ATTACHMENT E2-F, page 5 of 11<br />

PERFORM REQ ACTIONS/RECOVER FROM A SEAL FAILURE<br />

FILL A RCP SEAL STANDPIPE<br />

PERFORM THE REQUIRED ACTIONS FOR A LOSS OF AN RCP<br />

BORATE THE RCS<br />

DILUTE THE RCS<br />

LINEUP THE MAKEUP CONTROL SYSTEM FOR AUTOMATIC OPERATION<br />

OPERATE THE MAKEUP CONTROL SYSTEM IN MANUAL<br />

START, STOP, AND SHIFT CHARGING PUMPS<br />

SHIFT LETDOWN ORIFICES<br />

PERFORM REQ ACTIONS/RECOVER FROM A FAILURE OF THE VCT MAKEUP<br />

CONTROL SYSTEM<br />

ESTABLISH EXCESS LETDOWN<br />

PERFORM REQUIRED ACTIONS FOR AN UNCONTROLLED REACTIVITY ADDI<br />

TION<br />

TRANSFER CHARGING PUMP FROM MANUAL TO AUTOMATIC CONTROL lAW<br />

SOP-3.1<br />

START ADDITIONAL CHARGING PUMPS WHEN WARMUP TIME NOT AVAILABLE<br />

lAW SOP-3.1<br />

TRANSFER CONTROL OF OPERATING CHARGING PUMP lAW SOP-3.1<br />

ESTABLISH/INCREASE LETDOWN FLOW lAW SOP-3.1<br />

PLACE THE RHR SYSTEM IN SERVICE<br />

REMOVE RHR FROM SERVICE<br />

PLACE OPS IN SERVICE<br />

STARTUP THE CCW SYSTEM