The SMART <strong>Board</strong> of Directors has directed staff to negotiate an access easement with the Santa Rosa<br />

Canners LLC (the Cannery Project developers), and these negotiations are currently underway. Providing<br />

this access to the Cannery Project, on the adjacent parcel to the west fronting 3 rd Street, is a vital<br />

consideration in the development of the SMART site. The Cannery Project has two primary issues that<br />

drive the circulation concept and the location of potential buildings on the SMART site:<br />

1. The City of Santa Rosa requires a 28-foot wide clear area to provide emergency vehicle access<br />

from 3 rd Street along the frontage of the Cannery building. This 28-foot wide clear area can also<br />

provide pedestrian and bicycle access to the SMART site. The Santa Rosa Fire Department<br />

prefers a through connection from 3 rd Street to 6 th Street that is straight and direct. Beyond the<br />

Cannery building, provisions will be necessary for circulation of emergency vehicles as well.<br />

2. The Cannery Project requires a setback of 40 feet – 1 inch from its building face to any building<br />

face on the western side of the SMART property in order to meet building code requirements for<br />

allowable building area of the Cannery Project. Development teams can consult with the Santa<br />

Rosa Building Department to confirm this interpretation of the local building code.<br />

Preferred Circulation Concept<br />

To meet the circulation demands of the site, SMART has developed, in close cooperation with the City of<br />

Santa Rosa, an overall “Preferred Circulation Concept” for the site, provided as an attachment in<br />

Appendix C. The Preferred Circulation Concept satisfies vehicular, emergency, and transit access needs,<br />

along with local traffic engineering requirements. It represents the current, consensus approach to<br />

circulation on the site, but is not a mandatory component of development proposals. Respondents to the<br />

RFP are free to deviate from this suggested scheme, so long as they are able to satisfy basic SMART<br />

objectives, including transit access, provision of an easement along the Cannery Project, and City<br />

requirements relating to circulation and access.<br />

The Circulation diagram shows a 28-foot wide emergency vehicle access along the western edge of the<br />

property for the length of the Cannery Project. Some form of access accommodating emergency vehicles,<br />

possibly incorporating a small street, is shown continuing to 6 th Street. The character of this connection is<br />

subject to the determination of the development teams and SMART.<br />

In addition, the Concept calls for a two-way public access through-street beginning at 3 rd Street, generally<br />

paralleling the SMART right-of-way and intersecting 6 th Street aligned with Adams Street. This is where<br />

access to the rail station would occur, with space made available for buses, shuttles, and “kiss-and-ride”<br />

drop-offs. The design of this street would involve bus and shuttle bays that parallel the curb. This allows<br />

for flexibility, as curb space could be used in the near term for on-street parking and adjusted accordingly<br />

in the future with striping and signage as access needs change and evolve. While the diagram shows an<br />

east-west connection within the site aligned with 4 th Street, east-west connections on the site have not<br />

been established in the preferred circulation concept. The character and function of any east-west<br />

connection is subject to the determination of the developer.<br />

Parking Considerations<br />

There is no minimum number of automobile parking spaces being required for the purposes of serving<br />

SMART’s passenger rail service. The only auto parking spaces required are those needed to serve the<br />

development and comply with local development regulations. It is SMART’s policy to encourage low<br />

parking ratios in order to accomplish a pedestrian and transit-oriented design. SMART also strongly<br />

prefers that surface parking not be a prominent feature of the project, aside from on-street parking for new<br />

roadways. Parking can be located underground, in a structure interior to the development, or possibly<br />

accommodated in an off-site structure.<br />

Request for Proposals for Joint Development at <strong>Rail</strong>road Square -11-