SECTION 14 ACCEPTANCE TEST PROCEDURES (cont)<br />

14.2 Pre-FAT Testing<br />

14.1.6.7 BKRO7<br />

14.1.6.8 BKR08<br />

14.1.6.9 BKRO9<br />

14.2.1 Panel Hardware Verification Tests<br />

14.2.1.1 Annunciators<br />

14.2.1.2 Nameplates<br />

14.2.1.3 Meters<br />

14.2.1.4 Recorders<br />

14.2.1.5 Status Lights<br />

14.2.1.6 <strong>Co</strong>ntrollers<br />

14.2.1.7 Switches<br />

14.2.1.7 Miscellaneous <strong>Co</strong>mponents<br />

14.2.2 120 Hour <strong>Co</strong>ntinuous Operations Test<br />

14.2.3 Hardware Test Equipment and Special Tools<br />

14.2.4 Noise Simulation Test<br />

14.2.5 Certification of compliance to codes and standards<br />

14.2.6 1/0 Diagnostics Tests<br />

14.2.6.1 I/O System Spare Capacity Test<br />

14.2.7 Hardware Documentation<br />

14.2.8 <strong>Co</strong>mputer Systems Tests<br />

14.2.8.1 <strong>Co</strong>mputer Hardware <strong>Co</strong>nfiguration Test<br />

14.2.8.2 Spare Memory Test<br />

14.2.8.2.1 Gould <strong>Co</strong>mputers Spare Memory Test<br />

14.2.8.2.2 Sun <strong>Co</strong>mputers Spare Memory Test<br />

14.2.8.3 Duty Cydle Test<br />

14.2.8.3.1 Gould <strong>Co</strong>mputers Duty Cycle Test<br />

14.2.8.3.2 Sun <strong>Co</strong>mputers Duty Cycle Rest<br />

14.2.8.4 <strong>Co</strong>mputer Hardware Diagnostics<br />

14.2.8.4.1 Self Diagnostic Test<br />

14.2.8.4.2 Level 1 Macro Test<br />

14.2.8.4.3 Level 2 Macro Test<br />

14.2.8.5 Instructor Station Display Response Test<br />

14.2.9 Voltage and Ground Test<br />

14.2.10 Display Systems Test<br />

14.2.11 <strong>Co</strong>mmunication System Test<br />

14.2.12 Overtemperature Test<br />

14.2.13 Emergency Trip Test<br />

CON MASTER INDEX Rev 3(wvb) Page 50 of 61<br />

01991 Westinghouse Electric <strong>Co</strong>rp.