16.11.2014 Views

View as PDF - Rail Professional

View as PDF - Rail Professional

View as PDF - Rail Professional

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Wherever the site, call up HoldF<strong>as</strong>t.<br />

Complex for Some, E<strong>as</strong>y for HoldF<strong>as</strong>t<br />

on time and on budget<br />

Stagecoach Supertram Nunnery Depot<br />

April 2012<br />

The Challenge<br />

Existing timber crossings patched with<br />

concrete, tarmac and metal plating in places.<br />

S&C track and few straight lines.<br />

The Solution<br />

Existing materials replaced with new<br />

HoldF<strong>as</strong>t rubber panels, individually cut to<br />

fit, to take into account check rails, points;,<br />

fishplates; track circuit bonds; and ongoing<br />

track maintenance access requirements.<br />

Contractor<br />

Level Crossings Installations (LCI)<br />

www.levelcrossinginstallations.co.uk<br />

Visit our gallery at<br />

www.HoldF<strong>as</strong>tSolutions.co.uk<br />

Ple<strong>as</strong>e contact Mark Coates Smith Mobile: +447970 656143 Fax: +441285 720748 Email: mark@holdf<strong>as</strong>tsolutions.co.uk<br />

PagE 40 SEPTEMBER 2012<br />

Rosehill Polymers Ltd manufacture the HoldF<strong>as</strong>t system on behalf of HoldF<strong>as</strong>t Level Crossings Ltd

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!