Fort Berthold Development Plans<br />

B<br />

1280 acres<br />

TF B TF<br />

1320’ 1320’ 1320’<br />

• Maximize long horizontals<br />

• Develop from pads: 2 Bakken/2 Three Forks<br />

• Tie in as soon as possible<br />

• Test inter-well spacing<br />

• Work with other operators to time development<br />

• Reduce cycle time to 45 days from rig release<br />

of final well on pad to production<br />

• Implement salt water disposal solution<br />

• Understand and successfully implement<br />

simultaneous operations<br />

TF B B TF<br />

1280 acres<br />

• Drilling and completion of additional wells<br />

on producing pads<br />

48