21.11.2014 Views

"Consolidated Edison Co Indian Point 2 Nuclear Plant ... - NRC

"Consolidated Edison Co Indian Point 2 Nuclear Plant ... - NRC

"Consolidated Edison Co Indian Point 2 Nuclear Plant ... - NRC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

. ATTACHMENT E2-F, page 7 of 11<br />

PERFORM REQ ACTIONS/RECOVER FROM A SOURCE RANGE FAILURE<br />

PERFORM REQ ACTIONS/RECOVER FROM AN INTERMEDIATE RANGE FAIL<br />

URE<br />

PERFORM REQ ACTIONS/RECOVER FROM A POWER RANGE FAILURE<br />

REMOVE AN EXCORE NI CHANNEL FROM SERVICE<br />

RECOVER FROM A S/G LEVEL CHANNEL FAILURE (LOW)<br />

RECOVER FROM A S/G PRESSURE CHANNEL FAILURE (HIGH)<br />

RECOVER FROM A STEAM FLOW CHANNEL FAILURE (LOW)<br />

. RECOVER<br />

RECOVER FROM A S/G LEVEL CHANNEL FAILURE (HIGH)<br />

RECOVER FROM A S/G FEED FLOW CHANNEL FAILURE (HIGH)<br />

FROM A S/G STEAM FLOW CHANNEL FAILURE (HIGH)<br />

RECOVER FROM A S/G STEAM PRESSURE CHANNEL FAILURE (LOW)<br />

RECOVER FROM A S/G FEED FLOW CHANNEL FAILURE (LOW)<br />

DRAIN THE ACCUMULATORS<br />

ADJUST ACCUMULATOR PRESSURE<br />

FILL THE ACCUMULATORS USING THE HHSI PUMPS<br />

PERFORM REQ ACTIONS/OPERATE THE S/G WITH EXCESSIVE TUBE LEAK<br />

AGE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!