08.11.2014 Views

BAMBI BUCKET SERVICE MANUAL - SEI Industries Ltd.

BAMBI BUCKET SERVICE MANUAL - SEI Industries Ltd.

BAMBI BUCKET SERVICE MANUAL - SEI Industries Ltd.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 7: Control Head Maintenance<br />

Tripline Replacement<br />

9. While holding the reel securely, release the temporary lock.<br />

Allow the cable to wind in gradually. Do not let the reel<br />

free-wheel. Use gloves to protect your hands from injury.<br />

10. Place the bolt or pin to hold the catch in its open position,<br />

then pull the tripline out 3-4 ft. and return it to the retract<br />

position. Repeat four to five times, then remove the bolt and<br />

replace the cover.<br />

Bolt holding catch open.<br />

We Engineer Solutions<br />

Bambi Bucket Service Manual – Models 5566-HL9800 (Version D) 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!