t. Fire detection by flame detectors, UV detectors and CO 2 fire<br />

protection system.<br />

u. On base piping.<br />

V. Load coupling.<br />

w Compartment lighting<br />

x. Compressor washing system (Off & On line)<br />

2. Generator Package<br />

a Outdoor enclosure.<br />

b. Stator winding with class F insulation.<br />

c. Cylindrical <strong>for</strong>ged steel rotor with class F insulation.<br />

d. Air-cooled system.<br />

e. Lubrication system integral with gas turbine lubrication system.<br />

f. Platinum RTD temperature detectors imbedded in the stator<br />

windings.<br />

g. Structural steel base.<br />

h. Speed reduction gear. (if required)<br />

i. Excitation system<br />

j. Generator space heater (s)<br />

3. Generator switchgear<br />

a. Outdoor enclosure.<br />

b. SF 6 Generator circuit breaker <strong>for</strong> one GTG & STG<br />

b. Potential trans<strong>for</strong>mers.<br />

c. Current trans<strong>for</strong>mers.<br />

d. Lightning arresters.<br />

e. Neutral grounding trans<strong>for</strong>mers,<br />

f. Connections to generator power leads and unit step up<br />

trans<strong>for</strong>mers by phase segregated copper bus duct.<br />

g. Lighting and heating equipment.<br />

h. Ventilation system.<br />

i. Connections to auxiliaries trans<strong>for</strong>mer.<br />

j. 15.75 kV Generator breaker having adequate capacity to meet the<br />

requirements (as per single line diagram)<br />

4. Inlet Air System.<br />

a. Filter compartment with:<br />

• Support structure.<br />

• Multi-stage (3 stage) filtration system, complete in all respects.<br />

• High efficiency media filtration.<br />

• Pressure measuring instrumentation.<br />

• Inlet ducting.<br />

• Access door.<br />

• Lighting.<br />

• Air inlet system special corrosion protection.<br />

• Air inlet system bypass door.<br />

b. Inlet silencing.<br />

c. Transition piece from inlet duct to inlet plenum.<br />

d. Structural support.<br />

5. Exhaust System (Vertical)<br />

a. Exhaust ducting.<br />

b. Exhaust silencing.<br />

<strong>Ghorasal</strong> <strong>300</strong>-<strong>450</strong> <strong>MW</strong> CCPP Project (Vol-2A <strong>of</strong> 2) 10