"Consolidated Edison Co Indian Point 2 Nuclear Plant ... - NRC
"Consolidated Edison Co Indian Point 2 Nuclear Plant ... - NRC
"Consolidated Edison Co Indian Point 2 Nuclear Plant ... - NRC
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SECTION 14<br />
ACCEPTANCE TEST PROCEDURES (cont)<br />
14.1.3.41 AWS<br />
14.1.3.42 DRM<br />
14.1.3.43 NIS<br />
14.1.3.44 PCs<br />
14.1.3.45 PPL<br />
14.1.3.46 RMS<br />
14.1.3.47 PSW<br />
14.1.3.48 SSS<br />
14.1.3.49 SMM<br />
14.1.3.50 EPS<br />
14.1.3.51 Intentionally Omitted<br />
14.1.3.52 TSI<br />
14.1.4 Perodic Handler Tests<br />
14.1.4.1 Pump (PUMPHAND)<br />
14.1.4.2 Single-Phase Heat Exchanger (HTX)<br />
14.1.4.3 Motor (MOTHAND)<br />
14.1.4.4 Valve (VLVHAND)<br />
14.1.4.5 Safety and Relief Valve (SRV)<br />
14.1.4.6 Major Check Valve (CHK)<br />
14.1.4.7 <strong>Co</strong>ntrol Valve (CVH)<br />
14.1.4.8 Instrumentation Channel (ICH)<br />
14.1.4.9 Bistable (BST)<br />
14.1.4.10 Visual Annunciator (ALMHAND)<br />
14.1.4.11 Status Light (STATHAND)<br />
14.1.4.12 <strong>Co</strong>ntroller (CNH)<br />
14.1.4.13 <strong>Plant</strong> Protection Relay (RLYFNC)<br />
14.1.4.14 ime Delay (DELAY)<br />
14.1.4.15 Degraded Power Function (PWRFNC)<br />
14.1.4.16 Current and Potential Transformer Output Function (CTPTFNC)<br />
14.1.5 Interlock Handler Tests<br />
14.1.5.1 INTKL<br />
14.1.5.2 INTKLB<br />
14.1.6 Breakerxx <strong>Co</strong>mponent Handler Tests<br />
14.1.6.1 BKR01<br />
14.1.6.2 BKR02<br />
14.1.6.3 BKRO3<br />
14.1.6.4 BKR04<br />
14.1.6.5 BKR05<br />
14.1.6.6 BKR06<br />
CON MASTER INDEX Rev 3(wvb) Page 49 of 61<br />
01991 Westinghouse Electic <strong>Co</strong>rp.