March 4, 2013 - Cabarrus County
March 4, 2013 - Cabarrus County
March 4, 2013 - Cabarrus County
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Materials used in the construction shall be new and not less than the quality conforming to current<br />
engineering and manufacturing practices. Materials shall be free of defects and suitable for service intended.<br />
Does your bid comply?<br />
Yes __X__ No_____<br />
Manufacturing Ability<br />
It is the intent of these specifications that the manufacturer of these vehicles has the ability to manufacture a<br />
complete ambulance within their plant facility, except for the chassis. The basic modular body must be built<br />
"in house" by the manufacturing firm and not "farmed out" to another company, corporation or production<br />
site. The entire modular unit must be built and finished in a single facility.<br />
The ambulance manufacturer must have no less than 5 years of experience in the construction of modular<br />
ambulance bodies and have built a minimum of 2000 such bodies. In addition, the Bidder/ manufacturer must<br />
include with this bid valid contact information for a minimum of ten (10) prior purchasers of a similar<br />
ambulance, with a minimum of three (3) from rural agencies in Idaho, in order to assist in our evaluation<br />
process.<br />
Does your bid comply?<br />
Yes __X__ No_____<br />
Testing<br />
The finished unit shall be subjected to complete testing including but not limited to fit and finish, door, door<br />
and cabinet latching, locking mechanisms, lights (both chassis and conversion), siren(s), environmental<br />
systems, suction and oxygen systems, general vehicle electrical systems, and restraint devices. The vehicle<br />
shall be driven for a distance of not less than 15 miles over a variety of roads to check for operations, noises,<br />
etc. Any defects found shall be noted and corrected.<br />
Does your bid comply?<br />
Yes __X__ No_____<br />
There shall be a water test conducted to check for leaks. This test shall be conducted in a specific booth or<br />
room designed for that purpose. There shall be multiple pressurized water jets from multiple directions for a<br />
minimum of 10 minutes. Any leaks found shall be noted and corrected.<br />
6<br />
Attachment number 1<br />
4-4<br />
Page 40