COMPARISON WITH NDDB (SAFAL) MARKET, BANGALORE<br />

S.No. Item Bangalore Rai<br />

1. Daily No. <strong>of</strong> Vehicle Arriving 600 250<br />

2. Expected Daily Arrival 2400 MT<br />

850 MT (2003)<br />

930 MT<br />

230 MT (First year)<br />

3. Average Vehicle Load 4 MT 4 MT<br />

4. Built up Area 6.00 lac Sq. ft (22% <strong>of</strong><br />

Total Area)<br />

3.00 lakh sq. ft.<br />

5. Aucti<strong>on</strong> System<br />

(i) Hall<br />

(ii) Technology<br />

(iii) System<br />

2 (Capacity <strong>of</strong> 150 in<br />

each)<br />

Mechanically Exposed<br />

Clock<br />

Only Dutch<br />

2 (Capacity <strong>of</strong> 100 in each)<br />

Plasma Display Clock<br />

3 Systems<br />

6. Cold Storage 10 (100 x 50) = 10,000 5 (100 x 50) = 500 MT<br />

MT<br />

7. Ripening Chamber 10 <strong>of</strong> 25 MT each 6 <strong>of</strong> 15 MT each<br />

8. Queuing <strong>of</strong> Vehicles (Average 4<br />

meters length)<br />

2400 meters (600<br />

vehicles )<br />

1000 meters<br />

(250 vehicles)<br />

9. Civil Cost 45 crores 24 crores<br />

10. Shops and Godowns 300 5100<br />

11. Cost <strong>of</strong> <str<strong>on</strong>g>Project</str<strong>on</strong>g> Rs.200 crore<br />

Above Rs. 100 crore<br />

already spent<br />

Rs.55 crore<br />

12. (Forward Linkages)<br />

Registrati<strong>on</strong> <strong>of</strong> Buyers;<br />

Inadequate Buyers<br />

Rigid- (Advance<br />

Deposit )<br />

Flexible - No Advance.<br />

Bank will Extend Credit Limit to<br />