8. Force Majeure clause: This <strong>Railway</strong>’s standard Force Majeure Clause shall only be<br />
applicable which is as follows:<br />
“In the event of any unforeseen event directly interfering with the supply of stores arising<br />
during the currency of contract such as war, insurrection, restraint imposed by the Govt.<br />
act of legislature or other disorganization of labour, acts of public enemy, acts of God,<br />
Sabotage etc. the contractor shall within a week from the commencement thereof notify<br />
the same in writing to the purchaser with reasonable evidence thereof. If the Force<br />
Majeure Clause mentioned above has in force for a period of 90 days of commencement<br />
of such force majeure, the same should be brought to notice of the purchaser by giving<br />
14 days notice in writing. In case of such terminations no damages shall be claimed by<br />
either party against the others are except those which had accrued under any clause of<br />
this agreement prior to such terminations.<br />
9. Risk purchase:<br />
1) Period of making risk purchase shall be 9 months from the date of completion of<br />
delivery period as indicated in the note appended to the clause 0702 of IRS<br />
conditions of contract.<br />
2) In respect of orders for materials where 10% security deposit, has been taken<br />
from firms Risk purchase clause will not be applicable and in case of default by<br />
such firms the security deposit shall be forfeited. (Authority: Rly Bd's letter No.<br />
2001/RS(G)779/14 Dated 21.9.2007)<br />
3) Risk purchase clause will be applicable for such cases which are not covered<br />
under para2 above, (Authority: Rly Bd's letter No. 2001/RS(G)779/14 Dated<br />
21.9.2007)<br />
10. Technical literature: Technical literature about tendered items should be given by the<br />
firm.<br />
11. Consignee: Material to be delivered to SSE(ZMC)BL.<br />
12 Code: Tenderer /contractor shall have proper identification marks on wear plates for<br />
ensuring proper identification of the manufacturer and Sr. No.<br />
13 Sample: Tenderer must deliver a sample of the material if required by consignee<br />
before making delivery of the supply.<br />
14. Drawings and specifications:<br />
a. RDSO has provided detailed specifications of the wear plates which are enclosed<br />
herewith as Annexure – II. RDSO specifications be treated as suggestive<br />
specifications only and not as mandatory specifications. The tenderer may adopt<br />
his / their own specifications of material for the supply of wear plates to be made<br />
and supplied.<br />
b. Fitment of the wear plates on the BCM machine shall be the responsibility of the<br />
firm solely<br />
15 Delivery period: Material shall be supplied within 60 days, Delivery schedule quoted<br />
contrary to this is liable to be passed over.<br />
16 F.O.R.: FOR will be Senior Section Engineer / ZMC/ BL (ZONAL MAINTENANCE<br />
CENTRE), VALSAD, Gujarat state.<br />
TENDERER’S SIGNATURE for CE/TMC/CCG 6<br />
WITH RUBBER STAMP<br />
WESTERN RAILWAY<br />
for and on behalf of President of India