12.11.2014 Views

invited by SIIDCUL on behalf of Managing Director ... - Sidcul

invited by SIIDCUL on behalf of Managing Director ... - Sidcul

invited by SIIDCUL on behalf of Managing Director ... - Sidcul

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MISCELLANEOUS IMPORTANT FACTORS:<br />

<br />

<br />

<br />

<br />

List <strong>of</strong> important teleph<strong>on</strong>e numbers to be kept with Ropeway incharge<br />

and also to be displayed in general notice board.<br />

All guidelines to be kept safely and displayed in technical<br />

informati<strong>on</strong> board.<br />

All rescue equipment to be kept safely and their locati<strong>on</strong>s to be<br />

displayed in notice board.<br />

Work instructi<strong>on</strong>s to be displayed in notice board at both stati<strong>on</strong>s.<br />

SAFETY PRACTICES AND MEASURES UNDERTAKEN<br />

For safe and smooth functi<strong>on</strong>ing <strong>of</strong> ropeway, various safety measures such<br />

as-Planned & scheduled, maintenance, test & inspecti<strong>on</strong>s <str<strong>on</strong>g>by</str<strong>on</strong>g> internal and<br />

external teams, ISO & Technical Audits, Rescue Drills and schedule training<br />

<strong>of</strong> employees.<br />

The maintenance <strong>of</strong> plants is carried out as per various planned<br />

maintenance schedules:-<br />

DAILY: Thorough checking <strong>of</strong> Ropeway operati<strong>on</strong> before opening for<br />

customers.<br />

WEEKLY: Checking <strong>of</strong> wire-rope ,cabins ,various adjustments.<br />

FORYNIGHTLY: Engine inspecti<strong>on</strong> ,Bearings checking, Parameters<br />

m<strong>on</strong>itoring.<br />

QUARTELY: Greasing <strong>of</strong> Sheaves, Bearing and Carriages.<br />

HALF-YEARLY: Planned shutdown ,corrective acti<strong>on</strong>s <strong>on</strong> various<br />

observati<strong>on</strong>s.<br />

ANNUALY: Planned shutdown ,Overhauling <strong>of</strong> different assemblies,<br />

corrective acti<strong>on</strong>s <strong>of</strong> various observati<strong>on</strong>s.<br />

TESTS AND INSPECTIONS:<br />

NON DESTRUCTIVE TEST- Ultras<strong>on</strong>ic and magnetic testing <strong>of</strong> all critical<br />

parts.<br />

RADIOGRAPY TETS- Radiography <strong>of</strong> Haulage Rope.<br />

WEAR DEBRIS ANALYSIS(WDA)-Lubricant analysis for bearing and<br />

machines.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!