PART 2 / Management Plan<br />
55<br />
How <strong>Council</strong><br />
worked towards<br />
this vision<br />
during <strong>2010</strong>-11<br />
Upgrade existing and deliver new<br />
community assets such as parks,<br />
open spaces, community centres,<br />
roundabouts and roads, that<br />
minimise long-term operational<br />
and maintenance costs and take<br />
into account <strong>the</strong> needs <strong>of</strong> our<br />
community<br />
Implement Road Safety Action Plan<br />
(Technical Services)<br />
<br />
Project complete.<br />
Six ‘Choose Right Buckle Right’ child<br />
restraint checking events were held with<br />
184 vehicles and 266 restraints inspected.<br />
25 per cent <strong>of</strong> all restraints checked were<br />
found to be unsafe.<br />
Four ‘Helping Learner Drivers Become<br />
Safer Drivers’ workshops held with<br />
71 participants (participants are <strong>the</strong><br />
supervising drivers)<br />
‘Slow Down’ program delivered with<br />
eight local streets targeted.<br />
Acquire land and commence <strong>the</strong> staged<br />
construction <strong>of</strong> Kurrajong Road between<br />
Kookaburra Road and Sarah Hollands<br />
Drive (Technical Services)<br />
Project continuing. Land<br />
acquisitions commenced, however delays<br />
occurred due to <strong>the</strong> need to resolve<br />
adjustments and clearance to major<br />
electrical transmission lines with Transgrid<br />
and Endeavour Energy, which impacted<br />
on determination <strong>of</strong> road alignment. Site<br />
works to commence in late <strong>2011</strong>.<br />
Acquire land and complete <strong>the</strong><br />
construction <strong>of</strong> <strong>the</strong> road works and<br />
culvert on Strzelecki Drive, Horningsea<br />
Park (Technical Services)<br />
Project continuing. Land<br />
acquired with works to be undertaken by<br />
adjoining developer as part <strong>of</strong> subdivision<br />
construction. Works by developer<br />
underway.<br />
Commence <strong>the</strong> construction <strong>of</strong> <strong>the</strong><br />
bridge over Cabramatta creek,<br />
Kurrajong Road (Technical Services)<br />
Project continuing. Design work<br />
underway with site works to start in<br />
<strong>2011</strong>-12 in conjunction with extension <strong>of</strong><br />
Kurrajong Rd between Kookaburra Road<br />
and Sarah Hollands Drive. Delayed due to<br />
need to finalise approvals and works on<br />
transmission line adjustments.<br />
Commence construction <strong>of</strong> <strong>the</strong><br />
extension <strong>of</strong> Ingham Drive to <strong>the</strong> Hume<br />
Highway (Technical Services)<br />
Project continuing. Approvals<br />
for road closure <strong>of</strong> Pine Road (to enable<br />
new road to be constructed) being sought<br />
and Voluntary Planning Agreement being<br />
finalised with developer. Delayed pending<br />
approval for road closure.<br />
Commence construction <strong>of</strong> <strong>the</strong> upgrade<br />
works <strong>of</strong> Bernera Road between<br />
Kurrajong Road and Camden Valley Way<br />
(Technical Services)<br />
Project continuing. Necessary<br />
investigation, design and construction<br />
planning is underway and site works<br />
to start in <strong>2011</strong>-12. Delays to planned<br />
commencement have been caused by<br />
several factors, including additional design<br />
and utility adjustment investigations.<br />
Construct <strong>the</strong> bridge over <strong>the</strong> drainage<br />
corridor, Pacific Palms Drive, Prestons<br />
(Technical Services)<br />
Project continuing. Project is<br />
developer constructed works.<br />
Commence construction <strong>of</strong> <strong>the</strong> drainage<br />
basin at Jardine Drive, Edmondson Park<br />
(Technical Services)<br />
Project continuing. Construction<br />
delayed due to need to carry out<br />
compulsory acquisition.<br />
Land acquisition process has<br />
commenced and progressing with an<br />
anticipated target date <strong>of</strong> December <strong>2011</strong>.<br />
Construction works to start January 2012.<br />
Approval sought and received from <strong>State</strong><br />
Government for extension to project time.<br />
Purchase additional properties affected<br />
by severe flood risk from Georges River<br />
at Moorebank (Civil Construction and<br />
Assets)<br />
Project delayed. Following<br />
valuation and negotiations with two<br />
property owners, <strong>Council</strong> has been<br />
unsuccessful in acquiring any properties<br />
due to competition from <strong>the</strong> private<br />
market. Negotiations are now underway<br />
to pursue acquisition <strong>of</strong> o<strong>the</strong>r properties.<br />
Carry out drainage rehabilitation and<br />
renewal <strong>of</strong> drainage systems (Civil<br />
Construction and Assets)<br />
Project complete. Over $2.3M has<br />
been spent on:<br />
- Extensive renewal and rehabilitation<br />
<strong>of</strong> over 4.5km piped stormwater<br />
drainage systems<br />
- Investigation and design <strong>of</strong> major<br />
flood mitigation projects to alleviate<br />
flooding within and around <strong>the</strong> city<br />
centre<br />
- Enhanced maintenance <strong>of</strong> piped<br />
drainage systems involving a<br />
structured inspection program, high<br />
pressure cleaning, removal <strong>of</strong> root<br />
intrusions and minor maintenance<br />
- Completion <strong>of</strong> piping <strong>of</strong> an existing<br />
drainage channel along Heathcote Rd<br />
adjoining Clinches Pond<br />
- Installation <strong>of</strong> telemetry flood<br />
warning systems at flood detention<br />
basins for improved monitoring,<br />
reporting and emergency response<br />
to potential flood alerts.<br />
Construct a new roundabout at<br />
intersection <strong>of</strong> Pine and Box Roads<br />
(Civil Construction and Assets)<br />
Project complete.<br />
Complete staged reconstruction <strong>of</strong><br />
Governor Macquarie Drive, Chipping<br />
Norton between Georges River and<br />
Munday Street (Civil Construction and<br />
Assets)<br />
<br />
Project complete.<br />
Construct a roundabout at Governor<br />
Macquarie Drive and Barry Road (Civil<br />
Construction and Assets)<br />
Project complete.<br />
Reconstruct and widen North <strong>Liverpool</strong><br />
Road, Green Valley between Whitford<br />
Road and St Johns Road, a joint<br />
venture with Fairfield <strong>City</strong> <strong>Council</strong> (Civil<br />
Construction and Assets)<br />
Project complete.<br />
<strong>Liverpool</strong> <strong>City</strong> <strong>Council</strong> ANNUAL REPORT