4.0 Gas Turbine and Ancillary Equipment<br />

4.1 General<br />

The arrangement <strong>of</strong> the plant equipment shall be generally as described<br />

below:<br />

Gas Turbine Power Plant(s) with a continuous total net generating capacity<br />

approx. 66% <strong>of</strong> combined cycle output shall be accommodated in the<br />

location proposed.<br />

4.2 Guarantee<br />

The net output and heat rate <strong>of</strong> the Unit shall be guaranteed by the<br />

contractor at the following conditions:<br />

a. Ambient temperature : 95 0 F (35 0 C)<br />

b. Site elevation : less than 100 ft(msl)<br />

c. Relative humidity : 98%<br />

d. Barometric pressure : 1.013 bar<br />

e. Generation voltage : 15750 V<br />

f. Power factor : 0.8 lagging<br />

g. Frequency : 50 Hz<br />

The contractor shall guarantee the starting reliability <strong>of</strong> the Unit(s)including<br />

all ancillary equipment. The guaranteed reliability shall be stated in the<br />

<strong>Tender</strong> <strong>for</strong>m together with the number <strong>of</strong> consecutive starts to which the<br />

Unit will be subjected to demonstrate this reliability. (This is <strong>for</strong> a starting<br />

reliability <strong>of</strong> 95 %, the Unit shall be subjected to 20 consecutive starts <strong>of</strong><br />

which 19 shall be successful) the maximum speed rise after full load<br />

rejection is to be guaranteed (see <strong>Tender</strong>)<br />

4.3 Gas Turbine and Ancillary Equipment<br />

4.3.1. Basic Equipment Requirements<br />

The gas turbine (Simple Cycle) generating unit shall be <strong>of</strong> well proven<br />

design and the <strong>of</strong>fered model <strong>of</strong> gas turbine generating unit (<strong>of</strong>fered model<br />

shall be within the evolution <strong>of</strong> frame) shall and have satisfactory operating<br />

experience outside manufacturer's country <strong>for</strong> at least 2 (two) years.<br />

<strong>Tender</strong>er shall have to submit separate certificate in this respect, otherwise<br />

<strong>Tender</strong> shall be rejected.<br />

The extent <strong>of</strong> supply shall include, but not be limited to, the equipment<br />

described herein. All equipment comprising the gas turbine package shall<br />

be pre-assembled in the factory.<br />

4.3.2 Gas Turbine and Auxiliaries<br />

The gas turbine generating unit shall be <strong>of</strong> the simple cycle heavy-duty<br />

industrial packaged type suitable <strong>for</strong> outdoor installation and operation<br />

under the site conditions as specified in Art. 4.2 & Schedule B <strong>of</strong> Volume 2<br />

<strong>of</strong> 2 Part B.<br />

<strong>Ghorasal</strong> <strong>300</strong>-<strong>450</strong> <strong>MW</strong> CCPP Project (Vol-2A <strong>of</strong> 2) 44