Form P1(rev 12/98)<br />
DAILY FIRE SUPPRESSION PLAN<br />
FIRE NUMBER: LWF-063-01 DATE: 01/05/27<br />
Fire Size: 14 801 ha Temperature: 27 0 C Relative Humidity: 25 %<br />
State of Control:<br />
O/C 65% containment<br />
(river and dozerguard)<br />
Winds:<br />
E-SE<br />
20 G 60<br />
Precipitation: 0 %<br />
Outlook:<br />
Cold Front Passage Monday afternoon. Winds shifting to W-NW Monday afternoon.<br />
Priorities for the day:<br />
1. Secure all values at risk in hamlet of <strong>Chisholm</strong>.<br />
2. Secure and hold line established around excursion on west side of Athabasca river.<br />
3. Secure SW corner and re-inforce dozerguard in the Pembina river corner. Establish manpower<br />
presence in this corner.<br />
4. Reinforce dozerguard built on east side, widen, straighten and burnout fuels between guard and fire<br />
edge.<br />
Safety awareness is critical in light of extreme fire behaviour conditions.<br />
Lookouts<br />
Anchor Points<br />
Communications<br />
Escape Routes<br />
Safety Zones<br />
“LACES” adherence is Mandatory with current fire behaviour indices.<br />
Crewbosses WILL verify “LACES” compliance at all times with crews.<br />
Objectives by Priority:<br />
Secure hamlet of <strong>Chisholm</strong> from further fire threat.<br />
Contain west side of Athabasca river excursion inside existing guard.<br />
Establish control of south west corner near pembina river.<br />
Hold line established along east side of fire.<br />
Minimize timber losses in Vanderwell FMA<br />
Work Instructions:<br />
COORDINATE ALL EFFORTS IN VIEW OF EXTREME FIRE HAZARD LEVELS AND ANTICIPATED WEATHER CONDITIONS<br />
• ALL UNITS ON LINE STARTING 05:30<br />
• CONCENTRATE ON STRENGTHENING ESTABLISHED LINE ON ALL SECTORS.<br />
• BURNOUT LINE TO FIRES EDGE WITH HAND OR AERIAL IGNITION AS MUCH AS POSSIBLE.<br />
• BUCKETING, A/T SUPPORT AND AI SUPPORT AVAILABLE ON REQUEST.<br />
Storm King Mountain<br />
Monument<br />
PLANS CHIEF.<br />
Page 35 of 61