SECTION 14<br />

ACCEPTANCE TEST PROCEDURES (cont)<br />

14.3 Westinghouse FAT Tests<br />

Note:<br />

14.3.1 Simulator <strong>Co</strong>ntrol Systems Tests<br />

14.3.1.1 Instructor System Test<br />

14.3.1.2 Remote Simulator <strong>Co</strong>ntrol Test<br />

14.3.1.3 Hardware Diagnostics Test<br />

14.3.1.4 Instructor Station Display Response Test<br />

14.3.2 Individual System Tests<br />

14.3.2.1 Excore <strong>Nuclear</strong> Instrumentation System (NIS)<br />

14.3.2.2 <strong>Plant</strong> <strong>Co</strong>ntrol System (PCS)<br />

14.3.2.2.1 Steam Dump <strong>Co</strong>ntrol Test<br />

14.3.2.2.2 Reactor <strong>Co</strong>ntrol Test<br />

14.3.2.2.3 Feedwater <strong>Co</strong>ntrol Test<br />

14.3.2.2.4 Pressurizer Pressure <strong>Co</strong>ntrol Test<br />

14.3.2.2.5 Pressurizer Level <strong>Co</strong>ntrol Test<br />

14.32.2.6 Rod Insertion Limit Test<br />

14.3.2.2.7 Steam Generator Water Level <strong>Co</strong>ntrol Test<br />

14.3.2.3 <strong>Plant</strong> Protection Logic System (PPL)<br />

14.3.2.4 Electrical Distribution System (EPS)<br />

14.3.2.4.1 Equipment/Electrical Supply Bus <strong>Co</strong>nnections<br />

14.3.2.4.2 Interconnecting Breaker Logic<br />

14.3.2.5 Radiation Monitoring System (RMS)<br />

14.3.3 Integrated System Tests ANS-3.5,1 985, Section 4.1<br />

14.3.3.1 Initial <strong>Co</strong>ndition Verification and <strong>Co</strong>ntrol Board Lineup Checks<br />

14.3.3.1.1 <strong>Co</strong>ld Shutdown, BOL<br />

14.3.3.1.2 Hot Standby, BOL<br />

14.3.3.1.3 100% Power, BOL<br />

14.3.3.1.4 100% Power, MOL<br />

14.3.3.1.5 100% Power, EOL<br />

14.3.3.1.6 100% Power, <strong>Co</strong>astdown<br />

14.3.4 Steady State Drift Test ANS-3.5, 1985, Section 4.1<br />

14.3.4.1 100% Power, BOL, Eq. Xe.<br />

Numbers in parentheses correspond to the numbers in parentheses in the indicated section of<br />

ANS-3.5, 1985.<br />

14.3.5 Heat and Mass Balance Tests ANS-3.5, 1985. Section 4.1 (2)<br />

14.3.5.1 100% Power Heat Balance<br />

14.3.5.2 75% Power Heat Balance<br />

14.3.5.3 NSSS Mass Balance<br />

14.3.5.4 BOP Mass Balance<br />

CON MASTER INDEX Rev 3(wvb)<br />

Page 51 of 61<br />

01991 Westinghouse Electric <strong>Co</strong>rp.