8. Force Majeure clause: This <strong>Railway</strong>’s standard Force Majeure Clause shall only be<br />

applicable which is as follows:<br />

“In the event of any unforeseen event directly interfering with the supply of stores arising<br />

during the currency of contract such as war, insurrection, restraint imposed by the Govt.<br />

act of legislature or other disorganization of labour, acts of public enemy, acts of God,<br />

Sabotage etc. the contractor shall within a week from the commencement thereof notify<br />

the same in writing to the purchaser with reasonable evidence thereof. If the Force<br />

Majeure Clause mentioned above has in force for a period of 90 days of commencement<br />

of such force majeure, the same should be brought to notice of the purchaser by giving<br />

14 days notice in writing. In case of such terminations no damages shall be claimed by<br />

either party against the others are except those which had accrued under any clause of<br />

this agreement prior to such terminations.<br />

9. Risk purchase:<br />

1) Period of making risk purchase shall be 9 months from the date of completion of<br />

delivery period as indicated in the note appended to the clause 0702 of IRS<br />

conditions of contract.<br />

2) In respect of orders for materials where 10% security deposit, has been taken<br />

from firms Risk purchase clause will not be applicable and in case of default by<br />

such firms the security deposit shall be forfeited. (Authority: Rly Bd's letter No.<br />

2001/RS(G)779/14 Dated 21.9.2007)<br />

3) Risk purchase clause will be applicable for such cases which are not covered<br />

under para2 above, (Authority: Rly Bd's letter No. 2001/RS(G)779/14 Dated<br />

21.9.2007)<br />

10. Technical literature: Technical literature about tendered items should be given by the<br />

firm.<br />

11. Consignee: Material to be delivered to SSE(ZMC)BL.<br />

12 Code: Tenderer /contractor shall have proper identification marks on wear plates for<br />

ensuring proper identification of the manufacturer and Sr. No.<br />

13 Sample: Tenderer must deliver a sample of the material if required by consignee<br />

before making delivery of the supply.<br />

14. Drawings and specifications:<br />

a. RDSO has provided detailed specifications of the wear plates which are enclosed<br />

herewith as Annexure – II. RDSO specifications be treated as suggestive<br />

specifications only and not as mandatory specifications. The tenderer may adopt<br />

his / their own specifications of material for the supply of wear plates to be made<br />

and supplied.<br />

b. Fitment of the wear plates on the BCM machine shall be the responsibility of the<br />

firm solely<br />

15 Delivery period: Material shall be supplied within 60 days, Delivery schedule quoted<br />

contrary to this is liable to be passed over.<br />

16 F.O.R.: FOR will be Senior Section Engineer / ZMC/ BL (ZONAL MAINTENANCE<br />

CENTRE), VALSAD, Gujarat state.<br />

TENDERER’S SIGNATURE for CE/TMC/CCG 6<br />

WITH RUBBER STAMP<br />

WESTERN RAILWAY<br />

for and on behalf of President of India

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!