17.11.2014 Views

Report: Chisholm wildfire entrapment investigation - FPInnovations ...

Report: Chisholm wildfire entrapment investigation - FPInnovations ...

Report: Chisholm wildfire entrapment investigation - FPInnovations ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Form P1(rev 12/98)<br />

DAILY FIRE SUPPRESSION PLAN<br />

FIRE NUMBER: LWF-063-01 DATE: 01/05/27<br />

Fire Size: 14 801 ha Temperature: 27 0 C Relative Humidity: 25 %<br />

State of Control:<br />

O/C 65% containment<br />

(river and dozerguard)<br />

Winds:<br />

E-SE<br />

20 G 60<br />

Precipitation: 0 %<br />

Outlook:<br />

Cold Front Passage Monday afternoon. Winds shifting to W-NW Monday afternoon.<br />

Priorities for the day:<br />

1. Secure all values at risk in hamlet of <strong>Chisholm</strong>.<br />

2. Secure and hold line established around excursion on west side of Athabasca river.<br />

3. Secure SW corner and re-inforce dozerguard in the Pembina river corner. Establish manpower<br />

presence in this corner.<br />

4. Reinforce dozerguard built on east side, widen, straighten and burnout fuels between guard and fire<br />

edge.<br />

Safety awareness is critical in light of extreme fire behaviour conditions.<br />

Lookouts<br />

Anchor Points<br />

Communications<br />

Escape Routes<br />

Safety Zones<br />

“LACES” adherence is Mandatory with current fire behaviour indices.<br />

Crewbosses WILL verify “LACES” compliance at all times with crews.<br />

Objectives by Priority:<br />

Secure hamlet of <strong>Chisholm</strong> from further fire threat.<br />

Contain west side of Athabasca river excursion inside existing guard.<br />

Establish control of south west corner near pembina river.<br />

Hold line established along east side of fire.<br />

Minimize timber losses in Vanderwell FMA<br />

Work Instructions:<br />

COORDINATE ALL EFFORTS IN VIEW OF EXTREME FIRE HAZARD LEVELS AND ANTICIPATED WEATHER CONDITIONS<br />

• ALL UNITS ON LINE STARTING 05:30<br />

• CONCENTRATE ON STRENGTHENING ESTABLISHED LINE ON ALL SECTORS.<br />

• BURNOUT LINE TO FIRES EDGE WITH HAND OR AERIAL IGNITION AS MUCH AS POSSIBLE.<br />

• BUCKETING, A/T SUPPORT AND AI SUPPORT AVAILABLE ON REQUEST.<br />

Storm King Mountain<br />

Monument<br />

PLANS CHIEF.<br />

Page 35 of 61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!