Jetty Non Technical Summary - EDF Hinkley Point
Jetty Non Technical Summary - EDF Hinkley Point
Jetty Non Technical Summary - EDF Hinkley Point
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Figure 7 Public Rights of Way Closures and Alternative Routes<br />
Residual Impacts<br />
7.1.24 The magnitude of impacts on PRoW would be significantly reduced by providing users<br />
with alternative routes, thereby maintaining a right of passage as well as connectivity<br />
within the surrounding PRoW network. Specifically, the impact associated with<br />
obstruction to PRoW would be reduced to a minor level for all affected routes. Table 2<br />
below represents a summary of the potentially significant impacts on recreation and<br />
amenity that would remain after the mitigation measures discussed above have been put<br />
into practice.<br />
<strong>Hinkley</strong> <strong>Point</strong> C Preliminary Works<br />
<strong>Non</strong> <strong>Technical</strong> <strong>Summary</strong><br />
Temporary <strong>Jetty</strong> Development 18 November 2010