08.11.2014 Views

noise prevention in factories - The Institution of Engineers, Malaysia ...

noise prevention in factories - The Institution of Engineers, Malaysia ...

noise prevention in factories - The Institution of Engineers, Malaysia ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>The</strong> <strong>Institution</strong> <strong>of</strong> Eng<strong>in</strong>eers, <strong>Malaysia</strong><br />

Leval 5, 5-A, Northam Venture<br />

37 Jalan Sultan Ahmad Shah, 10050 Penang<br />

Tel: 04-8182045 Fax: 04-2264490<br />

Email: iempenangbranch@gmail.com<br />

(Penang Branch)<br />

NOISE PREVENTION IN FACTORIES<br />

Date: 20 March 2012 (Tuesday)<br />

Time: 8.30am to 5.30pm<br />

Venue: IEM Penang Secretariat<br />

BEM Approved<br />

CPD Hours: 7<br />

Ref No: IEM12/PG/035/S<br />

SYNOPSIS<br />

Due to factual data that <strong>noise</strong> causes hear<strong>in</strong>g problem to factory workers, there are possibility that the <strong>noise</strong> source<br />

are radiated from the mach<strong>in</strong>es or equipment. With reference to Factory and Mach<strong>in</strong>ery Act, Noise Regulation, 1967,<br />

there are legal implication on a breach <strong>of</strong> the law is a serious matter.<br />

Noise problem <strong>in</strong> factory, is presented <strong>in</strong> this talk. <strong>The</strong> solutions derived from actual <strong>noise</strong> measurement (<strong>noise</strong><br />

mapp<strong>in</strong>g and audiometric test) to mitigate from an occurrence. Solutions are available <strong>in</strong> the <strong>in</strong>dustry. Prevent it by<br />

look<strong>in</strong>g <strong>in</strong>to it.<br />

TOPICS<br />

Noise will def<strong>in</strong>itely damage our ears if it is exposed to loud <strong>noise</strong>s. Due to low frequency <strong>noise</strong> <strong>in</strong> factory (500,<br />

1000, 1500, 2000 Hz) the pressure cause ears not able to hear properly at prolong duration. Based on factual<br />

f<strong>in</strong>d<strong>in</strong>gs, patterns are able to resolve matters. In this case it is a foldable pattern <strong>of</strong> similar trend. To prevent this is to<br />

look <strong>in</strong> it.<br />

Equations derived will resolve the matter. In order to prevent from occurr<strong>in</strong>g, monitor<strong>in</strong>g is required. This is required<br />

to avoid <strong>noise</strong> impairment.<br />

COURSE DETAILS<br />

► Pattern<br />

► Equation<br />

► Real Figures and Its Area<br />

► Noise Chart<br />

► Discussion on hav<strong>in</strong>g a <strong>noise</strong> predictor. Prevention below the limit.<br />

BIODATA OF SPEAKER<br />

Ir. Gan Chun Chet is an Honors Student <strong>in</strong> Mechanical Eng<strong>in</strong>eer<strong>in</strong>g graduate from the University <strong>of</strong> Manchester,<br />

Manchester, United K<strong>in</strong>gdom <strong>in</strong> 1996. He has a Master <strong>of</strong> Science <strong>in</strong> Operations Management awarded by<br />

University <strong>of</strong> Manchester Institute <strong>of</strong> Science and Technology (UMIST), United K<strong>in</strong>gdom graduated <strong>in</strong> the<br />

subsequent year. He started his career with the General Industry, and later moved to the Oil and Gas Industry where<br />

he presently has 10 years <strong>in</strong> total <strong>of</strong> work<strong>in</strong>g experience.<br />

He has worked <strong>in</strong> General Production Facilities as well as Eng<strong>in</strong>eer<strong>in</strong>g Design <strong>in</strong> the Oil and Gas Industry. In the<br />

general <strong>in</strong>dustry, he worked together with a group <strong>of</strong> eng<strong>in</strong>eer<strong>in</strong>g team to resolve real plant issues encountered.<br />

Some <strong>of</strong> which are <strong>noise</strong> problems, compressor and pumps vibration problems, etc. Solutions to these problems are<br />

available <strong>in</strong> the <strong>in</strong>dustry. Monitor<strong>in</strong>g progress and actions are vital to success <strong>of</strong> the situation. Prevention concepts<br />

need to be heard <strong>in</strong> the <strong>in</strong>dustry.<br />

In the oil and gas <strong>in</strong>dustry, he managed to work with a lot <strong>of</strong> experienced eng<strong>in</strong>eers <strong>in</strong> the field where the thoughts <strong>of</strong><br />

predict<strong>in</strong>g failures arises to avoid failures. Industrial solutions are available to mitigate failures. Practices such as<br />

redundancy, field vot<strong>in</strong>g, review check activities, are currently practiced to overcome.<br />

He is currently practic<strong>in</strong>g as an Instrument Eng<strong>in</strong>eer serv<strong>in</strong>g the Oil and Gas Industry.<br />

IEM Penang Branch is the adm<strong>in</strong>istrator <strong>of</strong> the above activity


PROGRAMME<br />

8:30 Noise Source and Cause. <strong>The</strong> pattern. 12:00 Lunch<br />

9:45 Tea / C<strong>of</strong>fee Break 01:00 Increment and the activity<br />

10:15 <strong>The</strong> possible trend 02:00 <strong>The</strong> gradient <strong>of</strong> the slope<br />

- Increment 03:00 Step Approach – Plan ahead (data collection)<br />

- Reduction 04:00 Tea/C<strong>of</strong>fee Break<br />

- Limit 04:30 <strong>The</strong> allowable Distance<br />

11:00 <strong>The</strong> equation and the activity 05:30 Question and Answer<br />

R E G I S T R A T I O N F O R M<br />

NOISE PREVENTION IN FACTORIES - 20 MARCH 2012<br />

Regstration Fees<br />

IEM G&S Member - RM 350.00<br />

IEM Member - RM 400.00<br />

Non-member - RM 550.00<br />

Registration: on a ‘first come first served’ basis as seats are limited<br />

Clos<strong>in</strong>g Date: Tuesday 13 March 2012<br />

Payment Mode (please tick where applicable)<br />

onl<strong>in</strong>e/bank-<strong>in</strong> to: AMBANK Acct#: 002-201-101022-6 (please e-mail/fax receipt to us with attendee’s name on it)<br />

crossed cheque <strong>in</strong> favour <strong>of</strong>: <strong>The</strong> <strong>Institution</strong> <strong>of</strong> Eng<strong>in</strong>eers, <strong>Malaysia</strong><br />

cash to: IEM Penang Secretariat<br />

Clos<strong>in</strong>g Date: payment should reach us latest by Tuesday 13 March 2012<br />

We wish to register the follow<strong>in</strong>g person(s) for this course.<br />

I/We understand that the fee is not refundable if I/we withdraw after my/our registration is accepted but substitution <strong>of</strong><br />

participants will be allowed. If I/we fail to attend the course, the fee paid will not be refunded.<br />

No Name(s) <strong>in</strong> CAPITALS Handphone IEM No P E No Fees (Rm)<br />

1<br />

2<br />

3<br />

Name <strong>of</strong> Organisation: ………………………………………………………………………………………………………<br />

Address: ………………………………………………………………………………………………………………………<br />

Tel: (o) ………………………….......... Fax: ……………………<br />

Email: …………………………………………..<br />

Contact Person: ……………………………………………………… Designation: …………………………………….<br />

Signature: ……………………………………………......................<br />

Date: ……………………………………………..<br />

IEM Penang Branch is the adm<strong>in</strong>istrator <strong>of</strong> the above activity

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!