REVISED<br />
QSCB DESIGN AND CONSTRUCTION PROJECTS<br />
MILESTONE REPORT<br />
School<br />
Architectural<br />
Project<br />
Complete<br />
Current Status<br />
Issue<br />
Design<br />
Review<br />
Bid Issue<br />
Date<br />
Pre-Bid<br />
Meeting<br />
Bid<br />
Opening<br />
Date<br />
Construction<br />
Start<br />
Substantial<br />
Completion<br />
Date<br />
Central <strong>Cabarrus</strong> High Windows and Doors 85% Punchlist/Gym Windows 5/25/12 4/12/13 Gymnasium Clerestory Replacement - Spring Break<br />
Concord High School Chiller & Cooling Tower Replacement 99% Complete Awaiting final contractor invoice.<br />
Concord High School Controls Replacement 99% Construction 6/25/12 11/3/12 Punch listed field work complete as of 2-14-13<br />
Northwest <strong>Cabarrus</strong> High Chiller & Cooling Tower Replacement 99% Complete Awaiting final contractor invoice.<br />
Northwest <strong>Cabarrus</strong> High Controls Replacement 99% Complete Awaiting final contractor invoice.<br />
Northwest <strong>Cabarrus</strong> High Gym Addition 20% Construction 12/17/12 8/30/13 Site work phase.<br />
Notes<br />
Mechanical, Electrical and Plumbing Engineering<br />
Central <strong>Cabarrus</strong> High Electrical Vault Upgrades per Code 99% Construction 8/1/12 2/1/13 Substantially complete. Awaiting punchlist.<br />
Various Schools - Breaker Panels Upgrade Electrical Panels per Code 23% Construction 10/2/12 3/8/13 Survey and field study complete on 12 of 24 schools.<br />
Roof Replacement<br />
J.N. Fries Middle School Partial Roof Replacement 40% Design 10/24/12 11/7/12 2/<strong>2013</strong> 3/<strong>2013</strong> 4/1/13 9/1/13<br />
PostponedProjectstobeReinstatedpriorityorder<br />
Coltrane Webb Elementary Kitchen Hood Replacement 5% Design<br />
Mt. Pleasant High School Boilers Replacement 5% Design 11/15/11 Design Only; Funds for NWCHS Gymnasium<br />
Concord High School Weight Room & Vocational Building 10% Design TBD TBD TBD TBD TBD TBD Design underway. Survey complete.<br />
Northwest <strong>Cabarrus</strong> High* Practice Fields 5% Design 11/11/12 N/A N/A N/A TBD TBD Title change in process Investigating NC AANG Construction<br />
PostponedProjects<br />
Beverly Hills Elementary Chiller & Controls Replacement 5% Postponed Design Only - Funding transfer to NWCHS Gym<br />
Northwest <strong>Cabarrus</strong> High Entrance Canopy Modifications 0% Postponed Funds for NWCHS Gymnasium<br />
Mt. Pleasant Middle School Replace Chillers and Controls 5% Postponed Design Only; Funds for NWCHS Gymnasium<br />
*TobeusedbyBoger,NWCMS&NWCHS.<br />
3/4/<strong>2013</strong><br />
3-1<br />
Page 6