equiring temporary accommodation. Since there is a very substantial supply of such<br />

accommodation within a 45 minutes commute of <strong>Hinkley</strong> <strong>Point</strong>, there is unlikely to be any<br />

significant pressure from such numbers on the capacity of the tourism accommodation to<br />

satisfy the ongoing tourism market. The demand during off-peak periods may be of<br />

some benefit to suppliers of local tourism accommodation. As such, this could provide a<br />

small scale but nevertheless useful boost to the tourist accommodation sector and the<br />

Somerset tourism industry.<br />

7.7.10 Impacts on other socio-economic parameters (i.e. other services, quality of life and the<br />

wider economy) are also predicted to not be significant.<br />

Mitigation<br />

7.7.11 A series of mitigation measures would be introduced. For example, the estimated levels<br />

of local recruitment may be boosted through a proactive recruitment and training policy.<br />

Such an approach is important to meet the objectives of both the local and regional<br />

authorities and of <strong>EDF</strong> Energy, and would utilise initiatives being developed for the<br />

<strong>Hinkley</strong> <strong>Point</strong> C Project more generally through a Construction Workforce Development<br />

Strategy. These initiatives include a range of education, training and access initiatives.<br />

The programme for the jetty development (along side that for the site preparation works)<br />

provides an important opportunity to pilot, develop and fine-tune such initiatives.<br />

7.7.12 The Construction Workforce Development Strategy would include a range of measures to<br />

create a clear pathway to local employment, and would be put in place by early 2011.<br />

These measures are described in the following paragraphs.<br />

7.7.13 A Preliminary Works Skills’ Charter would be established to maximise opportunities for<br />

local people to be employed. Furthermore, <strong>EDF</strong> Energy has indicated that it is keen to<br />

support businesses in the local area<br />

7.7.14 An Employment Brokerage would provide a local one-stop shop facility, including on-line<br />

access, dedicated for the development. The brokerage would provide access for local<br />

people to job opportunities and a place where contractors would advertise their<br />

vacancies. The facility would include resourcing, job shops, and workplace managers<br />

engaging with the growing supply chain. The provision of such a facility adjacent to the<br />

site at Sizewell B helped to place 5,500 job applicants, many of whom had been<br />

unemployed.<br />

7.7.15 A Construction Skills Centre to be brought forward by Bridgwater College would be<br />

supported by <strong>EDF</strong> Energy for the provision of early entry level skills training. The<br />

contribution would be used to establish the physical development of the Centre, at a<br />

location which is practicable for the training required to support the Preliminary Works<br />

and the main <strong>Hinkley</strong> <strong>Point</strong> C Project.<br />

7.7.16 In addition, <strong>EDF</strong> Energy would encourage contractors to support and promote local<br />

recruitment, including targeting training for and recruitment from the unemployed and<br />

others in disadvantaged groups, to bring people back into the workforce. Furthermore,<br />

there should be potential for job transition supported through the Construction Workforce<br />

Development Strategy.<br />

7.7.17 <strong>EDF</strong> Energy would also monitor and publish, on a regular basis, information on the<br />

development’s performance on recruitment and training. The contractor for the site<br />

preparation enabling works has already committed to use at least two-thirds Somerset<br />

based workers to manage, supervise and carry out the work.<br />

<strong>Hinkley</strong> <strong>Point</strong> C Preliminary Works<br />

<strong>Non</strong> <strong>Technical</strong> <strong>Summary</strong><br />

Temporary <strong>Jetty</strong> Development 40 November 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!