invited by SIIDCUL on behalf of Managing Director ... - Sidcul
invited by SIIDCUL on behalf of Managing Director ... - Sidcul
invited by SIIDCUL on behalf of Managing Director ... - Sidcul
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Expressed as percent <strong>of</strong> total value <strong>of</strong> work<br />
………………………%<br />
Comp<strong>on</strong>ent <strong>of</strong> civil (except cement & steel) Xm -<br />
/Electrical c<strong>on</strong>structi<strong>on</strong> Materials expressed as percent <strong>of</strong> total value<br />
<strong>of</strong> work -<br />
………………………%<br />
Comp<strong>on</strong>ent <strong>of</strong> Labour- Y -<br />
Expressed as percent <strong>of</strong> total value <strong>of</strong> work<br />
………………………%<br />
Comp<strong>on</strong>ent <strong>of</strong> P.O.L.- Xs -<br />
Expressed as percent <strong>of</strong> total value <strong>of</strong> work<br />
………………………%<br />
SCHEDULE ‘F’<br />
Reference to Terms and c<strong>on</strong>diti<strong>on</strong>.<br />
Name <strong>of</strong> work :-<br />
Annual Operati<strong>on</strong> & Maintenance <strong>of</strong> Tipri-Madan Negi Ropeway Old<br />
Tehri Town, Uttarakhand..<br />
Estimated cost <strong>of</strong> work : Rs. 3.0 Lakhs per m<strong>on</strong>th<br />
(i) Earnest M<strong>on</strong>ey : Rs. 90000/-<br />
(ii) Performance Guarantee: The c<strong>on</strong>tractor shall be required to deposit an amount equal to<br />
5% <strong>of</strong> the tendered value <strong>of</strong> the work as performance<br />
guarantee in the form <strong>of</strong> an irrevocable bank guarantee b<strong>on</strong>d <strong>of</strong><br />
any scheduled bank or State Bank <strong>of</strong> India in accordance with<br />
the form prescribed or fixed deposit receipt etc., as in the case<br />
<strong>of</strong> recovery <strong>of</strong> security deposit within period specified in<br />
schedule F from the date <strong>of</strong> issue <strong>of</strong> letter <strong>of</strong> acceptance but<br />
before award <strong>of</strong> work. This period can be further extended <str<strong>on</strong>g>by</str<strong>on</strong>g><br />
the Engineer-in-Charge up to a maximum period as specified in<br />
schedule F <strong>on</strong> written request <strong>of</strong> the c<strong>on</strong>tractor.<br />
(iii) Security Deposit :<br />
A sum @ 10% <strong>of</strong> the gross amount <strong>of</strong> the bill shall be deducted<br />
from each running bill <strong>of</strong> the c<strong>on</strong>tractor till the sum al<strong>on</strong>g with<br />
sum already deposited as earnest m<strong>on</strong>ey will amount to<br />
security deposit <strong>of</strong> 5% <strong>of</strong> the tendered value <strong>of</strong> the work (Bank<br />
guarantee is not to be accepted as security deposit).<br />
GENERAL RULES : Officer inviting tender MD <str<strong>on</strong>g>SIIDCUL</str<strong>on</strong>g>.<br />
& DIRECTIONS<br />
Maximum percentage for quantity <strong>of</strong> items <strong>of</strong> work to be executed<br />
bey<strong>on</strong>d which rates are to be determined in accordance with Clauses<br />
12.2 & 12.3 see below :