Figure 7 Public Rights of Way Closures and Alternative Routes<br />

Residual Impacts<br />

7.1.24 The magnitude of impacts on PRoW would be significantly reduced by providing users<br />

with alternative routes, thereby maintaining a right of passage as well as connectivity<br />

within the surrounding PRoW network. Specifically, the impact associated with<br />

obstruction to PRoW would be reduced to a minor level for all affected routes. Table 2<br />

below represents a summary of the potentially significant impacts on recreation and<br />

amenity that would remain after the mitigation measures discussed above have been put<br />

into practice.<br />

<strong>Hinkley</strong> <strong>Point</strong> C Preliminary Works<br />

<strong>Non</strong> <strong>Technical</strong> <strong>Summary</strong><br />

Temporary <strong>Jetty</strong> Development 18 November 2010