strong>of</strong> <strong>the</strong><br />

extension <strong>of</strong> Ingham Drive to <strong>the</strong> Hume<br />

Highway (Technical Services)<br />

Project continuing. Approvals<br />

for road closure <strong>of</strong> Pine Road (to enable<br />

new road to be constructed) being sought<br />

and Voluntary Planning Agreement being<br />

finalised with developer. Delayed pending<br />

approval for road closure.<br />

Commence construction <strong>of</strong> <strong>the</strong> upgrade<br />

works <strong>of</strong> Bernera Road between<br />

Kurrajong Road and Camden Valley Way<br />

(Technical Services)<br />

Project continuing. Necessary<br />

investigation, design and construction<br />

planning is underway and site works<br />

to start in <strong>2011</strong>-12. Delays to planned<br />

commencement have been caused by<br />

several factors, including additional design<br />

and utility adjustment investigations.<br />

Construct <strong>the</strong> bridge over <strong>the</strong> drainage<br />

corridor, Pacific Palms Drive, Prestons<br />

(Technical Services)<br />

Project continuing. Project is<br />

developer constructed works.<br />

Commence construction <strong>of</strong> <strong>the</strong> drainage<br />

basin at Jardine Drive, Edmondson Park<br />

(Technical Services)<br />

Project continuing. Construction<br />

delayed due to need to carry out<br />

compulsory acquisition.<br />

Land acquisition process has<br />

commenced and progressing with an<br />

anticipated target date <strong>of</strong> December <strong>2011</strong>.<br />

Construction works to start January 2012.<br />

Approval sought and received from <strong>State</strong><br />

Government for extension to project time.<br />

Purchase additional properties affected<br />

by severe flood risk from Georges River<br />

at Moorebank (Civil Construction and<br />

Assets)<br />

Project delayed. Following<br />

valuation and negotiations with two<br />

property owners, <strong>Council</strong> has been<br />

unsuccessful in acquiring any properties<br />

due to competition from <strong>the</strong> private<br />

market. Negotiations are now underway<br />

to pursue acquisition <strong>of</strong> o<strong>the</strong>r properties.<br />

Carry out drainage rehabilitation and<br />

renewal <strong>of</strong> drainage systems (Civil<br />

Construction and Assets)<br />

Project complete. Over $2.3M has<br />

been spent on:<br />

- Extensive renewal and rehabilitation<br />

<strong>of</strong> over 4.5km piped stormwater<br />

drainage systems<br />

- Investigation and design <strong>of</strong> major<br />

flood mitigation projects to alleviate<br />

flooding within and around <strong>the</strong> city<br />

centre<br />

- Enhanced maintenance <strong>of</strong> piped<br />

drainage systems involving a<br />

structured inspection program, high<br />

pressure cleaning, removal <strong>of</strong> root<br />

intrusions and minor maintenance<br />

- Completion <strong>of</strong> piping <strong>of</strong> an existing<br />

drainage channel along Heathcote Rd<br />

adjoining Clinches Pond<br />

- Installation <strong>of</strong> telemetry flood<br />

warning systems at flood detention<br />

basins for improved monitoring,<br />

reporting and emergency response<br />

to potential flood alerts.<br />

Construct a new roundabout at<br />

intersection <strong>of</strong> Pine and Box Roads<br />

(Civil Construction and Assets)<br />

Project complete.<br />

Complete staged reconstruction <strong>of</strong><br />

Governor Macquarie Drive, Chipping<br />

Norton between Georges River and<br />

Munday Street (Civil Construction and<br />

Assets)<br />

<br />

Project complete.<br />

Construct a roundabout at Governor<br />

Macquarie Drive and Barry Road (Civil<br />

Construction and Assets)<br />

Project complete.<br />

Reconstruct and widen North <strong>Liverpool</strong><br />

Road, Green Valley between Whitford<br />

Road and St Johns Road, a joint<br />

venture with Fairfield <strong>City</strong> <strong>Council</strong> (Civil<br />

Construction and Assets)<br />

Project complete.<br />

<strong>Liverpool</strong> <strong>City</strong> <strong>Council</strong> ANNUAL REPORT