17.11.2014 Views

Report: Chisholm wildfire entrapment investigation - FPInnovations ...

Report: Chisholm wildfire entrapment investigation - FPInnovations ...

Report: Chisholm wildfire entrapment investigation - FPInnovations ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PLANNED STRATEGY AND TACTICS<br />

EFAS1<br />

FP210 p3<br />

14. Tactics<br />

Rear Right Flank Head Left Flank Briefly Explain Tactics<br />

Full Control Action<br />

X<br />

Full suppression possible to support air tanker guard burned out by aerial<br />

ignition team afternoon of 24may01 on east perimeter.<br />

Specific Action To<br />

Protect High Values<br />

X<br />

X<br />

Secure houses with dozer guard supported by water trucks. Property to E<br />

& S sides. Town of <strong>Chisholm</strong> is 3 miles N of N perimeter. Fire presently<br />

burning to the south.<br />

Limited Flanking<br />

Action<br />

X<br />

Athabasca River to the west may act as natural break. Support resources<br />

may be safer on this flank for the immediate future.<br />

Steering or Holding<br />

Action<br />

X<br />

East flank action with aerial ignition. Support resources may action if fire<br />

behavior lessens.<br />

No Direct Action At<br />

This Time<br />

Fire behavior determines where no direct action will occur due to<br />

ineffectiveness or safety concerns.<br />

15. Air tankers required for support action?<br />

ATTACH MAP OR DIGITAL PHOTO<br />

Yes<br />

No<br />

X<br />

Type<br />

Ground based AT<br />

working best due<br />

to long skimmer<br />

turnaround times.<br />

Date and<br />

Time<br />

All day 24may01 and<br />

as often as available<br />

25may at least.<br />

16. RESOURCES<br />

Overhead WFU Units Light R/W Int R/W Med R/W<br />

Heavy<br />

Equipment<br />

Pumps Hose Camp Other<br />

1. Currently<br />

deployed on fire<br />

8 2 2 1 2 9 3 9000 1<br />

2. Ordered or<br />

enroute<br />

8 20 2 1 1 21 7 9000<br />

3. Required in<br />

addition to 1+2<br />

8 5 1 1 1 3 5 30000 3<br />

4. TOTAL<br />

RESOURCES<br />

(1+2+3)<br />

24 27 5 3 4 33 15 48000 4 0<br />

17. Total resources (#4 above) will place fire BH by the following date:<br />

Page 27 of 61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!