WESTERN RAILWAY<br />

<strong>Corrigendum</strong>-1 to <strong>Tender</strong> <strong>Document</strong><br />

In terms of Para 1.9 of <strong>Tender</strong> Notice, the clarification of <strong>Western</strong> <strong>Railway</strong> on the queries of participants of Pre-Bid Conference has been<br />

documented and is being uploaded as corrigendum-1 to <strong>Tender</strong> <strong>Document</strong><br />

Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

1 <strong>Tender</strong> form<br />

(First sheet)<br />

2 Chapter 3 Para<br />

3.1<br />

Thales<br />

Thales<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

GNon-compliance with any of the conditions set forth<br />

is liable to result in the tender being rejected<br />

GBooklet GCC Works handbook Parts I& II August<br />

98 are referred to.<br />

This mandatory compliance is linked to the No such text exists on First sheet.<br />

invitation to tender conditions only. However, this text is mentioned in<br />

Deviations to the General conditions and Para13 of Second sheet at page 11 of<br />

Special conditions are authorized if proposed tender document. This Para is self<br />

as per the format given in the tender explanatory.<br />

document (Form 4).<br />

<strong>Tender</strong> form (first sheet) refers to "<strong>Western</strong><br />

<strong>Railway</strong> Works Hand Book Part-III,(1984<br />

edition) corrected up to printed/advanced<br />

correction slip, Sanitary Works Hand Book<br />

(1977 edition) corrected up to<br />

printed/advance correction slip, Schedule of<br />

Rates part-I corrected up to printed/advance<br />

correction slip, Schedule of Rates part-<br />

II(1993 edition)". Kindly clarify the applicable<br />

documents.<br />

The applicable document for this<br />

tender has been mentioned in Para<br />

2.1.2 at page 13 of tender document.<br />

3 Chapter 4 Para<br />

4.1<br />

Thales<br />

G"Any deviations from these Special Conditions of<br />

Contract, Technical Requirement & Specifications,<br />

Schedule of Material & Supplies and/or any<br />

condition of tender document, if any, stated by the<br />

tenderer in his tender or subsequently introduced by<br />

the <strong>Railway</strong> shall be a part of the Contract only to<br />

such extent as have been explicitly accepted by the<br />

<strong>Railway</strong> and incorporated in the contract."<br />

Kindly clarify if there is a format of<br />

agreement/contract to be signed between<br />

the parties. See also para 4.31 (I).<br />

Para 4.1 & 4.31 are self explanatory.<br />

The contract agreement form will be<br />

as per Annexure-IV of GCC.<br />

4 Chapter 4 -<br />

Para 4.3.2 -<br />

(VII)<br />

Thales<br />

GThe tenderer shall do no work that may interfere<br />

with train traffic until adequate protection has been<br />

arranged as per the instruction of the Engineer in<br />

charge.<br />

Kindly clarify how the Engineer in charge will Please refer Appendix to Special<br />

be appointed. Is he external or internal to Conditions of <strong>Tender</strong> at page 88 of<br />

<strong>Railway</strong>s. What are the difference between tender document.<br />

Engineer in charge and other person acting<br />

on behalf of the <strong>Railway</strong>s such as Senior<br />

Section Engineer/Signal, Inspecting Officer,<br />

<strong>Railway</strong>s administration <strong>Railway</strong>s<br />

Supervisor, <strong>Railway</strong>s Engineer (Para 4.33.2)<br />

.<br />

Pre Bid Queries for TPWS 1


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

5 Chapter 4-<br />

Para 4.21 (IV)<br />

Thales<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

G"The revised schedule shall be approved by the<br />

Engineer-In-Charge only when considered justified<br />

in his opinion otherwise it may attract penal action<br />

on the contractor as per provision of this contract."<br />

Kindly explain what is the meaning of penal<br />

action on the contractor in case of non<br />

approval by the <strong>Railway</strong>s of the revised<br />

schedule, further to a request of revision<br />

from the <strong>Railway</strong>s.<br />

Please refer Para 4.49, 4.50 and 4.51<br />

of Special Condition of Contract<br />

(SCC).<br />

6 Chapter 4-<br />

Para 4.21 (V)<br />

Thales<br />

GThe Contractor shall be held responsible for the Kindly explain to which document refers the<br />

execution of the work according to the Programme concept of "Programme" compared to<br />

given for the execution of the work in full compliance Detailed Time and Activity Schedule (III) or<br />

of the approved cable route plans and also various "plan" referred elsewhere.<br />

clauses of technical specification and requirement.<br />

Please refer Para 4.6 and Para 4.21<br />

of SCC.<br />

7 Chapter 4-<br />

Para 4.33.3<br />

Thales<br />

GIn the A.C. electrified areas the special precautions<br />

as laid down in R.E. Manual shall be followed.<br />

Kindly explain what is "RE Manual" not<br />

referred to In Para 4.33.1<br />

R.E. Stands for <strong>Railway</strong><br />

Electrification. This refers to "Indian<br />

<strong>Railway</strong> Manual for A.C.Traction ".<br />

Pre Bid Queries for TPWS 2


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

8<br />

Cl. No.<br />

chapter 4 -<br />

Firm<br />

Thales<br />

T<br />

y<br />

p<br />

SAfter the equipment has been installed, tested &<br />

Para 4.40.1<br />

-placed in service and Provisional Acceptance<br />

FCertificate issued by <strong>Railway</strong>'s Engineer, the<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

contractor shall be responsible for proper<br />

maintenance supervision of the equipment for a<br />

period of 12 months (Minimum) from the issue of<br />

PAC. For this purpose he shall prepare a<br />

maintenance plan and make available the services<br />

of qualified maintenance engineer stationed the<br />

location approved by <strong>Railway</strong>'s Engineer who will<br />

guide and supervise the work of <strong>Railway</strong>'s<br />

maintenance staff. The maintenance engineer of the<br />

contractor will visit Master station and all the base<br />

stations at least twice in a month for regular upkeep<br />

and attend to any fault on the systems promptly.<br />

Kindly confirm if the 5 years period after<br />

FAT is a warranty period or a maintenance<br />

contract period whose price is deemed to<br />

included in the tender, given that Para 4.45<br />

says that no AMC is applicable.<br />

This Clause is self explanatory.<br />

Please refer Para 4.44 and 4.44.1<br />

also.<br />

9 chapter 4 -<br />

Para 4.44.1<br />

Thales<br />

GThe normal day-to-day operations and diagnosis to<br />

the extent possible will be done by the <strong>Railway</strong>,<br />

based on the guidelines provided by the supplier.<br />

Kindly confirm if "supplier" needs to be read<br />

as "contractor" and clarify what is the<br />

meaning of sentences in bold.<br />

Supplier means Original Equipment<br />

Manufacturer "OEM" of TPWS.<br />

Sentences in Bold are self<br />

explanatory requiring more attention.<br />

10 Chapter 4-Para<br />

4.46<br />

Thales<br />

G(vi) As for as SOR items are concerned, the limit of<br />

25% would apply to the value of SOR schedule as a<br />

whole and not on individual SOR items. However, in<br />

case of NS items, the limit of 25% would apply on<br />

the individual items irrespective of the manner of<br />

quoting the rate (single percentage rte or individual<br />

item rate).<br />

Kindly confirm if "SOR" actually refers to<br />

Chapter 6 Schedule of Material & Works. If<br />

not what is the meaning and content of this<br />

acronym<br />

The Schedule of Material & Works<br />

given is cahpter-6 consists of Non-<br />

SOR Items. "SOR" stands for<br />

"Schedule of Rates" issued by S&T<br />

Department of <strong>Western</strong> <strong>Railway</strong>.<br />

Pre Bid Queries for TPWS 3


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

11 Chapter 4 -<br />

Para 4.52<br />

Thales<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

G(b) In the event of the security being insufficient to<br />

cover the claimed amount or amounts or if no<br />

security has been taken from the Contractor, the<br />

purchaser shall be entitled to withhold and have lien<br />

to retain to the extent of such claim amount or<br />

amounts referred to spura, from any sum or sums<br />

found payable or which at any time thereafter may<br />

become payable to the Contractor under the same<br />

contract or any other department of the Central<br />

Government pending finalization or adjudication of<br />

any such claims.<br />

Kindly explain what is the meaning of<br />

"Spura".<br />

"supra" means "as referred above"<br />

12 chapter 4 -<br />

Para 4.54<br />

Thales<br />

G(a) If required by the Contractor, mobilization<br />

advance limited to 10% of contract value shall be<br />

payable on submission of irrevocable Bank<br />

Guarantee from a Scheduled Bank in India or the<br />

State Bank of India in a form acceptable and<br />

standard format to the <strong>Railway</strong>). Stage2: 5% of the<br />

contract value on mobilization of establishment etc.,<br />

i.e. setting up of project office and commencement<br />

of telecom. Works.<br />

Kindly confirm is a format for advance bank<br />

guarantee as per <strong>Railway</strong>s standard is<br />

available or not. What is the Telecom<br />

Woks<br />

Yes, standard format for Bank<br />

Guarantee is available. The line<br />

"Stage2: 5% of the contract value on<br />

mobilization of establishment etc., i.e.<br />

setting up of project office and<br />

commencement of telecom. Works."<br />

may be read as<br />

"Stage2: 5% of the contract value on<br />

mobilization of establishment etc.,<br />

i.e. setting up of project office and<br />

commencement of Works."<br />

Necessary correction is beimg<br />

incorporated in tender document.<br />

13 chapter 4 -Para<br />

4.55<br />

Thales<br />

SOn account payment in respect of other than supply<br />

-items shall not exceed 95% of the total payment due<br />

Fto the Contractor on each On account bill. For this<br />

purpose, the payment to the Contractor at each on<br />

account stage shall be restricted to 95% of the<br />

amount calculated on the basis of the rates<br />

indicated in the Schedule of work.<br />

Kindly clarify what are the payment schedule<br />

for "other than supply items". What is the<br />

meaning of the use of bold letters.<br />

The Payment schedule for "other<br />

than supply items" given in this Para<br />

is self explanatory.<br />

Pre Bid Queries for TPWS 4


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

14 chapter 4 -<br />

Para 4.64<br />

Thales<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

GThe Contractor/s shall not be entitled to make any<br />

claim whatsoever against the <strong>Railway</strong> under or by<br />

virtue of or arising out of this contract, nor shall the<br />

<strong>Railway</strong> entertain or consider any such claim, if<br />

made by the contractor/s after he/they would have<br />

signed a `No Claim Certificate' in favour of the<br />

<strong>Railway</strong>, in such form as shall be required by the<br />

<strong>Railway</strong>/s after the works are finally measured up.<br />

The Contractor/s shall be debarred from disputing<br />

the correctness of the items covered by “No Claim<br />

Certificate" or demanding a reference to arbitration,<br />

in respect thereof. After clear no claim as given by<br />

contractor the dispute, if any will not be arbitrable.<br />

The contractor shall not be entitled to ask for<br />

reference to arbitration, before the completion of the<br />

work assigned to him / them under this contract. The<br />

contractor/s shall seek reference to arbitration to<br />

settle disputes only once within the ambit of above<br />

condition.<br />

Kindly clarify the time frame for<br />

claim/arbitration.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

15<br />

Thales<br />

Technical specification of Train Protection and<br />

Warning (TPWS) System<br />

Following information are requested to be<br />

provided by the purchaser as below:-<br />

Thales<br />

TTechnical specification of Train Protection and<br />

-Warning (TPWS) System<br />

W<br />

S<br />

- Line layout (graphs) of the 2 line sections<br />

covered by the tender which shall include<br />

(track layout, turnouts, track data, track<br />

circuits, level crossings, relays rooms etc...)<br />

their designation / reference number and<br />

their exact position (line kilometer).<br />

It will be provided after award of<br />

contract.<br />

Thales<br />

TTechnical specification of Train Protection and<br />

-Warning (TPWS) System<br />

W<br />

S<br />

- Other relevant data such as (permanent<br />

speed restrictions, max line speed on each<br />

section, gradients, route details of each line<br />

in the section etc…).<br />

It will be provided after award of<br />

contract.<br />

Thales<br />

TTechnical specification of Train Protection and<br />

-Warning (TPWS) System<br />

W<br />

S<br />

- All relevant signaling equipment, signaling<br />

details & it's operational rules, position, type<br />

and no. of signals etc…<br />

It will be provided after award of<br />

contract.<br />

Pre Bid Queries for TPWS 5


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm<br />

Thales<br />

T<br />

y<br />

p<br />

TTechnical specification of Train Protection and<br />

-Warning (TPWS) System<br />

W<br />

S<br />

E<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

- The traffic handled by each line: types of<br />

trains using that line, their car configuration<br />

(e.g. freight, long-distance Passenger,<br />

commuter EMUs/DMUs,…), each train<br />

length, weight, deceleration factor, and<br />

respective minimum, maximum speeds,<br />

minimum headway, number of trains per<br />

day, details on wheel diameter etc…<br />

It will be provided after award of<br />

contract.<br />

Thales<br />

TTechnical specification of Train Protection and<br />

Warning (TPWS) System<br />

E<br />

- Type of braking system (electrical or<br />

pneumatic) & their interfacing with TPWS<br />

system and braking distance in each section<br />

The Braking system for MEMU is<br />

"Electro-pneumatic & Auto brake<br />

system". The Braking System foe<br />

WAP-4 Locomtive is "Indian <strong>Railway</strong><br />

Air Brake (Tri-plate/CLW rake<br />

mounted)". Other details will be<br />

provided after award of contract.<br />

16 CHAPTER 6 :<br />

SCHEDULE<br />

OF WORKS &<br />

SUPPLIES -<br />

A1.1 b)<br />

Thales<br />

Thales<br />

TTechnical specification of Train Protection and<br />

-Warning (TPWS) System<br />

W<br />

E<br />

TEach MEMU will need two OBCs<br />

-<br />

W<br />

S<br />

E<br />

- Emergency braking & service braking<br />

details and their deceleration factor (Min.<br />

and Max.)<br />

When using two independent OBCs, there<br />

will also be the need for a additional BTM,<br />

additional wheel sensors and train<br />

interfaces. Please consider deviant quantity.<br />

It will be provided after award of<br />

contract.<br />

For each independent OBC one BTM<br />

plus antenna has been catered for<br />

for MEMU cab.<br />

17 CHAPTER 6 :<br />

SCHEDULE<br />

OF WORKS &<br />

SUPPLIES -<br />

B2.1<br />

Thales<br />

TProposed Quantities of various types of<br />

WEurobalise(s) (switchable, infill, repositioning) should<br />

Sbe submitted by tenderer as per Signalling plans.<br />

When will the tenderer receive the<br />

mentioned signalling plan Is the quantity of<br />

balises proposed or mandatory<br />

There is a difference between switchable<br />

and fixed balises which has also an effect on<br />

costs. Please specify the quantity of these<br />

two variants.<br />

Signalling Roll Plan is being made<br />

part of tender document. The<br />

quantities of balises are mandatory.<br />

The quantities of two type of balises<br />

have been mentioned in various<br />

itmes of the tender shedule.<br />

Pre Bid Queries for TPWS 6


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

18<br />

Cl. No.<br />

Technical<br />

Firm<br />

Thales<br />

T<br />

y<br />

p<br />

TTPWS shall be suitable for all types of EMUs,<br />

specification of<br />

-MEMUs, DMUs, electric and diesel locomotives,<br />

Train<br />

RDistributed Power wireless control of locomotive<br />

Protection and<br />

D(Locator), including all types of microprocessor<br />

Warning<br />

Sbased locomotives, running on Indian <strong>Railway</strong>s.<br />

(TPWS)<br />

O<br />

System 4.6<br />

19 Technical<br />

specification of<br />

Train<br />

Protection and<br />

Warning<br />

(TPWS)<br />

System 5.3<br />

Thales<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

TCalculation of Speed: The system shall incorporate<br />

-the necessary hardware and software module for<br />

Raccurate calculation of the train speed duly<br />

Daccounting for wheel slip/skid corrections.<br />

SManufacturer shall submit the details of the speed<br />

O calculation module along with the supporting<br />

Tinternational standards/practices being followed<br />

-world over for the same. Calculation of speed shall<br />

Wbe with an accuracy of ±2% subject to maximum of<br />

E±2 kmph. Further, the variation in wheel diameter<br />

due to normal wear during time period between two<br />

loco maintenance schedules shall not affect<br />

accuracy beyond the limits specified in this clause.<br />

Even if the OnBoard System is suitable for<br />

all types of trains, loco engineering for every<br />

single train type is necessary and has to be<br />

done.<br />

What is the actual state of technology in<br />

India<br />

Which technology is used for speed<br />

measurement.<br />

Is the accuracy of 2% also applicable for<br />

speeds below 100 km/h<br />

How much is wear of the wheel diameter<br />

between the maintenance period Please<br />

clarify.<br />

This is condition is as per Para 4.6 of<br />

RDSO/SPN/183/2011 Ver.2 and is<br />

self explanatory and should be read<br />

in totality.<br />

This is condition is as per Para 5.3 of<br />

RDSO/SPN/183/2011 Ver.2 and is<br />

self explanatory and should be read<br />

in totality. However, Contactor may<br />

do site survey and interact with<br />

RDSO.<br />

20 Technical<br />

specification of<br />

Train<br />

Protection and<br />

Warning<br />

(TPWS)<br />

System 8.5<br />

Thales<br />

TThe design of on board & track side systems shall<br />

-take into account switching transients that may<br />

Roccur, in either the system or out side, of any<br />

Dmagnitude, up to and including interruption due to<br />

Sshort circuit of 25 KV system. The design shall also<br />

Otake into account supply related surge & transient.<br />

There is no possibility to make a compliance<br />

statement to unlimited transients!<br />

The system should be compliant to<br />

latest UNISIG/RDSO specifications<br />

and compatible for 25 KV, 50hz AC<br />

electric traction.<br />

Pre Bid Queries for TPWS 7


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

21<br />

Cl. No.<br />

<strong>Tender</strong><br />

Firm<br />

Thales<br />

T<br />

y<br />

p<br />

TCh 1.2 - Broad scope of the work is the Design,<br />

heading & ch<br />

-Supply, Installation, Testing and Commissioning of<br />

1.2 brief scope<br />

WOn Board Equipments in<br />

of work<br />

SLocomotives/MEMUs/EMUs and Trackside<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Equipments along with associated works for Train<br />

Protection Warning System (TPWS) in Virar (at Km<br />

60) – Vadodara (at Km 397) Section of <strong>Western</strong><br />

<strong>Railway</strong><br />

<strong>Tender</strong> Name - Survey, Design, Supply, Installation,<br />

Testing and Commissioning of On Board<br />

Equipments in Locomotives/MEMUs and Trackside<br />

Equipments along with associated signalling works<br />

for Train Protection and Warning System (TPWS)<br />

in Virar (at Km 60)-Vadodara (at Km 397) section on<br />

<strong>Western</strong> <strong>Railway</strong><br />

22 Ch 4.3.2 (II) Thales TThe On-board equipments as per RDSO<br />

-Specification No.RDSO/SPN/183/2011 Version-2<br />

Rwith latest amendments are to be provided on 40<br />

Dnumbers of WAP-4 locomotives and 10 MEMUs<br />

S(20 driving cabs) as per details given in Schedule of<br />

OWork<br />

23 Ch 4.3.2 (VI) Thales TInstallation of the track side equipments with<br />

-accessories including track balise, Line Electronic<br />

WUnit (LEU) and its interface with the signal aspects,<br />

Sand all other signalling equipment required for<br />

satisfactory performance of the complete system.<br />

Cable laying, foundation and erection of cable<br />

termination etc. as required, has to be done by the<br />

contractor. Any other activity required for the<br />

completion of the work will have to be done by the<br />

contractor to meet the end objective of the TPWS,<br />

this being a turn key contract<br />

Is this tender is for only Main line signalling<br />

as we can see there is a difference in tender<br />

name and ch 1.2 - brief scope of work.<br />

Because no EMU included in the tender<br />

name.<br />

Please provide us the drawing plan of WAP-<br />

4 locomotive and MEMU. It will be used as<br />

reference for identifying the space for fixing<br />

the DMI in the Cab.<br />

Can you please provide the interfacing port<br />

or details of relay interlocking or signal side<br />

for interfacing with LEU.<br />

This tender is for Main line signalling<br />

consisting of Automatic Signalling<br />

section including stations. Please<br />

refer Para 4.3 of SCC.<br />

It will be provided after award of<br />

contract.<br />

Potential free contacts of Lamp<br />

Checking Relays (ECR) .Please refer<br />

clause 4.17 of RDSO specification<br />

RDSO/SPN/183/2011 Ver. 2.0 also.<br />

Pre Bid Queries for TPWS 8


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

24 Ch 4.3.2 (VII) Thales TIn case of distributed assets, Contactor has to lay Do LEU shall be made centralized. If yes, is<br />

-power cable from the Relay Room/Relay Hut to LEU the relay room is AC or Non Ac where LEU<br />

Wlocation in trench as per technical specification / site cabinet is going to be placed or installed. It<br />

S requirement and derive 110 Volt AC for LEU power will be helpful for calculating the Reliability<br />

Tsupply , with the help of 230/110 Volt transformer , and Availability of the LEU system.<br />

-to be installed in location box or at suitable location.<br />

RThe installation of location box will be done by<br />

Dcontractor as per site requirement. However, at<br />

Ssome locations <strong>Railway</strong> may decide to keep LEUs<br />

Oinside Relay Room/Relay Hut and power supply for<br />

LEUs may be taken from 110 V or 230 V AC power<br />

supply arrangement. <strong>Tender</strong>er should indicate the<br />

power (voltage, current and power consumption)<br />

requirement of the equipments.<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

LEU shall be centralized in Non-AC<br />

Relay room / Equipment Room /<br />

Relay huts to the extent possible.<br />

25 ch 4.3.2 (VII) -<br />

We think it is<br />

editorial<br />

mistake in<br />

numbering the<br />

points in the<br />

tender<br />

Thales<br />

Installation practices of all signalling gears should be<br />

Gas per the Signal Engineering Manual (New) of<br />

Indian <strong>Railway</strong> and to suit the latest correction slips,<br />

<strong>Western</strong> <strong>Railway</strong> and OEM‟s practices in vogue.<br />

The tenderer shall do no work that may interfere<br />

with train traffic until adequate protection has been<br />

arranged as per the instruction of the Engineer in<br />

charge. All the tools & Measuring Instruments,<br />

required for installation & Testing will have to be<br />

brought by the tenderer at his own cost.<br />

Can you please provide us the Signal<br />

Engineering manual and also the latest<br />

correction slip details.<br />

Can you also provide the time table of the<br />

trains so that we can schedule our<br />

installation activities in such a way there will<br />

not be any interference with train traffic.<br />

1. Signal Engineering Manuals can<br />

be seen on the website<br />

www.indianrailways.gov.in 2. Timetable<br />

can be purchased from <strong>Railway</strong><br />

Book stall.<br />

26 ch 6 A 4.2 Thales TProvision of testing facility at Electric Loco /MEMU<br />

-Shed / simulation /Training centre (Vadodara) each<br />

Rlot consisting of following Items:-<br />

D<br />

SDriver MMI-ETCS Level1( for both cabs) (CENLEC<br />

O Type) - Number of qty - 1 No<br />

T<br />

27 Annexure 2 Thales GInformation to be supplied by the purchaser.<br />

RDSO spec for<br />

Relevant G & SR rules applicable along with speed<br />

TPWS, ch 14 g<br />

restriction limits.<br />

Is one MMI is sufficient enough for testing<br />

and fulfilling the requirements as the WAP 4<br />

loco is twin cab and MEMU is double sided<br />

cab.<br />

Can WR provide us the G&SR rules<br />

In the Loco Shed, testing may be<br />

done on the MMI installed on<br />

locomotive/MEMU. However, this<br />

requirement is for training and<br />

simulation purpose.<br />

It will be provided after award of<br />

contract.<br />

Pre Bid Queries for TPWS 9


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

28 Annexure 2<br />

RDSO spec for<br />

TPWS, general<br />

requirements<br />

ch 4.12<br />

Thales<br />

29 Provisional<br />

Acceptance<br />

Certificate 4.39<br />

Point C (Page<br />

No. 68)<br />

Hytronics<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

TThe brake commands generated by the TPWS shall<br />

-be used for application of service & emergency<br />

Rbrakes of locomotives.<br />

D<br />

S<br />

O<br />

T<br />

GIt is necessary to specify the maximum Purchaser<br />

response time to start testing each sub-section or<br />

rolling stock, after contractor communicates that it is<br />

ready to be handed-over in case the equipment is<br />

performing correctly.<br />

Can you provide us Emergency braking &<br />

service braking details and their deceleration<br />

factor (Min. and Max.)<br />

Suggested amendment, to add the<br />

following: "Purchaser shall provide all<br />

necessary personnel and resources to start<br />

the testing, within 3 days from receiving<br />

advice of completion of one sub-section or<br />

rolling stock from the contractor.<br />

It will be provided after award of<br />

contract.<br />

<strong>Tender</strong> Condition remain unchanged.<br />

30 Liquidated<br />

Damages &<br />

<strong>Railway</strong>'s rights<br />

4.49 (Page No.<br />

75)<br />

Hytronics<br />

GWhat does "<strong>Railway</strong> is not satisfied of the works"<br />

mean Is the satisfaction associated to an objective<br />

and material breach of the Contractor<br />

This Para is self explanatory and<br />

should be read in totality. Overall<br />

performance of TPWS system<br />

should be satisfactory as per<br />

specification and tender conditions.<br />

31 Warranty<br />

maintenance<br />

4.44.1 (Page<br />

No. 72)<br />

Hytronics<br />

Fault rectification and regular preventive<br />

Gmaintenance of the total installation is to be done by<br />

the contractor within the warranty period of Five<br />

Years under warranty<br />

maintenance…………………………………. The<br />

maintenance engineer of the contractor will visit<br />

Master station and all the base stations at least<br />

twice in a month for ensuring implementation of<br />

maintenance plan and attend to any fault on the<br />

systems.<br />

Please clarify what means "regular<br />

preventive maintenance" and if this visit will<br />

be mandatory.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

32 Warranty<br />

maintenance<br />

4.44.1 (Page<br />

No. 72)<br />

Hytronics<br />

GThe penalty as mentioned in Para 4.40.2 will be<br />

applicable for any default on account of nonavailability<br />

of spares.<br />

Please<br />

clarify the details about amount and cap of this<br />

penalty.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

Pre Bid Queries for TPWS 10


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

33 3.1 General<br />

condition of<br />

contract (Page<br />

No. 38)<br />

Hytronics<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

GIt is stated that General Conditions of Contract<br />

(GCC) Works Hand Book Parts I & II August 98<br />

edition / latest edition (with latest amendments), may<br />

be purchased by <strong>Tender</strong>er(s) from Engineering<br />

Depts. Of <strong>Western</strong> <strong>Railway</strong> at their own cost.<br />

Can you provide us a copy Please specify<br />

the method to purchase it.<br />

The General Conditions of Contract<br />

(GCC) along with corrction slips can<br />

be seen on the website<br />

www.indianrailways.gov.in<br />

34 4.61 Insurance<br />

of Materials &<br />

Installations<br />

(Page No. 81)<br />

Hytronics<br />

GThe contractor shall take out and keep in force a<br />

policy or policies of insurance for all materials<br />

including <strong>Railway</strong> supply materials equipment until<br />

such works are provisionally handed over to the<br />

<strong>Railway</strong>s. For this purpose the works are deemed to<br />

have been provisionally handed over when<br />

Provisional acceptance certificate is issued for the<br />

Sub-section as per Para 4.39 of SCC..................<br />

Please clarify when does property transfer There no issue of property transfer.<br />

happens, from Contractor to Customer Des The contractor will be responsible<br />

property transfer happens at PAC for proper up-keep of equipments<br />

supplied and installed till warranty<br />

period is over.<br />

35 Schedule of<br />

Supply and<br />

Installation Part<br />

A), Point A3<br />

(Page No. 99)<br />

Hytronics<br />

36 Schedule 'A' - Hytronics<br />

Clause B1.1<br />

(Page No. 115)<br />

37 Chapter 4<br />

SCC, Cl 4.3.1,<br />

page no. 39<br />

Invensys<br />

TWhat is meant exactly for "diagnostic software,<br />

-maintenance / diagnostic tool" Is diagnostic<br />

Rsoftware and hardware included in scope of supply<br />

DOr only software Where is the diagnostic data<br />

Sforeseen to be used: on site or at remote location<br />

O We could not find any diagnostic software or<br />

Thardware items included in the Rate Schedules / Bill<br />

-of Quantities at Section III of <strong>Tender</strong> <strong>Document</strong>s.<br />

W<br />

S<br />

T<br />

We understand that each Line side cabinet<br />

-<br />

is designed to accommodate one LEU<br />

R<br />

module.<br />

Is it<br />

D<br />

possible to install more than one LEU<br />

S<br />

module inside a Line side electronic unit<br />

O<br />

cabinet or Line side electronic unit rack<br />

T<br />

If it is possible, how will WR manage the<br />

-<br />

payment of this solution<br />

W<br />

TAt present, the section contains approximately 835 Please clarify the extent of minor changes,<br />

-Signals including Automatic & Station signals in UP in terms of no. of signals / level crossings<br />

Wand Down direction for passenger running lines. etc.<br />

SThere are 49 Nos of Station (including Virar &<br />

Vadodara), 117 Interlocked gates in the section<br />

and there can be minor changes with time<br />

This Para is self explanatory and<br />

should be read in totality. It includes<br />

software and hardware both. The<br />

diagnostic data is required to be<br />

seen at site and remote location.<br />

Please quote as per Schedule.<br />

However, based on RDSO guidelines,<br />

if any, the schedule is likely to be<br />

amended . Future corrigendum may<br />

be seen in this regard.<br />

Minor changes may likely to happen<br />

in terms of no. of signals / level<br />

crossings. However, if there are<br />

changes in supply & execution items,<br />

it will be governed by Para 4.46 of<br />

SCC.<br />

Pre Bid Queries for TPWS 11


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

38<br />

Cl. No.<br />

Chapter 4<br />

Firm<br />

Invensys<br />

T<br />

y<br />

p<br />

TProvision of one potential free contact for each<br />

SCC, Cl 4.3.3,<br />

-signal aspect including calling on „A‟/‟G‟ marker in<br />

iv), page no. 42<br />

WRelay Room/Relay Hut<br />

S<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

We understand LEUs will be in centralized<br />

location either in Relay room / or at the<br />

Relay Huts (Goomties). Please confirm the<br />

same.<br />

LEU shall be centralized in Relay<br />

room / Equipment Room / Relay<br />

huts, as far as possible.<br />

39 Chapter 4<br />

SCC, Cl 4.6,<br />

a), Completion<br />

period, page<br />

no. 44<br />

Invensys<br />

GThe time schedule for the entire work is of utmost<br />

importance. The entire work is required to be fully<br />

executed within 18 months from date of issue of<br />

Letter of Acceptance (LOA).<br />

We request you to increase the completion<br />

period to 24 months instead of 18 months.<br />

The completion period for this is 18<br />

months. However, any change in this<br />

regard will be notified, subsequently.<br />

40 Chapter 4<br />

SCC, Cl 4.6,<br />

c), Completion<br />

period, (V)<br />

page no. 45<br />

&<br />

cl. 4.20.1,<br />

Functional<br />

Acceptance<br />

Tests, page no.<br />

53<br />

Invensys GSupply of Materials We request, D – reference shall commence<br />

from the date of functional test approval of<br />

the prototype by RDSO/Purchaser<br />

<strong>Tender</strong> Condition remain unchanged.<br />

41 Chapter 4<br />

SCC, Cl 4.55,<br />

On Account<br />

Payment, page<br />

no. 79<br />

42 Chapter 5<br />

Technical<br />

Specification &<br />

Requirements,<br />

RDSO Cl.<br />

14.0(j), page<br />

no. 90<br />

43 Chapter 6<br />

Schedule of<br />

Supplies &<br />

Works, Part A,<br />

S.No A1.3.<br />

page no. 98<br />

Invensys<br />

Invensys<br />

Invensys<br />

SFor supply items of tender schedule 75% (Seventy<br />

-five percent) of the value of each consignment shall<br />

Fbe paid on receipt of materials at consignee store<br />

depot and on production of the following documents:<br />

We request you to consider 90% on receipt<br />

of materials against 75% in the tender.<br />

T8 Position Switch Please clarify the purpose of 8 Position<br />

-<br />

Switch when CENELEC DMI is used.<br />

W<br />

S<br />

E<br />

TBTM plus antenna – 60 Nos.<br />

-<br />

R<br />

D<br />

S<br />

O<br />

T<br />

Only one antenna per loco and one antenna<br />

per MEMU is considered, please clarify the<br />

position of the antenna where it would be<br />

mounted (Front / Rear / Center of the Loco<br />

or MEMU).<br />

<strong>Tender</strong> Condition remain unchanged.<br />

8 Position Switch for CENELEC DMI<br />

is not required. Necessary corrction<br />

is being made in tender document.<br />

One antenna per loco and two<br />

antenna per MEMU have been<br />

considered. Antenna will be placed<br />

as per RDSO guidelines during the<br />

execution.<br />

Pre Bid Queries for TPWS 12


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

44 Chapter 6<br />

Schedule of<br />

Supplies &<br />

Works, Part B,<br />

S.No B1.2 &<br />

B1.3. page no.<br />

101<br />

Invensys<br />

45 Chapter 6<br />

Schedule of<br />

Supplies &<br />

Works, Part B,<br />

Sr. No B2.1<br />

page no. 101<br />

46 Chapter 6<br />

Schedule of<br />

Supplies &<br />

Works, Part B,<br />

Sr. No B11<br />

page no. 103<br />

47 <strong>Tender</strong><br />

Schedules<br />

Invensys<br />

Invensys<br />

Invensys<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

TSupply of LEU Line Side Cabinets – 560 Nos.<br />

-Supply of Power Supply for LEUs – 560 Nos.<br />

W<br />

S<br />

T<br />

-<br />

R<br />

D<br />

TSupply of Eurobalise – 1452 Nos.<br />

-<br />

W<br />

S<br />

TLaying of Telecom / data cable<br />

-<br />

W<br />

S<br />

T<br />

-<br />

W<br />

S<br />

48 Invensys T<br />

-<br />

W<br />

S<br />

49 6(b) & 2.15.2<br />

(Page No. 9<br />

&31)<br />

Ansaldo<br />

G<br />

F<br />

LEU will be centralized or de-centralized.<br />

Please classify the various balise<br />

requirements.<br />

Please clarify the purpose of the Telecom<br />

Cable<br />

Do we need to quote only for the quantities<br />

mentioned in the Schedules or any<br />

optimization or value addition can be done<br />

For better understanding of the<br />

requirements, please provide us a copy of<br />

the signalling roll plan.<br />

LEU will be centralized in Relay room<br />

/ Equipment Room / Relay huts, as<br />

far as possible.<br />

It consists of switchable, infill and<br />

repositioning balises. The details has<br />

to worked out by tenderer as per<br />

signalling plan.<br />

It is basically data cable suitable for<br />

TPWS as per RDSO/UNISIG<br />

specification.<br />

Please refer Para 2.14 of tender<br />

document.. <strong>Tender</strong>ers have quote<br />

only as per tender schedule.<br />

Signalling Roll Plan is being made<br />

part of tender document.<br />

The <strong>Tender</strong>er(s) shall keep the offer open for a minimum We period request of <strong>Railway</strong>s 6 calendar to months stipulate from a the date <strong>Tender</strong> of opening Condition of the tender. remain It is unchanged. understood that the tender documen<br />

maximum time period, after which the<br />

tenderer would be allowed to make<br />

commercial changes if there are any.<br />

50 6(d)<br />

(Page-10)<br />

Ansaldo<br />

GThe earnest money of the unsuccessful tenderer(s)<br />

will, save as here-in-before provided, be returned to<br />

the unsuccessful tenderer(s) within a reasonable<br />

time but the <strong>Railway</strong> shall not be responsible for any<br />

loss or depreciation that may happen to the Security<br />

for the due performance of the stipulation to keep<br />

the offer open for the period specified in the tender<br />

document or to the Earnest Money while in their<br />

possession nor be liable to pay interest thereon.<br />

We request that the reasonable time be<br />

defined and also in case of bid extension on<br />

account of railways reasonable interest<br />

payment to be made to unsuccessful bidder.<br />

We request this to be considered in light of<br />

the substantial value of EMD.<br />

<strong>Tender</strong> Condition remain unchanged.<br />

Pre Bid Queries for TPWS 13


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

51 4.3.2(XIV)<br />

(Page-42)<br />

Ansaldo<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

GNo party to the Joint Venture has right to assign or<br />

transfer the interest, right or liability in the contract<br />

without the written consent of the other party and<br />

that of the <strong>Railway</strong>.<br />

52 {4.3.2(X), A4 & B7} Ansaldo {Page-42, T99 In reference & 102} to all three clauses, please note that<br />

-any facility provided shall be for training/simulation<br />

Wand not for repair and maintenance<br />

S<br />

E<br />

53 4.6<br />

(Page-44)<br />

Ansaldo<br />

Can the parties sub-contract<br />

This Para is self explanatory and<br />

should be read in totality along with<br />

provisions of General Condition of<br />

Contact (GCC).<br />

Hence we request this be amended to<br />

training/simulation.<br />

Also<br />

This Para is self explanatory and<br />

should be read in totality. <strong>Tender</strong><br />

we request that both A4 and B7 be Condition remain unchanged. Please<br />

considered as optional and not be used for quote only as per TENDER Schedule.<br />

tender evaluation as training set up may vary<br />

between manufacturers.<br />

GCompletion Period: The time schedule for the entire work <strong>Railway</strong>s is of utmost to kindly importance. consider 24 The months entire as work is The required completion to be fully period executed for this within is 18 months from date of issue<br />

period of completion of project considering months. However, any change in this<br />

that there is an initial test phase consisting regard will be notified, subsequently.<br />

of 10 trackside and 2 onboard equipments.<br />

54 4.10 (i)<br />

(Page-48)<br />

55 4.37<br />

(Page-66)<br />

Ansaldo<br />

Ansaldo<br />

SThe tenderer shall give, in writing along with the tender, 5 years an undertaking is a very long that time the components for price to be / modules <strong>Tender</strong> as also Condition the main remain equipment unchanged. quoted in the schedule requiremen<br />

-<br />

kept fixed, hence we request that the point<br />

F<br />

be amended to mutually agreeable price<br />

T<br />

every year. Alternately, we request that<br />

-<br />

instead of warranty for 5 years <strong>Railway</strong><br />

W<br />

could consider a reduced duration of<br />

S<br />

warranty and to include Annual Maintenance<br />

E<br />

Contract for extended duration which would<br />

T<br />

be beneficial to <strong>Railway</strong>s.<br />

-<br />

R<br />

SThe contractor shall be responsible for and supply any If additional the drawings equipment are already without approved extra cost by for any <strong>Tender</strong> alterations Condition of the remain works due unchanged. to any discrepancies, errors or omis<br />

-<br />

<strong>Railway</strong>s we request that the terms be<br />

F<br />

amended to „additional equipment at extra<br />

cost‟.<br />

57 4.49 (a) & (b) Ansaldo GIn the event of any failure or delay by the <strong>Railway</strong> to hand Any delay over to arising the contractor account possession of <strong>Railway</strong>s of the lands This / Para premises/ self locomotives/MEMUs explanatory and necessary for the execution<br />

(Page-75)<br />

should result in an extension of completion<br />

date. We request that this be included.<br />

these Paras are in connection with<br />

"Extension Time on <strong>Railway</strong><br />

account".<br />

Pre Bid Queries for TPWS 14


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

58 4.51<br />

(Page-75)<br />

Ansaldo<br />

p<br />

GIn the event of any loss to the purchaser on account of Could execution you please and/or clarify delay this in completion clause of the work This or Para any is part self thereof explanatory by agencies and other than the contractor, the<br />

should be read in totality. The<br />

contractor has to ensure completion<br />

of work within completion period<br />

including permission, approval ,<br />

Inspection and execution of all<br />

agencies involved in the work. Any<br />

delay in this regard will be on<br />

contractor's account except<br />

conditions mentioned in Para 4.49 (a)<br />

& (b) of SCC.<br />

59 4.52.2<br />

(Page-76)<br />

Ansaldo<br />

GAny sum or sums of money due and payable to the Contractor Any right (including of lien or set-off the security should deposit be returnable This to Para him under is self the explanatory contract) may and be withheld or retained by way<br />

restricted solely to this contract.<br />

should be read in totality. <strong>Tender</strong><br />

Condition remain unchanged.<br />

60 B8<br />

(Page-102)<br />

61 4.55<br />

(Page-79&80)<br />

Ansaldo<br />

Ansaldo<br />

TSupply of Data Cable suitable for connecting LEU with Using Eurobalise(s), multiple data as per cores requirements in one cable of may TPWS. In The view data of RDSO cable should guideline be conforming regarding to relevant CENELEC /UIC<br />

-<br />

R<br />

have some problem with the integrity of data data cabe, "Data cable of one pair is<br />

due to cross talk (insulation breakdown) and to be used for each balise<br />

D<br />

S<br />

short circuit. Thus use of separate cable for<br />

each balise is preferable from the safety<br />

separately". <strong>Tender</strong> Condition and<br />

Schedule in this regard is being<br />

O<br />

point of view and hence we request railways amended . Future corrigendum may<br />

T<br />

-<br />

W<br />

to suitably amend the clause.<br />

be seen in this regard.<br />

SFor supply items of tender schedule 75% (Seventy We request 80% as against 75% and a <strong>Tender</strong> Condition remain unchanged.<br />

-five percent) of the value of each consignment shall structure of 80+ 10+5+5.<br />

F be paid on receipt of materials at consignee store<br />

depot and on production of the following documents<br />

62 General Ansaldo T<br />

-<br />

W<br />

S<br />

63 General Ansaldo T<br />

-<br />

W<br />

S<br />

We request you to kindly furnish the Latest<br />

Signalling plans which will be required for<br />

estimation purpose.<br />

What is the LEU architecture currently<br />

planned by WR, is it a centralized,<br />

distributed or a mixed one.<br />

Signalling Roll Plan is being made<br />

part of tender document.<br />

In view of RDSO guidelines ,LEU<br />

shall be centralized in Relay room /<br />

Equipment Room / Relay huts, as far<br />

as possible.<br />

Pre Bid Queries for TPWS 15


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

64<br />

Cl. No.<br />

Chapter-4<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

GGENERAL<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

SCC 4.1<br />

(i) These regulations of tenders and contracts shall The clause specifies the priority between<br />

be read in conjunction with General Conditions of GCC and other documents. The order of<br />

Contract (GCC) with latest amendments, which shall priority within the other documents is not<br />

be subject to modifications, additions or<br />

specified. In our understanding in case of<br />

supersession by these Special Conditions of conflict between Contract<br />

Contract (SCC) and/or specifications/conditions, if documents the decreasing order of priority<br />

any, which is part of this <strong>Tender</strong> <strong>Document</strong>. shall be:<br />

This Para is self explanatory and<br />

should be read in totality.<br />

(ii) Where there is any conflict between these<br />

Special Conditions of Contract on one hand and<br />

Standard Specifications and General Conditions of<br />

Contract of <strong>Western</strong> <strong>Railway</strong> on the other hand, the<br />

former (SCC) shall prevail.<br />

(iii) Any deviations from these Special<br />

Conditions of Contract, Technical Requirement &<br />

Specifications, Schedule of Material & Supplies<br />

and/or any condition of tender document, if any,<br />

stated by the tenderer in his tender or subsequently<br />

introduced by the <strong>Railway</strong> shall be a part of the<br />

Contract only to such extent as have been<br />

explicitly accepted by the <strong>Railway</strong> and<br />

incorporated in the contract.<br />

1. Signed Agreement.<br />

2. Letter of Acceptance (with enclosures<br />

including accepted rates and agreed<br />

deviations) 3.<br />

Special Conditions of Contract 4.<br />

<strong>Tender</strong> <strong>Document</strong> (Chapter I and II ) 5.<br />

Technical Proposal 6.<br />

other documents submitted by Contractor as<br />

per ITT.<br />

7. GCC<br />

8. IRS conditions of Contract Kindly confirm<br />

our above understanding.<br />

Pre Bid Queries for TPWS 16


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

65 Chapter-4 Alstom SCONSIGNEE<br />

SCC 4.7<br />

-(a)<br />

The consignee for this work will be Senior<br />

FSection Engineer (Signal)/Stores/ Valsad for<br />

Mumbai (BCT) Division work & Senior Section<br />

Engineer (Signal)/Stores/ Vadodara for Vadodara<br />

(BRC) Division work for track side equipments and<br />

Signalling material.<br />

(b) The consignee for On Board Equipments will be<br />

Senior Section Engineer /RS / Vadodara (BRCY)&<br />

Senior Section<br />

Engineer /MEMU /Vadodara(BRCY)<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Our understanding is that for SOR items<br />

consignee shall be the Purchaser. For<br />

imported items the Bill of Entry shall be filed<br />

in the name of Purchaser. Please confirm.<br />

Title to the equipment manufactured or<br />

sourced outside India shall pass to the<br />

Purchaser once the equipment passes over<br />

the ship‟s rail / aircraft door in the country of<br />

origin. Kindly confirm. Irrespective<br />

of title to equipment, risk in respect of each<br />

item will pass to the Purchaser on the date<br />

of issue of the Provisional Acceptance<br />

Certificate. Kindly confirm.<br />

This Para is self explanatory and<br />

should be read in totality. All<br />

materials are to be supplied to<br />

nominated consignee along with<br />

relevant inspection and commercial<br />

documents. The contractor will be<br />

responsible for proper up-keep of<br />

equipments supplied and installed till<br />

warranty period is over.<br />

66 Chapter-4<br />

SCC 4.8<br />

Alstom<br />

TTRAINING:<br />

-(i) (a) Training of <strong>Railway</strong> officials at<br />

Wmanufacturer's premises for understanding of<br />

Smanufacturing, and design processes pertaining to<br />

Ehardware & software. This also includes<br />

demonstration of interoperability, operation,<br />

maintenance, data preparation & configuring of<br />

the system at working site as mutually agreed<br />

training program.<br />

We understand that Contractor is<br />

responsible for imparting training of <strong>Railway</strong><br />

Officials only for the purpose of installation,<br />

operation, maintenance and repair of all<br />

equipment. Kindly confirm.<br />

This Para is self explanatory and<br />

should be read in totality. OEM has<br />

to impart required knowledge<br />

mentioned in this Para to different<br />

groups as per requiement of<br />

<strong>Railway</strong>s .<br />

Pre Bid Queries for TPWS 17


66 Chapter-4<br />

SCC 4.8<br />

Alstom<br />

T<br />

-<br />

W<br />

S<br />

We understand that Contractor is<br />

This Para is self explanatory and<br />

responsible for imparting training of <strong>Railway</strong> should be read in totality. OEM has<br />

Officials only for the purpose of installation, to impart required knowledge<br />

mentioned in this Para to different<br />

groups as per requiement of<br />

Original Text Clarification needed<br />

<strong>Railway</strong>s<br />

Clarification<br />

.<br />

of <strong>Western</strong> <strong>Railway</strong><br />

Subject : Pre-bid clarification on E queries received from Industry Participants operation, of maintenance TPWS: Date-30.06.2011<br />

and repair of all<br />

equipment. Kindly confirm.<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

(b) Training of <strong>Railway</strong> personnel/staff at suitable<br />

location over <strong>Western</strong> in software & hardware to<br />

enable installation and maintenance of the<br />

system(ii) <strong>Tender</strong>ers to indicate the adequacy or<br />

otherwise of the duration, place of training, coordination<br />

required, lodging of the trainees etc.. (iii)<br />

The quality of input should be of such a level that at<br />

the end of the training the <strong>Railway</strong> Personnel / staff<br />

should be able to install , commission the<br />

equipment in similar or modified layout, do the<br />

necessary software and hardware changes<br />

required in future the configuration and also<br />

organize, locate and rectify the faults besides<br />

maintenance. They shall be trained in all aspects of<br />

system design, engineering, inspection, testing,<br />

execution, commissioning, fault diagnosis<br />

operation and maintenance of the system as whole<br />

and also all constituent equipments. (iv) The<br />

training should be comprehensive for transfer of<br />

complete know-how so as to impart full knowledge<br />

and competent to independently and successfully<br />

execute the installation, operation, maintenance and<br />

repair of all equipment. The training courses<br />

should, apart from formal class room training,<br />

include hand on practical experience and visits to<br />

working installation. (v) The contractor shall at<br />

every stage of installation; testing and<br />

commissioning shall provide all facilities for<br />

adequate training of <strong>Railway</strong> personnel who may be<br />

deputed to work on the project. (vi) In the event of<br />

any equipment sub-system being manufactured /<br />

assembled in India in technical collaboration with<br />

foreign firm by the tenderer or any of its subcontractor,<br />

approximately half of the training<br />

provided in the schedule shall be arranged at the<br />

collaborator's premises/training centre and the<br />

remaining portion at the working installations. Details<br />

of training proposal shall be submitted by the<br />

contactor for approval of <strong>Railway</strong>s. (vii) Set of<br />

documents related to training in adequate quantity<br />

shall be provided.(viii) The cost of travel to the place<br />

of training and return of <strong>Railway</strong> officials deputed for<br />

training shall be borne by <strong>Railway</strong>s. Cost of training<br />

if any shall be borne by the contractor.<br />

Pre Bid Queries for TPWS 18


epair of all equipment. The training courses<br />

should, apart from formal class room training,<br />

include hand on practical experience and visits to<br />

working installation. (v) The contractor shall at<br />

every stage of installation; testing and<br />

Subject : Pre-bid clarification on commissioning queries received shall provide from all facilities Industry for Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 adequate Virar training (at of <strong>Railway</strong> Km 60)-Vadodara personnel who may (at Km be 397) section<br />

Sr. No. Cl. No. Firm Tdeputed to work on Original the project. Text (vi) In the event of<br />

Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

yany equipment sub-system being manufactured /<br />

passembled in India in technical collaboration with<br />

foreign firm by the tenderer or any of its subcontractor,<br />

approximately half of the training<br />

provided in the schedule shall be arranged at the<br />

collaborator's premises/training centre and the<br />

remaining portion at the working installations. Details<br />

of training proposal shall be submitted by the<br />

contactor for approval of <strong>Railway</strong>s. (vii) Set of<br />

documents related to training in adequate quantity<br />

shall be provided.(viii) The cost of travel to the place<br />

of training and return of <strong>Railway</strong> officials deputed for<br />

training shall be borne by <strong>Railway</strong>s. Cost of training<br />

if any shall be borne by the contractor.<br />

67 Chapter-4<br />

SCC 4.10<br />

Alstom<br />

TLONG TERM AVAILABILITY OF SPARES AND<br />

-SYSTEM SUPPORT<br />

W<br />

(i) The tenderer shall give, in writing along We understand that for long term supply of<br />

S<br />

with the tender, an undertaking that the<br />

spares there will be a separate agreement<br />

E<br />

components / modules as also the main signed with mutually agreed terms and<br />

T<br />

equipment quoted in the schedule requirements conditions and mutually agreed price<br />

-<br />

will be supplied at the same unit rates until the end variation formula. Kindly confirm.<br />

R<br />

of the warranty period and subsequently also at the<br />

D<br />

rates mutually agreed to. The manufacturer shall<br />

S<br />

guarantee that spare parts for the system shall be<br />

O<br />

available for life cycle period (at least 15 years). At<br />

least 3 years notice shall be given to the<br />

<strong>Railway</strong>s before any equipment or components<br />

are discontinued or phased out from the<br />

manufacturing plans. This will enable the <strong>Railway</strong>s<br />

to assess the life time requirement of spares needed<br />

and order in sufficient quantity prior to stoppage of<br />

the manufacture. This condition is to be observed<br />

for ten years after expiry of the warranty period so<br />

that the <strong>Railway</strong> can procure spares for the<br />

components / modules from the suppliers.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

Pre Bid Queries for TPWS 19


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(ii) The tenderer shall undertake to supply on<br />

payment all maintenance spares and tools required<br />

for the equipment during life cycle period. He shall<br />

also undertake to supply additional equipment<br />

required for replacement or expansion of the<br />

network that may become necessary due to<br />

additional traffic requirements at mutually agreed<br />

price.<br />

(iii) The successful tenderer shall further<br />

guarantee that if OEM goes out of production, he<br />

shall supply the specifications of materials at no cost<br />

to the purchaser, if and when required in<br />

connection with the equipment to enable the<br />

purchaser to fabricate or procure from other<br />

sources.<br />

(iv) The supplier (OEM) shall recommend and<br />

provide, prior to the system acceptance, calibration<br />

procedures. The recommendation shall include a<br />

list of the various calibration instruments,<br />

recalibration periods and extent of preventive<br />

maintenance for each test instrument.<br />

68 Chapter-4<br />

SCC 4.13<br />

Alstom<br />

SCONTRACTOLR‘S OFFICE & STORES DEPOT<br />

-The Contractor shall, within a month of issue of<br />

F letter of acceptance of tender, establish an office<br />

Gand store depot at a convenient place for receiving<br />

& storing equipments and materials and<br />

progressing field work expeditiously in consultation<br />

and with the approval of the Engineer-in-charge,<br />

where all correspondence should be sent.<br />

Contractor will intimate office address along with<br />

Telephone/Fax, E-mail and name of Key-personnel<br />

responsible for execution of work. Any<br />

communication sent to the contractor by post at his<br />

said address shall be deemed to have reached the<br />

contractor duly and in time. Important document<br />

shall be sent by Registered post.<br />

Our understanding is that land for office and<br />

stores depot will be made available to<br />

Contractor by Purchaser at convenient<br />

places. Kindly confirm.<br />

This Para is self explanatory and<br />

should be read in totality. Land for<br />

specific use of store may be made<br />

available depending upon availabilty<br />

as per GCC and extant provisions of<br />

WR. However, it can not be<br />

guaranteed.<br />

Pre Bid Queries for TPWS 20


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

69 Chapter-4<br />

SCC 4.16<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Alstom GPERFORMANCE GUARANTEE:<br />

Our understanding is that PG is eligible to be<br />

The procedure for obtaining Performance<br />

Guarantee is outlined below:<br />

(a) The successful bidder shall have to submit a<br />

Performance Guarantee (PG) within 30 (thirty) days<br />

from the date of issue of Letter of Acceptance<br />

(LOA). Extension of time for submission of PG<br />

beyond 30 (thirty) days and up to 60 days from the<br />

date of issue of LOA may be given by the Authority<br />

who is competent to sign the contract agreement.<br />

However, a penal interest of 15% per annum shall<br />

be charged for the delay beyond 30 (thirty) days, i.e.<br />

from 31 st day after the date of issue of LOA. In<br />

case the contractor fails to submit the requisite PG<br />

even after 60 days from the date of issue of LOA,<br />

the contract shall be terminated duly forfeiting EMD<br />

and other dues, if any payable against that contract.<br />

The failed contractor shall be debarred from<br />

participating in re-tender for that work.<br />

released at LoA+18 months subject to<br />

completion of Work and issue of Completion<br />

Certificate or Provisional Acceptance<br />

Certificate. Please confirm.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

(b) The successful bidder shall submit the<br />

Performance Guarantee (PG) in any of the<br />

following forms, amounting to 5% of the contract<br />

value:<br />

(i) A deposit of Cash;<br />

(ii) Irrevocable Bank Guarantee;<br />

(iii) Government Securities including State<br />

Loan Bonds at 5% below the market value;<br />

(iv) Deposit Receipts, Pay Orders, Demand<br />

Drafts and Guarantee Bonds. These forms of<br />

Performance Guarantee could be either of the State<br />

Bank of India or of any of the Nationalized Banks.<br />

(v) Guarantee Bonds executed or Deposits<br />

Receipts tendered by all Scheduled Banks;<br />

(vi)<br />

A Deposit in the Post Office Saving Bank.<br />

(vii) A Deposit in the National Savings<br />

Certificates;<br />

Pre Bid Queries for TPWS 21


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

(viii)<br />

Original Text<br />

Twelve years National Defence Certificates;<br />

Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

(ix) Ten years Defence Deposits;<br />

(x) National Defence Bonds and<br />

(xi) Unit Trust Certificates at 5% below market<br />

value or at the face value whichever is less.<br />

Also, FDR in favour of FA&CAO (free from any<br />

encumbrance) may be accepted.<br />

NOTE: The instruments as listed above will also be<br />

acceptable for Guarantees in case of Mobilization<br />

advance.<br />

(c) The Performance Guarantee shall be submitted<br />

by the successful bidder after the Letter of<br />

Acceptance (LOA) has been issued, but before<br />

signing of the contract agreement. This P.G. shall<br />

be initially valid upto the stipulated date of<br />

completion plus 60 days beyond that. In case,<br />

the time for completion of work gets extended, the<br />

contractor shall get the validity of P.G. extended to<br />

cover such extended time for completion of work<br />

plus 60 days.<br />

(d) The value of PG to be submitted by the<br />

contractor will not change for variation up to 25%<br />

(either increase or decrease). In case during the<br />

course of execution, value of the contract increases<br />

by more than 25% of the original contract value, an<br />

additional Performance Guarantee amounting to<br />

5% (five percent) for the excess value over the<br />

original contract value shall be deposited by the<br />

contractor.<br />

(e) The Performance Guarantee (PG) shall be<br />

released after physical completion of the work<br />

based on „Completion Certificate‟ issued by the<br />

competent authority sitting that the contractor has<br />

completed the work in all respects satisfactorily. The<br />

Security Deposit shall, however, be released only<br />

after expiry of the maintenance period and after<br />

passing the final bill based on „No Claim Certificate‟<br />

from the contractor.<br />

Pre Bid Queries for TPWS 22


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(f) Whenever the contract is rescinded, the<br />

Security Deposit shall be forfeited and the<br />

Performance Guarantee shall be chased. The<br />

balance work shall be got done independently<br />

without risk & cost of the failed contractor. The<br />

failed contractor shall be debarred from participating<br />

in the tender for executing the balance work. If the<br />

failed contractor is a JV or a partnership firm, then<br />

every member / partner of such a firm shall be<br />

debarred from participating in the tender for the<br />

balance work in his / her individual capacity or as a<br />

partner of any other JV / partnership firm.<br />

(g) The engineer shall not make a claim under the<br />

Performance Guarantee except for amounts to<br />

which the President of India is entitled under the<br />

contract (not withstanding and / or without prejudice<br />

to any other provisions in the contract agreement)<br />

in the event of:<br />

i. Failure by the contractor to extend the validity<br />

of the Performance Guarantee as described herein<br />

above, in which event the Engineer may claim the<br />

full amount of the Performance Guarantee.<br />

ii. Failure by the contractor to pay President of<br />

India any amount due,either as agreed by the<br />

contractor or determined under any of theClauses /<br />

Conditions of the Agreement, within 30 days of<br />

theservice of notice to this effect by Engineer.<br />

The Contract being determined or rescinded under<br />

provision ofthe GCC, the Performance Guarantee<br />

shall be forfeited in fulland shall be absolutely at the<br />

disposal of the President of India.<br />

70 Chapter-4<br />

SCC 4.17<br />

Alstom<br />

GPLEA OF CUSTOM<br />

The plea of custom prevailing will not on any<br />

account be permitted as an excuse for an<br />

infringement of any of the conditions of the contract<br />

and/ or special conditions of contract.<br />

We understand that Work shall be executed <strong>Tender</strong> Condition remain unchanged.<br />

as per industry practice and conditions of The work has to executed as per<br />

contract and/or special conditions of contract tender conditions, specification and<br />

shall be read accordingly. Kindly clarify. guidelines of RDSO.<br />

Pre Bid Queries for TPWS 23


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

71<br />

Cl. No.<br />

Chapter-4<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

TSYSTEM PERFORMANCE GUARANTEE We understand that end objective shall be<br />

SCC 4.20.2<br />

-(i) Since the design of the system to achieve the according to technical specification and<br />

Wend objective shall be checked and confirmed by Contractor‟s proposal. Kindly confirm.<br />

Sthe contractor and the supply of the materials will be<br />

E according to this system design, the tenderer shall<br />

Ggive unqualified and unconditional guarantee that<br />

when the equipment supplied by him are<br />

installed and commissioned at site, it shall achieve<br />

the desired objective and that in the event of<br />

performance of the system when installed not<br />

complying with the end objective or with the<br />

specifications, he shall provide further inputs to<br />

enable the <strong>Railway</strong>s to realize the end objectives<br />

with full compliance of the specifications contained<br />

in these documents. No additional payment will be<br />

made to the contractor for supply of any additional<br />

goods and service required in this regard.<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

This Para is self explanatory and<br />

should be read in totality. <strong>Tender</strong><br />

condition remain unchanged.<br />

(ii) This certificate in the pro-forma given in Form<br />

No. 7, shall accompany the offer. Absence of this<br />

certificate which will form part of the agreement shall<br />

disqualify the tenderer automatically.<br />

72 Chapter-4<br />

SCC 4.21<br />

Alstom GPROGRAMME OF WORK EXECUTION<br />

(i) Time is the essence of this contract and time<br />

schedule shall be strictly adhered to. The entire<br />

work as per the Contract will have to be completed<br />

within Eighteen months from the Date of issue of<br />

acceptance letter, on a progressive basis. The<br />

<strong>Tender</strong>er will be responsible for progress of work on<br />

progressive basis from the date of issue of<br />

acceptance letter. Since the progress of the work is<br />

critically related to the supply of material by the<br />

contractor, he will be responsible for supply of duly<br />

inspected Material on a progressive basis, so<br />

that the work can be completed within Eighteen<br />

months progressively.<br />

We understand that Work shall be<br />

completed in phases and Purchaser shall<br />

put to use the Work in phases. Kindly<br />

confirm.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

Pre Bid Queries for TPWS 24


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(ii) Contractor on his part will have to employ<br />

supervisors, technicians and supporting staff in full<br />

strength commensurate with working area available.<br />

He will also arrange required materials and<br />

equipment to complete the job most expeditiously<br />

so as to ensure that the work is completed in phases<br />

within the stipulated period and to the entire<br />

satisfaction of Engineer in- charge.<br />

(iii) The Contractor is expected to have worked out<br />

a detailed programme for execution of the work well<br />

before issue of “Letter of Acceptance”, by <strong>Railway</strong><br />

and submit a Detailed Time and Activity Schedule<br />

within 30 days from issue of LoA , for the execution<br />

of work aiming at completing the entire work within<br />

the stipulated completion time. This schedule shall<br />

thereafter be approved by the Engineer-In-Charge<br />

normally within 5 working days.<br />

(iv) <strong>Railway</strong> reserves the right to modify the<br />

schedule while approving the same as well as at<br />

any stage during execution if situation so warrants.<br />

Once approved, in the event of any slippage from<br />

the time schedule especially when resulting into<br />

time over-run of the work the contractor shall submit<br />

revised schedule duly justifying the circumstances<br />

without any delay. The revised schedule shall be<br />

approved by the Engineer-In-Charge only when<br />

considered justified in his opinion otherwise it may<br />

attract penal action on the contractor as per<br />

provision of this contract.<br />

(v) The Contractor shall be held responsible for the<br />

execution of the work according to the Programme<br />

given for the execution of the work in full<br />

compliance of the approved cable route plans and<br />

also various clauses of technical specification and<br />

requirement. Failure to comply with any of these will<br />

be dealt as per provisions of GCC.<br />

Pre Bid Queries for TPWS 25


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(vi) The contractor will programme his work in such<br />

a manner so as not to interfere in the working and<br />

movement of trains. No extra payment shall be<br />

allowed on this account and for taking any time<br />

precautions or wastage of contractor‟s labour, time<br />

etc. due to train working.<br />

(vii) No facility whatsoever, e.g. provisions of<br />

approach road and provision of temporary level<br />

crossing etc. will be provided by <strong>Railway</strong> for<br />

carting materials. Approach roads within the<br />

<strong>Railway</strong> limits can be used for carting materials.<br />

73 Chapter-4<br />

SCC 4.23 (iv)<br />

Alstom GMATERIALS AND WORKMANSHIP<br />

Please clarify whether RDSO inspection<br />

(i) The materials, to be supplied by the <strong>Tender</strong>er charges shall be borne by Purchaser.<br />

as per RDSO'sSpecification / Drawing will have to<br />

be procured from RDSO approved firms only.<br />

This Para is self explanatory and<br />

should be read in totality. Please<br />

tefer Para 4.22.5 of SCC.<br />

(ii) Materials/ Equipments for which RDSO<br />

approved sources exist should be taken from RDSO<br />

approved Part-I sources only. The Equipment /<br />

Materials from Part-II RDSO approved sources<br />

should be taken only if there are no Part-I sources<br />

approved for the same. Any relaxation with respect<br />

to procurement / inspection shall be with the prior<br />

approval of the competent authority. The<br />

<strong>Railway</strong>s‟ decision shall be final and binding on the<br />

contractor.<br />

(iii) Material should not be procured from any<br />

sources banned for business dealing with <strong>Railway</strong>s<br />

under any circumstances.<br />

(iv) All the IRS / RDSO approved items shall be<br />

procured from RDSO approved firms to IRS/RDSO<br />

specifications and shall be inspected by RDSO. In<br />

case the total value of a particular item is less than<br />

Rs. One lakh, the same shall be inspected by<br />

RITES / Consignee, subject to supplies being from<br />

sources approved by RDSO. However, certain<br />

specified items shall invariably be inspected by<br />

RDSO as per extant policy of Indian <strong>Railway</strong>s:<br />

Pre Bid Queries for TPWS 26


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(v) Material shall be in accordance with<br />

specifications and drawings specified or approved<br />

by the <strong>Railway</strong> with latest amendments.<br />

(vi) Material should be in properly packed condition<br />

and the consignee reserves the right to reject the<br />

material even though it was passed by RDSO/<br />

nominated inspecting authority of <strong>Railway</strong>s.<br />

(vii) All materials that are not covered under the<br />

specification, designs and drawings of RDSO/TEC<br />

etc. shall be procured from the reputed<br />

manufacturers or their authorized dealers. Such<br />

materials are to be approved by the purchaser‟s<br />

Engineer. The Contractor may be required to<br />

furnish manufacturer‟s test certificate along with<br />

manufacturer‟s /supplier‟s guarantee certificate<br />

wherever called for by the Engineer. The <strong>Railway</strong><br />

may also inspect the material again at the<br />

Consignee depot.<br />

(viii) All the materials and workmanship used in<br />

this work shall be of extremely good quality and<br />

high class in every respect and is expected to give<br />

trouble free service.<br />

(ix) The personnel deputed for soldering should<br />

have adequate soldering skills and competency<br />

certificate issued by ITIs / reputed institutions.<br />

(x) Installation of TPWS Equipments and their<br />

commissioning to be carriedout under supervision of<br />

authorized representative of Manufacturer (OEM).<br />

The pre-commissioning check list shall be jointly<br />

signed by representative of OEM, <strong>Railway</strong>s &<br />

Contractor.<br />

Pre Bid Queries for TPWS 27


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

74 Chapter-4 Alstom T(a) Installation: The on board equipment will be We understand that <strong>Railway</strong>‟s Engineer<br />

SCC 4.39<br />

-supplied in three batches as indicated in Para 4.6 of shall issue Provisional Acceptance<br />

Wthe SCC. The installation of the on board equipment certificate for each Phase. Kindly confirm.<br />

Sincluding software loading and required data input<br />

E etc. will be done by the contractor, in the <strong>Railway</strong><br />

Gpremises. Normally this activity will be carried out in<br />

the Loco / MEMU sheds at Vadodara where,<br />

Locomotive / MEMU report back for their normal<br />

maintenance. The installation of the on board<br />

equipment will have to be done during the lie over<br />

period of Loco / MEMU in the car shed along with<br />

the other schedule maintenance activities. If the<br />

time required for installation of on board equipment<br />

and interface to braking system etc., exceeds the lie<br />

over period, the work has to be carried out in one or<br />

more phases. The tenderer should indicate the time<br />

required by him for installation of the on board<br />

equipment in the technical bid. After each phase<br />

the locomotive/MEMU should be in a position to<br />

carry out the normal scheduled performance.<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Para 4.39 is self-explanatary.<br />

<strong>Railway</strong>’s Engineer will issue<br />

Provisional Acceptance certificate as<br />

per tender condition.<br />

(b) Testing and Commissioning: - The on board<br />

equipment installed in the LOCO/MEMU will be<br />

tested in the car shed jointly by the <strong>Railway</strong> and the<br />

contractor as per the Technical Specifications and<br />

the Acceptance Test Schedule furnished by the<br />

contractor and approved by the <strong>Railway</strong>. The test<br />

schedule furnished by the tenderer will be modified<br />

by mutual discussions between the contractor and<br />

the <strong>Railway</strong> before finalization. Any component,<br />

modules, sub-assemblies or equipment failing<br />

during the commissioning test shall be replaced /<br />

repaired free of cost by the tenderer.<br />

All tests and measuring instruments and other<br />

arrangements required for these tests shall be<br />

provided by the contractor at his cost.<br />

Pre Bid Queries for TPWS 28


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

After clearance of the on board equipment installed<br />

for safe working Loco /MEMU and fit for<br />

commercial run, the TPWS system will be made<br />

functional in the concerned Loco / MEMU. After<br />

completion of installation, testing and successful<br />

commissioning of TPWS system in the Loco /<br />

MEMU with the on board supply for each batch (as<br />

per Para 4.6 of SCC) of supplied equipments, a<br />

„Provisional Acceptance Certificate‟ (PAC) will be<br />

issued for that batch of equipments after<br />

observance period of one month.<br />

II. Track Side Equipments & Accessories<br />

(a) Immediately after completion of the work at each<br />

sub-sections (i.e.100 Kms, 100Kms, 140 Kms on<br />

Virar -Vadodara section) or still shorter, the<br />

contractor shall certify and advise the <strong>Railway</strong>s in<br />

writing that the installation is (i) complete, (ii) ready<br />

for satisfactory service and (iii) ready to be handed<br />

over. He will also place at the disposal of the<br />

purchaser the required staff for inspection, testing<br />

and putting it into operation.<br />

(b) The test or tests specified in Technical<br />

specification will be conducted jointly by the<br />

<strong>Railway</strong>s and contractor as soon as possible after<br />

receipt of advice regarding completion of one sub -<br />

section by the contractor. The test schedule shall be<br />

furnished by the contractor which will be modified by<br />

mutual discussion between the contractor and<br />

<strong>Railway</strong> before finalization. Any component,<br />

modules, sub-assemblies or equipment failing<br />

during the commissioning test shall be<br />

replaced/repaired free of cost by contractor.<br />

Pre Bid Queries for TPWS 29


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

(c) <strong>Railway</strong>‟s Engineer shall issue a Provisional<br />

Acceptance certificate for successful installation &<br />

testing of whole system covering all materials and<br />

services included in the Schedule of works &<br />

supplies, after the acceptance test as per the<br />

approved test procedure have been completed and<br />

the performance has been found to meet the<br />

specifications and observance period of one month<br />

is over. <strong>Railway</strong>‟s decision in this respect shall be<br />

final. The Provisional acceptance certificate shall<br />

be signed by both the parties. The equipment<br />

pertaining to this work installed in the section /<br />

station will be under supervision of contractor till<br />

issue of final acceptance certificate as per Para<br />

4.41 below and contractor will provide adequate<br />

know how to <strong>Railway</strong> technician / supervisor for<br />

proper upkeep at maintenance of the system.<br />

(d) Should the results/s of inspection and test be not<br />

satisfactory, an extension of one month will be<br />

granted to the contractor to make good the defects<br />

and deficiencies pointed out by the purchaser.<br />

Fresh inspection and test will then be carried out<br />

after the contractor has attended to the defects and<br />

deficiencies. If these tests are also not<br />

satisfactory, the <strong>Railway</strong>s may proceed at the<br />

contractor‟s expense by the means deemed<br />

expedient, to have the installation made<br />

satisfactory until they comply with the<br />

specifications, and approved drawings and designs.<br />

Pre Bid Queries for TPWS 30


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

75<br />

Cl. No.<br />

Chapter-4<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

TAfter the equipment has been installed, tested &<br />

SCC 4.40.1<br />

-placed in service and Provisional Acceptance<br />

WCertificate issued by <strong>Railway</strong>‟s Engineer, the<br />

Scontractor shall be responsible for proper<br />

E maintenance supervision of the equipment for a<br />

Gperiod of 12 months (Minimum) from the issue of<br />

PAC. For this purpose he shall prepare a<br />

maintenance plan and make available the services<br />

of qualified maintenance engineer stationed the<br />

location approved by <strong>Railway</strong>‟s Engineer who will<br />

guide and supervise the work of <strong>Railway</strong>‟s<br />

maintenance staff. The maintenance engineer of<br />

the contractor will visit Master station and all the<br />

base stations at least twice in a month for regular<br />

upkeep and attend to any fault on the systems<br />

promptly.<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

We understand that the maintenance<br />

engineer shall be provided for 12 months<br />

during normal working hours and under<br />

same working conditions as applicable to the<br />

Purchaser‟s engineers including applicable<br />

leave during the 12 months deployment.<br />

Kindly confirm.<br />

This Para is self explanatory and<br />

complete Para 4.40 should be read.<br />

The required number of comptent<br />

maintenance engineers should be<br />

available round the clock to achieve<br />

reliabilty figures mentioned in<br />

specification and. tender conditions<br />

76 Chapter-4<br />

SCC 4.43<br />

Alstom<br />

TMAINTENANCE OF WORKS<br />

We understand that the Contractor shall do<br />

-The contractor shall at all times during the progress only maintenance supervision during<br />

Wand continuance of the works and also for the Service and Maintenance Supervision<br />

Speriod of maintenance specified in the tender Period and not preventive maintenance.<br />

E document and after the date of passing of the Kindly confirm.<br />

Gcertificate of completion by the <strong>Railway</strong>‟s<br />

representative or any other earlier date subsequent<br />

to the completion of the works that may be fixed by<br />

<strong>Railway</strong>‟s representative be responsible for and<br />

effectively maintain and uphold in good,<br />

substantial, sound and perfect condition all and<br />

every part of the works and shall make good from<br />

time to time and at all times, as often as the<br />

<strong>Railway</strong>‟s representative shall require, any damage<br />

or defect that may during the above period arise in<br />

or be discovered or be in any way connected with<br />

the works, provided that such damage or defect is<br />

not directly caused by errors in the contract<br />

documents, act of providence or instruction or<br />

instruction or civil riot, and the contractor shall be<br />

liable for and shall pay and make good to the<br />

<strong>Railway</strong>s or other person legally entitled thereto<br />

whenever required by the <strong>Railway</strong>‟s<br />

This Para is self explanatory and<br />

should be read in totality. (Please<br />

also refer Para no. 4.40 and 4.44 ).<br />

Peventive maintenece, if required<br />

shoould be also undetaken to<br />

achieve desired relaibilty figures.<br />

Pre Bid Queries for TPWS 31


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

77<br />

Cl. No.<br />

Chapter-4<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

TWARRANTY<br />

SCC 4.44<br />

-The warranty for this tender will be for a period of<br />

WFive Years in lieu of three years as mentioned in<br />

Sclause 12.4 in RDSO Specification number<br />

E RDSO/SPN/183/2011 Version 2<br />

T<br />

-<br />

R<br />

D<br />

S<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Warranty for a period of Five years should be given by the contractor/OEM from the date of issue of Final Acceptance Certificate, which will be considered as date of<br />

Since the essence of the equipment being provided is the reliability & proven- ness for trouble free working at site, the Contractor shall confirm that in case the equipm<br />

O<br />

i.The contractor shall guarantee that all material &<br />

equipment to be supplied and installed as per this<br />

contract shall be free from defect and fault in<br />

design, material, workmanship and manufacture<br />

and shall be of the highest grade and consistent<br />

with established and generally accepted standard for<br />

materials of the type ordered and in full conformity<br />

with the contract specification.<br />

ii.During the period of Warranty the contractor shall<br />

be responsible to the extent expressed in this<br />

clause for any defects that may develop under the<br />

conditions provided for by the contractor and under<br />

proper use, arising from faulty materials, design or<br />

workmanship on the plant or from faulty erection of<br />

the equipments under the supervision of the<br />

contractor, but not to do so by the purchaser who<br />

shall state in writing in what the portion is faulty<br />

iii.This tender shall guarantee that the material/<br />

equipment supplied will continue to conform to the<br />

specification and quality, as covered in this tender,<br />

for a period of Five Years. Final Acceptance<br />

Certificate and this warranty shall survive,<br />

notwithstanding the fact that, the material /<br />

equipment may have been inspected, accepted and<br />

payment therefore made by the <strong>Railway</strong>s.<br />

Our understanding is that if any part of the<br />

works is put in use by the Purchaser before<br />

completion of the entire work then warranty<br />

for such part or Phase of the works shall<br />

cease 5 years from the date on which such<br />

part or Phase was put to use. Kindly confirm<br />

Warranty for a period of Five years<br />

will start from date of commissioning<br />

of complete system and issue of<br />

Final Acceptance Certificate.<br />

Pre Bid Queries for TPWS 32


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

iv. During period of Warranty, the Contractor shall<br />

remain responsible to arrange replacement and for<br />

setting right at his own cost any equipment supplied<br />

by him which is of defective manufacture or<br />

defective design or defective material / component<br />

become unworkable due to any cause whatsoever.<br />

The decision to attend to any damage or defect in<br />

work shall be final and binding on the contractor.<br />

v. If it becomes necessary for the contractor to<br />

replace or renew any defective portions of the<br />

system under this clause, the provision of the above<br />

clauses shall apply to the replaced/renewed<br />

equipment for the period of six month from the date<br />

of such replacement or renewal or until date of<br />

warranty period whichever may be later. If any<br />

defect is not remedied within reasonable time, the<br />

railway may proceed to do the work at<br />

contractor‟s risk and expenses, but without<br />

prejudice to any other rights, which the railway may<br />

have against the contractor in respect of such<br />

defects.<br />

vi.If the replacement or renewals are of such a<br />

character as may affect the efficiency of the<br />

system, the <strong>Railway</strong> shall have the right to give the<br />

contractor within one month from such replacement<br />

or renewal notice in writing that test on completion<br />

will be carried out at his cost. Should such tests<br />

show that the plant sustains the guarantee in the<br />

contract; the cost of the tests shall be borne by the<br />

purchaser. Should the guarantees not be<br />

sustained, the cost of the tests shall be borne by<br />

the contractor.<br />

Pre Bid Queries for TPWS 33


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

vii.Until the completion of work, the contractor shall<br />

have the right to entry with permission of <strong>Railway</strong>s,<br />

at his own risk and representatives, whose names<br />

shall have previously been communicated, in<br />

writing, to the purchaser at all reasonable working<br />

hours upon all necessary parts of the works for the<br />

purpose of inspecting the working and the records<br />

of the plant and taking notes there from and if he<br />

desires at his own risk and expense, making any<br />

tests, subject to he approval of the purchaser which<br />

shall not be unreasonably withheld.<br />

viii. All inspections, replacement or renewals carried<br />

out by the Contractor during the warranty period<br />

shall be subject to the same condition of the<br />

contract.<br />

ix. All replacement and repairs and design change<br />

that the railway shall call upon the contractor to<br />

deliver or perform under this warranty shall be<br />

delivered and performed by the contractor within<br />

one month, promptly and satisfactorily.<br />

x. The decision of the <strong>Railway</strong> in regard to<br />

contractor‟s liability and the amount, if any, payable<br />

under this warranty shall be final and conclusive.<br />

xi. Due to analysis of failures, if any design<br />

deficiency is pointed out by the <strong>Railway</strong>, the<br />

contractor shall rectify it at his own cost.<br />

78 Chapter-4<br />

SCC 4.44 (x)<br />

Alstom<br />

Gx. The decision of the <strong>Railway</strong> in regard to We understand that any dispute arising<br />

contractor‟s liability and the amount, if any, payable under this Contract shall be subject to<br />

under this warranty shall be final and conclusive. settlement of dispute and arbitration clause.<br />

Kindly clarify.<br />

This Para is self explanatory and<br />

should be read in totality. However,<br />

Please refer Para 4.64 regarding<br />

settlement of disputes under this<br />

contract.<br />

Pre Bid Queries for TPWS 34


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

79<br />

Cl. No.<br />

Chapter-4<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

TWARRANTY MAINTENANCE<br />

SCC 4.44.1<br />

-Fault rectification and regular preventive<br />

Wmaintenance of the total installation is to be done by<br />

Sthe contractor within the warranty period of Five<br />

EYears under warranty maintenance. During this<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

period, the system availability of complete TPWS<br />

should be comparable to requirement of<br />

specification. The normal day- to-day operations and<br />

diagnosis to the extent possible will be done by the<br />

<strong>Railway</strong>, based on the guidelines provided by the<br />

supplier.<br />

Our understanding is that during warranty<br />

period Purchaser‟s maintenance staff shall<br />

carry out regular maintenance work as per<br />

maintenance plan and maintenance<br />

manuals. Regular maintenance is not in<br />

Contractor‟s scope. Corrective maintenance,<br />

not including the above, and requested in<br />

writing by Purchaser, shall be done by<br />

Contractor. Kindly confirm.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

OEM/contracor has to undetake<br />

adequate measures to achieve<br />

desired relaibilty figures in<br />

complaice tender conditions and<br />

specification.<br />

For this purpose contractor shall prepare a maintenance plan and make available the services of qualified maintenance engineer stationed at the locations<br />

The contractor shall inform names of qualified Service Engineers deputed at the location approved by <strong>Railway</strong>‟s Engineer and their contact numbers, so that they ca<br />

The contractor shall also submit the proposal<br />

specifying the man power deployment for fault<br />

control centre location and other details as to how<br />

the bidder proposes for carrying out the proper<br />

repairs under warranty maintenance. He shall<br />

also indicate what spares will be kept in different<br />

locations. The infrastructure planned to be created<br />

by the bidder to his obligations under warranty<br />

maintenance and his action plan to deal with the<br />

various situations arising out of hardware and<br />

software fault shall be clearly indicated.<br />

80 Chapter-4<br />

SCC 4.46.(vi)<br />

Alstom GAs for as SOR items are concerned, the limit of 25%<br />

would apply to the value of SOR schedule as a<br />

whole and not on individual SOR items. However,<br />

in case of NS items, the limit of 25% would apply on<br />

the individual items irrespective of the manner of<br />

quoting the rate (single percentage rte or individual<br />

item rate).<br />

Our understanding is that the quantity<br />

variation limit of 25% applies to the total<br />

value of the contract and not to any<br />

individual SOR item. Please clarify<br />

This Para is self explanatory and<br />

should be read in totality. All items<br />

may be trated as NS items, and<br />

relevant para in this regard will be<br />

applicable.<br />

Pre Bid Queries for TPWS 35


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

81<br />

Cl. No.<br />

Chapter-4<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

SSYSTEM OF QUOATING RATES<br />

SCC 4.53<br />

-The prices quoted by the <strong>Tender</strong>er shall include the<br />

F prices of materials including all incidental charges<br />

Gfor transport, loading/unloading and handling of<br />

materials, cost for arranging dispatch by rail/road<br />

direct from manufacturer‟s premises and<br />

completing all necessary formalities in all respect.<br />

The breakup of the basic cost and other taxes<br />

and duties shall be positively submitted.<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

The prices shall include all taxes, duties, Royalty<br />

land levies (including Octroi etc.) applicable to this<br />

Works Contract. Therefore, they should quote<br />

their prices taking into account the rate of sales tax<br />

as leviable in the event of sale to the Central<br />

Government Organization etc. It is clarified that<br />

required form applicable for this purpose will be<br />

supplied to the contractor, as applicable in the state<br />

where the contract is being executed. The prices<br />

shall also include provision for losses and wastage<br />

in transit and installation and commissioning. The<br />

prices quoted by the tenderer shall include cost of<br />

commissioning and testing and all costs of<br />

Administration of Contract, Insurance, Premium<br />

banker‟s charges for guarantees, cost of storage,<br />

loading-unloading and handling of materials and for<br />

any road transport which the contractor may use or<br />

carriage of materials to his depot and the site of<br />

work. The prices shall include the cost of works<br />

and adjustments necessary to be done by the<br />

contractor during or after test carried out by the<br />

purchaser.<br />

We understand that change in law, statute,<br />

tax rate etc. coming into effect after the date<br />

for submission of tender. Our understanding<br />

is that any increase/decrease in cost on<br />

account of any change in law statute, tax<br />

rate etc. or introduction of any new law,<br />

statute, tax etc. after the submission of<br />

tender shall be passed on to the Purchaser.<br />

Contractor shall provide documentary<br />

evidence of the increase or decrease to<br />

Purchaser.<br />

This Para is self explanatory and<br />

should be read in totality & <strong>Tender</strong><br />

Condition remain unchanged. Please<br />

also refer Para 4.59 of SCC.<br />

The price to be quoted by the tenderer should take into account the credit availed on inputs under the MODVAT. The tenderer should give a declaration that any let o<br />

While the price quoted in the contract are inclusive of all taxes i.e. custom duty, excise duty, octroi, local levies, Sales tax levied by any statutory authority, the purcha<br />

All taxes, duties and levies (Including octroi etc.) arising out of the transaction between the contractor and his sub contractor/supplier for this work will be included in th<br />

Arrangement of permits/license for materials will not be made by the <strong>Railway</strong> or any assistance given. The Contractor will have to make his own arrangement. Also no<br />

Pre Bid Queries for TPWS 36


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

The Unit prices offered against the various items in<br />

schedules will include beside labour the following<br />

elements of cost:-<br />

(i) Cost of all materials required for preparing the<br />

cable routes, laying the cables and all other<br />

incidentals connected therewith excluding the<br />

materials supplied by the <strong>Railway</strong>s.<br />

(ii) Special tools & installation materials for TPWS<br />

equipments, racks, wiring etc.<br />

(iii) Cost of transportation of material, supplied by<br />

the <strong>Railway</strong> from place of delivery to the site of work.<br />

(iv) Return of released materials, left over cables<br />

and other materials from the site of work and<br />

handing over to the Engineer at specified locations<br />

or stores depot.<br />

(v) Cost of preparation of detailed<br />

documentation completion plans/drawings.<br />

(vi) All other miscellaneous expenses necessary for<br />

the execution of work and fulfillment of contractual<br />

obligation.<br />

82 Chapter-4<br />

SCC 4.64<br />

Alstom<br />

GSETTLEMENT OF DISPUTES<br />

Arbitration & conciliation ordinance 1996 /<br />

Arbitration Act, 1996 with latest circular or<br />

corrigendum will be valid for this tender.<br />

We suggest disputes be settled by<br />

arbitration under the Rules of Arbitration of<br />

the International Chamber of Commerce by<br />

three arbitrators appointed in accordance<br />

with the said Rules. And the place of<br />

arbitration should be neutral venue. We<br />

propose Singapore or London.<br />

<strong>Tender</strong> Condition remain<br />

unchanged.<br />

The successful tenderer/s shall put up his/their<br />

claim as per clause 43 of the General Conditions of<br />

The provision of Clauses 63 & 64 to the General<br />

Condition of Contract will be applicable only for<br />

settlement of claims or disputes between the parties<br />

for values less than or equal to 20% of the value of<br />

the contract, and when claim or disputes are of<br />

value more than 20% of the contract, provision of<br />

Clauses 63 & 64 and other relevant clauses of the<br />

General Conditions of Contract will not be<br />

applicable and arbitration will not be a remedy for<br />

settlement of such disputes.<br />

Pre Bid Queries for TPWS 37


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

The contractor shall not be entitled to ask for<br />

reference to arbitration, before the completion of the<br />

work assigned to him / them under this contract. The<br />

contractor/s shall seek reference to arbitration to<br />

settle disputes only once within the ambit of above<br />

condition.<br />

If any dispute arises between the parties with<br />

respect to this agreement any application or suite<br />

shall be instituted only in the court with local unit of<br />

whose jurisdiction the <strong>Western</strong> <strong>Railway</strong> HQ office is<br />

situated and both the parties shall be bound by this<br />

clause.<br />

Relevant provisions of GCC in this regard as under:<br />

GCC Clause 63 :Matters finally determined by the<br />

<strong>Railway</strong>:-All disputes and differences of any kind<br />

whatsoever arising out of or in connection with the<br />

contract, whether during the progress of the work or<br />

after its completion and whether before or after the<br />

determination of the contract shall be referred by the<br />

Contractor to the <strong>Railway</strong> and the <strong>Railway</strong> shall<br />

within 120 days after receipt of the Contractor's<br />

representation make and notify decisions on all<br />

matters referred to by the contractor in writing<br />

provided that matters for which provisions has been<br />

made in Clause 8, 18, 22(5), 39, 43(2), 45(a), 55,<br />

55-A(5), 57, 57-A, 61(1), 61(2) and 62(i) to (xiii)(B)<br />

of the General Conditions of Contract or in any<br />

clause of the Special Conditions of Contract shall<br />

be deemed as “excepted matters” and the decisions<br />

of the <strong>Railway</strong> authority, thereon shall be final and<br />

binding on the Contractor provided further that<br />

“excepted matters” shall stand specifically excluded<br />

from the purview of the arbitration clause and not be<br />

referred to Arbitration.<br />

GCC Clause 64:<br />

Pre Bid Queries for TPWS 38


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

64.(1)(i) Demand for Arbitration: In the event of any<br />

dispute or difference between the parties here to as<br />

to the construction or operation of this contract, or<br />

the respective rights and liabilities of the parties on<br />

any matter in question, dispute or difference on any<br />

account or as to the withholding by the <strong>Railway</strong> of<br />

any certificate to which the contractor may claim to<br />

be entitled to, or if the <strong>Railway</strong> fails to make a<br />

decision within 120 days, then and in any such<br />

case, but except in any of the “excepted matters”<br />

referred to in clause 63 of these conditions, the<br />

contractor, after 120 days but within 180 days of his<br />

presenting his final claim on disputed matters, shall<br />

demand in writing that the dispute or difference be<br />

referred to arbitration.<br />

64.(1)(ii) The demand for arbitration shall specify the<br />

matters, which are in question or subject of the<br />

dispute or difference as also the amount of claim<br />

itemwise. Only such dispute(s) or difference(s) in<br />

respect of which the demand has been made,<br />

together with counter claims or set off shall be<br />

referred to arbitration and other matters shall not be<br />

included in the reference.<br />

64.(1)(ii)(A) The Arbitration proceedings shall be<br />

assumed to have commenced from the day a<br />

written and valid demand for arbitration is received<br />

by the <strong>Railway</strong>.<br />

64.(1)(ii)(B) The claimant shall submit his claim<br />

stating the facts supporting the claims alongwith all<br />

relevant documents and the relief or remedy sought<br />

against each claim within a period of 30 days from<br />

the date of appointment of the Arbitral Tribunal.<br />

64.(1)(ii)(C) The <strong>Railway</strong> shall submit its defence<br />

statement and counter claim(s), if any, within a<br />

period of 60 days of receipt of copy of claims from<br />

Tribunal thereafter, unless otherwise extension has<br />

been granted by Tribunal.<br />

Pre Bid Queries for TPWS 39


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

64.(1)(iii) No new claim shall be added during<br />

proceedings by either party. However, a party may<br />

amend or supplement the original claim or defence<br />

thereof during the course of arbitration proceedings<br />

subject to acceptance by Tribunal having due<br />

regard to the delay in making it.<br />

64.(1)(iv)If the contractor(s) does/do not prefer<br />

his/their specific and final claims in writing, within a<br />

period of 90 days of receiving the intimation from the<br />

<strong>Railway</strong>s that the final bill is ready for payment,<br />

he/they will be deemed to have waived his/their<br />

claim(s) and the <strong>Railway</strong> shall be discharged and<br />

released of all liabilities under the contract in respect<br />

of these claims.<br />

64.(2) Obligation during pendancy of arbitration :-<br />

Work under the contact shall, unless otherwise<br />

directed by the Engineer, continue during the<br />

arbitration proceedings, and no payment due or<br />

payable by the <strong>Railway</strong> shall be withheld on<br />

account of such proceedings, provided, however, it<br />

shall be open for Arbitral Tribunal to consider and<br />

decide whether or not such work should continue<br />

during arbitration proceedings. 64.(3)(a)(i) In cases<br />

where the total value of all claims in question added<br />

together does not exceed Rs.10,00,000/-(Rupees<br />

Ten Lakhs only), the<br />

Pre Bid Queries for TPWS 40


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

Arbitral Tribunal consist of a sole arbitrator who shall<br />

be either the General Manager or a gazetted officer<br />

of <strong>Railway</strong> not below the grade of JA grade<br />

nominated by the General Manager in that behalf.<br />

The sole arbitrator shall be appointed within 60<br />

days from the day when a written and valid demand<br />

for arbitration is received by <strong>Railway</strong>. 64.(3)(a)(ii)In<br />

cases not covered by clause 64(3)(a)(i), the Arbitral<br />

Tribunal shall consist of a panel of three Gazetted<br />

<strong>Railway</strong> officers not below JA grade, as the<br />

arbitrators. For this purpose, the <strong>Railway</strong> will send a<br />

panel of more than 3 names of Gazetted <strong>Railway</strong><br />

Officers of one or more departments, of the <strong>Railway</strong><br />

to the contractor who will be asked to suggest to<br />

General Manager upto 2 names out of the panel for<br />

appointment as contractor‟s nominee. The<br />

General Manager shall appoint at least one out of<br />

them as the contractor‟s nominee and will, also<br />

simultaneously appoint the balance number of<br />

arbitrators either from the panel or from outside the<br />

panel, duly indicating the presiding arbitrator from<br />

amongst the 3 arbitrators so appointed. While<br />

nominating the arbitrators it will be necessary to<br />

ensure that one of them is from the Accounts<br />

department. An officer of Selection Grade of the<br />

64.(3)(a)(iii)If one or more of the arbitrators<br />

appointed as above refuses to act as arbitrator, or<br />

withdraws from his office as arbitrator, or vacates<br />

his/their office/offices or is/are unable or unwilling to<br />

perform his functions as arbitrator for any reason<br />

whatsoever or dies or in the opinion of the General<br />

Manager fails to act without undue delay, the<br />

General Manager shall appoint new<br />

arbitrator/arbitrators to act in his/their place in the<br />

same manner in which the earlier<br />

arbitrator/arbitrators had been appointed. Such<br />

reconstituted Tribunal may, at its discretion,<br />

proceed with the reference from the stage at which<br />

it was left by the previous arbitrator(s).<br />

Pre Bid Queries for TPWS 41


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

64.(3)(a)(iv) The Arbitral Tribunal shall have power<br />

to call for such evidence by way of affidavits or<br />

otherwise as the Arbitral Tribunal shall think proper,<br />

and it shall be the duty of the parties hereto to do or<br />

cause to be done all such things as may be<br />

necessary to enable the Arbitral Tribunal to make<br />

the award without any delay.<br />

64.(3)(a)(v) While appointing arbitrator(s) under subclause<br />

(i), (ii) and (iii) above, due care shall be<br />

taken that he/they is/are not the one/those who had<br />

an opportunity to deal with the matters to which the<br />

contract relates or who in the course of his/their<br />

duties as <strong>Railway</strong> servant(s) expressed views on<br />

all or any of the maters under disputes or<br />

differences. The proceedings of the Arbitral<br />

Tribunal or the award made by the such Tribunal<br />

will, however, not be invalid merely for the reason<br />

that one or more arbitrator had, in the course of his<br />

service, opportunity to deal with the matters to which<br />

the contract relates or who in the course of his/their<br />

duties expressed view on all or any of the matters<br />

under dispute.<br />

64.(3)(b)(i) The arbitral award shall state itemwise,<br />

the sum and reasons upon which it is based.<br />

64.(3)(b)(ii)A party may apply for corrections of any<br />

computational errors, any typographical or clerical<br />

errors or any other error of similar nature occurring<br />

in the award and interpretation of a specific point of<br />

award to tribunal within 30 days of receipt of the<br />

award. 64.(3)(b)(iii) A party may apply to tribunal<br />

within 30 days of receipt of award to make an<br />

additional award as to claims presented in the<br />

arbitral proceeding but omitted from the arbitral<br />

award.<br />

64.(4)In case of the Tribunal, comprising of three<br />

members, any ruling or award shall be made by a<br />

majority of Members of Tribunal. In the absence of<br />

such a majority, the views of the Presiding<br />

Arbitrator shall prevail.<br />

Pre Bid Queries for TPWS 42


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

64.(5) Where the arbitral award is for the payment of<br />

money, no interest shall be payable on whole or any<br />

part of the money for any period till the date on<br />

which the award is made.<br />

64.(6) The cost of arbitration shall be borne by the<br />

respective parties. The cost shall interalia include<br />

fee of the arbitrator(s) as per the rates fixed by the<br />

<strong>Railway</strong> Administration from time to time.<br />

64.(7) Subject to the provisions of the aforesaid<br />

Arbitration and Conciliation Act 1996 and the rules<br />

there under and any statutory modification thereof<br />

shall apply to the arbitration proceedings under this<br />

clause.<br />

83 GENERAL 1 Alstom T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

84 Chapter 6 Alstom<br />

A.4.16 and B.5<br />

TSchedule of works and supplies:<br />

-Supply of hand held maintenance tools for testing<br />

Rthe line side equipments in entire section<br />

D<br />

S<br />

O<br />

Considering the short time for completion of<br />

work we propose that a maximum of 10<br />

calendar days shall be taken for<br />

review/approval of documents by<br />

Purchaser/Purchaser representative/RDSO<br />

etc. In case no comments are received<br />

within 10 working days of submission of<br />

documents, the document shall be deemed<br />

to be approved. Kindly confirm.<br />

Could you please confirm this equipment<br />

shall be able for the Balise equipment to :<br />

1) Program the data 2)<br />

Read the data through the air-gap as a train<br />

emulation<br />

3) Test<br />

the LEU interface<br />

Thus the<br />

testing equipment to deliver is not only the<br />

operating hand held terminal, but also the<br />

associated electronic case allowing to<br />

perform the above functions at the related<br />

interfaces<br />

<strong>Tender</strong> Condition remain unchanged.<br />

The tenderer/OEM should submit all<br />

the necessary document/information<br />

required in one-go as per extant<br />

practice of RDSO and UNISIG in<br />

order to expedite the approval<br />

process in a reasonable time frame.<br />

The General requirement is being<br />

incorportaed in Chapter-5 of tender<br />

document. The equipment should<br />

consists of all the hardware and<br />

software required and it should be<br />

able to perform folowing functions,<br />

which are required to be seen at site<br />

and viewed at remote location<br />

through open protocol : (a) Program<br />

the data (b) Read the data through<br />

the air-gap as a train emulation (c)<br />

provide diagnostic data of LEU &<br />

BALISE (d) Test the LEU interface.<br />

Pre Bid Queries for TPWS 43


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

85<br />

Cl. No.<br />

Chapter 6<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

TSchedule of works and supplies:<br />

A.4.16 and B.5<br />

-Supply of hand held maintenance tools for testing<br />

Rthe line side equipments in entire section<br />

D<br />

S<br />

O<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Could you please confirm this equipment The remark is same as above, being<br />

shall be able for the LEU equipment to : a repition<br />

1) Program the data 2)<br />

Read the data at the balise outputs<br />

(performing as a balise emulation) 3)<br />

Up-load the log file for diagnose and<br />

mainenance<br />

Thus<br />

the testing equipment to deliver is not only<br />

the operating hand held terminal, but also<br />

the associated electronic case allowing to<br />

perform the above functions at the related<br />

interfaces.<br />

86 Chapter 5 5.1<br />

clause<br />

14.0(m)<br />

Alstom<br />

Tschedule of works and supplies:<br />

-<br />

R<br />

D<br />

S<br />

O<br />

Would you please confirm the JRU to be<br />

provided shall be mandatory quoted in<br />

seperated lines the chapter 6 "schedule of<br />

works and supplies" i.e on A.1.9 (for onboard<br />

part) and A.4.18 (Testing facility) and<br />

A.5.10 (Essential spares)<br />

As per RDSO guideline 10%<br />

Locomotives/ MEMU are to be<br />

covered. The schedule is being<br />

modified to incorporate these<br />

guidelines.<br />

87 Chapter 5 5.1<br />

clause<br />

14.0(m)<br />

Alstom<br />

TRequirement of Juridical Recording Unit (JRU) in<br />

-terms of Clause 4.1 (ii) (b)<br />

R<br />

D<br />

S<br />

O<br />

Would you please confirm the JRU shall be The JRU to supplied against this<br />

provided with hazard protected juridical tender should conform to RDSO and<br />

memory unit so called anti-crash protected CENELEC / UNISIG specification with<br />

memory module <br />

anti-crash protected memory<br />

And the associated tool (testing equipments module. The associated tool (testing<br />

along with diagnostic software for<br />

equipments along with diagnostic<br />

maintenance of Train Borne TPWS software for maintenance of Train<br />

equipment) shall be able to read this external Borne TPWS equipment) shall be<br />

module<br />

able to read this external module<br />

88 Chapter 4<br />

4.3.2 (X) and<br />

Chapter 6<br />

A4.17<br />

Alstom<br />

TCONTRACTOR‘S SCOPE OF WORK "This<br />

-activity also involves renovation of space provided<br />

Wby <strong>Railway</strong>s, for installation of test /simulation set-<br />

Chapter 6 A4.17 "Renovation and simulation<br />

Sup."<br />

Eset up as per engineer in Charge"<br />

Would you please provide details on the <strong>Railway</strong> will provide space with 230 V<br />

three spaces at Electric Loco /MEMU Shed / ,AC power supply.<br />

simulation /Training centre (Vadodara)and<br />

training school / repair center at Valsad) :<br />

- Location, surface, state of the space (wall<br />

existing power supply available, lighting,<br />

furniture...<br />

- the<br />

expected work of the renovation<br />

89 Chapter 4<br />

SCC 4.6<br />

Alstom GCompletion Period We request to kindly modify the completion<br />

period as 24 months.<br />

The completion period for this is 18<br />

months. However, any change in this<br />

regard will be notified, subsequently.<br />

Pre Bid Queries for TPWS 44


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

90 Chapter 5 5.1<br />

14.0(j)<br />

Alstom<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

TTechnical Specification of Train Protection &<br />

-Warning System<br />

W<br />

S<br />

E<br />

Considering WR choice 14.0(i) for DMI For CENELEC- DMI, the 8 position<br />

CENELEC, the "8 position switch" is not switch is not required, necessary<br />

anymore requested by the RDSO<br />

amendment in this regard will be<br />

specification v2 as it is only applicable for issued.<br />

the simplified DMI as per the clause 6.18.1.1<br />

(vi).<br />

Please<br />

confirm the "8 position switch" request is<br />

removed<br />

91 Chapter 5 5.1<br />

14.0(k) b<br />

Alstom<br />

TTechnical Specification of Train Protection &<br />

-Warning System<br />

W<br />

E<br />

T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

Could you please detail for each<br />

Locomotives of the same family WAP-4 and<br />

EMU characteristic are the same (i.e. Is<br />

there 3 different types in Locomotive WAP4<br />

itself),<br />

If any differences in the<br />

same Locomotive WAP4 and EMU then<br />

please specify precisely types and numbers<br />

of locos and EMUs (i.e. with SIV, with<br />

ARNO converter, Crew friendly or not…)<br />

and related brake system.<br />

The WAP4 Locomotives are<br />

generally of two types: (i) with SIV<br />

and (ii) with ARNO converter. Please<br />

see annexure-4 (page139) of tender<br />

document. In order to get more<br />

acquaintance, tenderer may do site<br />

visit at Electric Locomotive shed/<br />

Vadodrara and MEMU<br />

shed/Vadodrara with prior<br />

permission.<br />

92 4.3.2 (VI)<br />

(Page-41)<br />

Bombardier<br />

TThere shall be sufficient space inside LEU cabinet<br />

-for installation of relays (ECRs), if required for<br />

Winterface of signalling system with LEU.<br />

S<br />

Please confirm additional ECR's if required<br />

will be supplied by <strong>Railway</strong>s or these are<br />

covered under Schedule item D12.1 &<br />

D12.2.<br />

Item covered under Schedule item<br />

D12.1 & D12.2.<br />

93 4.3.2 (VII)<br />

(Page-41)<br />

Bombardier<br />

TIn case of distributed assets, Contactor............for<br />

-LEUs may be taken from 110 V or 230 V AC power<br />

Wsupply arrangement.<br />

S<br />

What is meant by distributed assest Please<br />

inform the number of distributed assests and<br />

also confirm that in case distributed assests<br />

have 230V AC, then <strong>Railway</strong>s will provide<br />

230/110V AC step down transformer or this<br />

item is already covered under schedule item<br />

D13.<br />

Also, we understand that power cable will be<br />

provided by <strong>Railway</strong>s. Please confirm.<br />

This Para is self explanatory. The<br />

distributed asset is any thing which<br />

is outside relay room/ realy hut/ autohut.<br />

<strong>Railway</strong> will provide 230volt or<br />

110 volt AC. The step down<br />

transformers are covered in under<br />

Schedule.<br />

94 4.3.3 (iv)<br />

(Page-42)<br />

Bombardier<br />

TProvision of one potential free contact for each<br />

-signal aspect including calling on "A"/"G" marker in<br />

WRelay Room/Relay Hut.<br />

S<br />

If LEU is not in same location as ECR then it<br />

is required to lay cable from ECR to the LEU<br />

location, the cable shall be laid by contractor<br />

and the cable will be supplied by <strong>Railway</strong>s.<br />

Please let us know whether our<br />

understanding is correct.<br />

Data cable will be supplied by the<br />

<strong>Tender</strong>er as per quantity give in the<br />

schedule. Signalling and Power<br />

Cable if required will be supplied by<br />

<strong>Railway</strong>s.<br />

Pre Bid Queries for TPWS 45


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

95 4.5<br />

Cl. No.<br />

(Page-<br />

Firm<br />

Bombardier<br />

T<br />

y<br />

p<br />

TTECHNICAL DOCUMENTS TO BE PROVIDED<br />

43)<br />

-Only P.way Plan………….braking curve estimation.<br />

W<br />

E<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

We understand that <strong>Railway</strong>s will also<br />

provide the details of the Locomotive and<br />

MEMU after award of contract as per<br />

Chapter 5 Clause 5.1 point No. 14.0(n) (vii).<br />

Please confirm the same<br />

This Para is self explanatory and<br />

should be read in totality.<br />

96 4.20<br />

(Page-53)<br />

Bombardier<br />

TPROTOTYPE TESTING<br />

-Manufacturer shall carry out acceptance tests on<br />

Wequipments to be installed for functional acceptance<br />

Stest. One set of onboard system on one locomotive<br />

Eand MEMU each with MMI confirming to<br />

UIC/UNISIG Specification……………...These will<br />

be shipped to the consignee only after the<br />

inspecting official issues a clear and unequivocal<br />

inspection certificate.<br />

We understand that the quantities required<br />

for Prototype Testing are already covered in<br />

the Schedule.<br />

Also, please confirm that the environmental<br />

tests will only be done on the equipment<br />

supplied for prototype testing.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

97 4.20.1<br />

(Page-53)<br />

98 4.3.2 ( XIII)<br />

(Page-42)<br />

100 5.1<br />

Table Clause<br />

No. 14.0©<br />

(Page-89)<br />

101 5.1<br />

Table Clause<br />

No. 14.0(j)<br />

(Page-90)<br />

Bombardier<br />

Bombardier<br />

Bombardier<br />

Bombardier<br />

TTHE FUNCTIONAL ACCEPTANCE TESTS<br />

-Based on satisfactory performance of Functional<br />

WAcceptance Tests for stipulated system-months,<br />

SRDSO/purchaser shall undertake acceptance tests<br />

E on balance equipments/ systems.<br />

T<br />

-<br />

R<br />

TWarranty period - 5 years<br />

-<br />

W<br />

S<br />

E<br />

F<br />

TType of signals where TPWS is to be installed.<br />

-<br />

W<br />

S<br />

TWhether 8 position switch is required in terms of<br />

-Clause 6.18.<br />

W<br />

S<br />

E<br />

Please let us know the actual system<br />

months in lieu "Stipulated System-months".<br />

We request <strong>Western</strong> <strong>Railway</strong> to consider the<br />

warranty period to be in line with RDSO<br />

specification for TPWS, i.e. 3 years<br />

We understand this tender calls for TPWS<br />

only for Automatic Signalling sections and<br />

does not involve any Yards/ Station Areas.<br />

Please confirm.<br />

As per RDSO Specification clause 6.18.2<br />

which lists details of CENELEC DMI does<br />

not include 8 position switch. Hence, it is<br />

requested that the requirement shall be<br />

removed. As it is part of SDMI and not<br />

CENELEC DMI.<br />

please refer clause 9.7 of<br />

RDSO/SPN/183/2011 VER 2 or latest.<br />

The system-month appllicable in this<br />

Para will be mutually decided by<br />

RDSO, Contractor and <strong>Railway</strong>s<br />

based on experince during the Trial<br />

of Protoype type system.<br />

<strong>Tender</strong> Condition remain<br />

unchanged.<br />

Signals involved are both is i.e<br />

Station & Automatic Signalling.<br />

For CENELEC- DMI, the 8 position<br />

switch is not required, Necessary<br />

amendment in this regard will be<br />

issued.<br />

Pre Bid Queries for TPWS 46


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

102<br />

Cl. No.<br />

5.3 (xi)<br />

Firm<br />

Bombardier<br />

T<br />

y<br />

p<br />

TDeflector or Protection Cover to be provided for<br />

(Page-92)<br />

-protection of balise shall be painted with luminous<br />

Wpaint & Nut bolt provided shall be provided with lock<br />

S seal to avoid them getting loose with train<br />

Tmovements.<br />

103 5.4.11<br />

(Page-96)<br />

104 B1.2 (Page-<br />

101)<br />

105 B2.1<br />

(Page-101)<br />

106 B4.3<br />

(Page-102)<br />

107 D15.1<br />

(Page-107)<br />

108 Annx-4 (Page- Bombardier<br />

139)<br />

-<br />

Bombardier TPlacing of cable markers.<br />

-<br />

W<br />

S<br />

Bombardier TLEU Line side Cabinet.<br />

-<br />

W<br />

S<br />

T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

Bombardier TProposed Quantities of various types of<br />

-Eurobalise(s) (switchable, infill, repositioning) should<br />

Wbe submitted by tenderer as per Signalling plans.<br />

S<br />

Bombardier TEurobalise of sorts<br />

-<br />

W<br />

Bombardier<br />

S<br />

TSupply of Apparatus Case Single NE Rly as per Drg<br />

-No. W. RLY/SW/47/68 with two nos E type Lock<br />

W<br />

S<br />

TTENTATIVE SPACE FOR ON-BOARD<br />

-EQUIPMENT OF TPWS ON WAP4 ELECTRIC<br />

WLOCOMOTIVE<br />

E<br />

T<br />

-<br />

R<br />

D<br />

S<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Please clarify what is meant by Deflector or<br />

protection cover. As normally there is no<br />

deflector or protection cover to be provided<br />

for balise.<br />

We understand that the cable markers will<br />

be supplied by <strong>Railway</strong>s. Please confirm. If it<br />

is to be supplied by Contractor, please<br />

supply drawing or details of the same.<br />

We understand that <strong>Railway</strong>s intend for<br />

decentralized LEU for the TPWS. Please let<br />

us know whether our understanding is<br />

correct. Please provide drawings / details of<br />

LEU Line side Cabinet to be supplied.<br />

Also please confirm that each Line side<br />

cabinet will house a single LEU.<br />

We understand that the proposed quantities<br />

of different type of Eurobalises are to be<br />

submitted after award of contract and after<br />

receipt of the signalling plans from <strong>Railway</strong>s.<br />

Please confirm.<br />

Please let us know quantities of various type<br />

of eurobalise.<br />

This Para applicable only if<br />

Deflector or Protection Cover are<br />

being provided for protection of<br />

balises. Necessary amendment in<br />

this regard will be issued.<br />

Cable markers will be supplied by<br />

<strong>Tender</strong>er as per Schedule Item no D-<br />

11.<br />

LEU shall be centrallised in Relay<br />

room / Equipment Room / Relay<br />

huts, as far as possible.<br />

<strong>Tender</strong>er has to quote as per<br />

quantities mentined in tender<br />

schedule. However, the break-up of<br />

proposed quantities of different type<br />

of Eurobalises (switchable, infill,<br />

repositioning) should also be<br />

submitted.<br />

This item pertains to switchable with<br />

complete details given in item B.2.1<br />

Please provide us the drawing as mentioned. Drawings can be purchased from<br />

this office in office Hours.<br />

We understand that there are only two type<br />

of variants in the WAP-4 locomotive. Please<br />

confirm.<br />

The WAP4 Locomotives are<br />

generally of two types: (i) with SIV<br />

and (ii) with ARNO converter. In order<br />

to get more acquaintance, tenderer<br />

may do site visit at Electric<br />

Locomotive shed/ Vadodrara with<br />

prior permission.<br />

Pre Bid Queries for TPWS 47


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

109 Annx-4 (Page- Bombardier<br />

p<br />

TReference lay-out drawings no.<br />

139)<br />

-CLW.1W.13000.115 & CLW.1W.14000.055<br />

110 General Bombardier<br />

W<br />

TType of Locomotive and EMU/MEMU<br />

-<br />

W<br />

E<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Please provide us the drawing as mentioned. Drawings can be purchased from<br />

RDSO/CLW.<br />

Please confirm that the Locomotives & EMU<br />

/ MEMU does not use controlled slip and<br />

slide.<br />

111 General Bombardier<br />

T<br />

G<strong>Tender</strong> Notice - Completion Period We request <strong>Western</strong> <strong>Railway</strong> to allow<br />

completion period as 24 months in place of<br />

18 months.<br />

In this tender only WAP-4<br />

Locomotives and MEMUs are<br />

covered. MEMUs does not use<br />

controlled slip and slide.<br />

The completion period for this is 18<br />

months. However, any change in this<br />

regard will be notified, subsequently.<br />

112 4019(b) & 11.3<br />

(Paage 52 &<br />

133)<br />

113 4.54 (Page-<br />

78)<br />

Bombardier<br />

Bombardier<br />

TCross Acceptance<br />

-<br />

R<br />

D<br />

S<br />

SThe Mobilization advance shall carry interest rate@<br />

-18%<br />

F<br />

Please Clarify at what stage the Contract<br />

does <strong>Western</strong> <strong>Railway</strong> want Contractor to<br />

Complete the approval process of Cross<br />

Acceptance.<br />

We request <strong>Western</strong> <strong>Railway</strong> to limit the<br />

Interest Rate @ 12% instead of 18% as per<br />

<strong>Railway</strong>s Standard Practice<br />

Please read Para 4.19 of SCC (Page<br />

53) and Clause 11.3 of RDSO<br />

specification RDSO/SPN/183/2011<br />

Ver 2 in totality.<br />

AS per <strong>Railway</strong> Board July 2008<br />

letter, the "moblisation advance shall<br />

carry an interest of 12% p.a" The<br />

changes in this regard will be<br />

notified, subsequently.<br />

114 Bombardier SPenalty of Rs 1500/- per Day<br />

-<br />

F<br />

115 Page no.89,<br />

14.0 a<br />

116 Page no.89,<br />

14.0 b<br />

Siemens<br />

Siemens<br />

T<br />

-<br />

W<br />

S<br />

E<br />

T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

T<br />

-<br />

W<br />

E<br />

We Request <strong>Western</strong> <strong>Railway</strong> to<br />

Reconsider this Requirement to reduce<br />

overall cost of the Project.<br />

As per RDSO Specs, the following<br />

information to be provided in detail:<br />

1. Please provide the schematic plan /<br />

drawing of the conventional braking system<br />

in order to evaluate the possibilities of<br />

interfacing with existing braking system.<br />

Please provide details of suppliers who<br />

installed brake system on MEMU / Locos<br />

WAP4.<br />

<strong>Tender</strong> Condition remain<br />

unchanged.<br />

Item 14.(0 (a) at page 89 may be read<br />

as "Brake system of MEMUs –<br />

Electro-pneumatic & Auto Brake<br />

System. Brake system of loco type<br />

WAP4 – India <strong>Railway</strong> Air Brake (Tri<br />

plate / CLW rake mounted)" as per<br />

RDSO guideline. In order to get more<br />

acquaintance, tenderer may do site<br />

visit at Electric Locomotive shed/<br />

Vadodrara with prior permission.<br />

Details can be given after only after<br />

award of contract.<br />

Pre Bid Queries for TPWS 48


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

117 Page no.89,<br />

14.0 c<br />

118 Page no.89,<br />

14.0 e<br />

119 Page no.89,<br />

14.0 e & f<br />

120 Page no.90,<br />

14.0 (j)<br />

121 Page no.90,<br />

14.0 (k)<br />

122 Page no.90,<br />

14.0 (n) iv &<br />

Page No<br />

101,B1.2<br />

123 <strong>Tender</strong> Notice<br />

Page-1<br />

Siemens<br />

Siemens<br />

Siemens<br />

Siemens<br />

Siemens<br />

T<br />

-<br />

W<br />

S<br />

T<br />

-<br />

W<br />

E<br />

T<br />

-<br />

W<br />

S<br />

T<br />

-<br />

R<br />

D<br />

S<br />

T<br />

-<br />

W<br />

S<br />

E<br />

T<br />

-<br />

W<br />

S<br />

T<br />

-<br />

W<br />

S<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Please provide the Signaling Role plan for<br />

proposed section, in order to optimize<br />

quantities of LEU & Balises.<br />

Power supply for the On-board mentioned<br />

only 110V, whether it is AC or DC<br />

Power supply for track side will be provided<br />

as 110V AC.<br />

Since our LEU module internally converts<br />

AC to required DC voltages, the additional<br />

conversion of AC to DC power supply (as<br />

per RDSO specification 6.26) may not<br />

require. Also the back up power supply<br />

arrangement can be provided accordingly<br />

As per 14.0 (i) the CENELEC DMI‟s to be<br />

provided, hence 8 position switch may not<br />

require, since this feature is covered as per<br />

RDSO clause 6.18.1.2 (V).<br />

Please provide the Signaling Role plan for<br />

proposed section, in order to meet the<br />

requirement as per cl 4.5 to 4.10<br />

Signaling Roll plan for proposed<br />

section is being made part of tender<br />

document.<br />

The nominal supply is 110 Volts DC<br />

with variation from 70 V to 136V.<br />

For track side : The Nominal votage<br />

is 110 Volts AC 50 Hz with variation<br />

of -30% to +20% over the nominal<br />

voltage. The back up is to be<br />

provided as per amended clause<br />

14.0(f) issued by RDSO. The changes<br />

in this regard will be notified,<br />

subsequently.<br />

For CENELEC- DMI, the 8 position<br />

switch is not required, necessary<br />

amendment in this regard will be<br />

issued.<br />

Signaling Roll plan for proposed<br />

section is being made part of tender<br />

document.<br />

Siemens<br />

Please clarify the location of LEU will be LEU shall be centrallised in Relay<br />

centralized or near the signal. This is room / Equipment Room / Relay<br />

required to arrive at the quantity of types of huts, as far as possible.<br />

LEU cabinets.<br />

Siemens<br />

T<br />

G Please make completion period of 24 month The completion period for this is 18<br />

months. However, any change in this<br />

regard will be notified, subsequently.<br />

124 SCC Section<br />

4.40 Page no<br />

68<br />

125 SCC Section<br />

4.44 Page No<br />

70.<br />

Siemens<br />

Siemens<br />

T<br />

-<br />

W<br />

S<br />

T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

T<br />

Can the Maintenance period of 1 year<br />

started immediately after commissioning of<br />

each section<br />

Request for warranty period to be reduced to<br />

24 months instead 60 month.<br />

The Maintenance period will start<br />

after issue of PAC.<br />

<strong>Tender</strong> Condition remain<br />

unchanged.Warranty for a period of<br />

Five years should be given by the<br />

contractor/OEM from the date of<br />

issue of Final Acceptance Certificate<br />

Pre Bid Queries for TPWS 49


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

126 Page No<br />

72,clause 4.45<br />

127 Page No 100<br />

Schedule<br />

A4.17<br />

128 Page No 101,<br />

Schedule B1.1<br />

129 Page No 101,<br />

Schedule B1.2<br />

Siemens<br />

Siemens<br />

Siemens<br />

Siemens<br />

T<br />

-<br />

R<br />

T<br />

-<br />

W<br />

S<br />

E<br />

T<br />

-<br />

W<br />

S<br />

T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

T<br />

-<br />

W<br />

S<br />

T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Kindly consider warranty for 2 years & 3<br />

years AMC period.<br />

Supply of materials & Installation for Testing<br />

facility at Loco Shed is covered from Item<br />

No. A4.1 to A4.16. Please clarify what is<br />

meant by renovation and simulation set up<br />

as per item no A4.17<br />

Since the approximate no of signals are 835<br />

& proposed LEU quantity is only 560,please<br />

clarify--<br />

1) Whether 1 LEU to configure more than<br />

one signal<br />

If<br />

opposite line signal configured in one LEU,<br />

then failure of LEU may affect both the lines<br />

services. Please clarify your proposal /<br />

scheme for LEU & signal<br />

Since the approximate no of signals are 835,<br />

the no of switchable balises will be same<br />

(835). To provide the brake up of infill and<br />

repositioning balises signaling roll plan is<br />

required.<br />

Also<br />

please clarify the requirement of infill balises<br />

viz,<br />

For<br />

which signals infill to be provided (e.g only<br />

main line signals and not for loop line)<br />

<strong>Tender</strong> Condition remain unchanged.<br />

This Para is self explanatory and<br />

should be read in totality. The TPWS<br />

functioning should be simulated at<br />

training centre.<br />

LEU to configure more than one<br />

signal as per Input / output of latest<br />

RDSO specification . RDSO guideline<br />

in this reagrd is also being<br />

incorporated in Chapter-5 of tender<br />

document. <strong>Tender</strong>er should quote<br />

only as per schedule<br />

Signaling Roll plan for proposed<br />

section is being made part of tender<br />

document.<strong>Tender</strong>er has to quote as<br />

per quantities mentined in tender<br />

schedule. However, the break-up of<br />

proposed quantities of different type<br />

of Eurobalises (switchable, infill,<br />

repositioning) should also be<br />

submitted).The locattion of infil<br />

balises will be decided as per RDSO<br />

guideline after award of contract .<br />

130 Page No 101,<br />

Schedule B 8<br />

Siemens<br />

T<br />

-<br />

W<br />

S<br />

T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

<strong>Railway</strong>s is requested to kindly consider the<br />

following points and allow the firm to use<br />

data cable as per firm‟s specification.<br />

Two balises may not be available at one<br />

single place.<br />

If two different signal balises are connected,<br />

then a cable cut may affect train service at<br />

both signals.<br />

Information delivered by LEU to balise is<br />

unique and this information can not be<br />

shared in parallel with the other balises. This<br />

is true for two switchable balises in a balise<br />

group also.<br />

In view of RDSO guideline regarding<br />

data cabe, "Data cable of one pair is<br />

to be used for each balise<br />

separately". <strong>Tender</strong> Condition and<br />

Schedule in this regard is being<br />

amended . Future corrigendum may<br />

be seen in this regard.<br />

Pre Bid Queries for TPWS 50


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

131 Technical Spec<br />

Section 5.4.12<br />

Page No 97 &<br />

Sch D11 on<br />

page no106<br />

Siemens<br />

T<br />

-<br />

W<br />

S<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

The schedule of cable markers (6550) may<br />

not be sufficient for the length of the section<br />

(340km) as per the requirement since the<br />

same to be placed at every 30m.<br />

Will railway supply the additional quantity<br />

Appropriate action will be taken by<br />

Engineer-in-Chrage during the<br />

execution.<strong>Tender</strong> should Quote only<br />

as per tender schedule.<br />

132 Page No<br />

108,D15.9<br />

133 RDSO<br />

Specification<br />

for TPWS<br />

Para. 1.2 Page<br />

no.110<br />

134 RDSO<br />

Specification<br />

for TPWS<br />

Para. 2.1 Page<br />

no.112<br />

Siemens<br />

Siemens<br />

Siemens<br />

T<br />

-<br />

W<br />

T<br />

-<br />

W<br />

S<br />

T<br />

-<br />

R<br />

T<br />

-<br />

R<br />

D<br />

S<br />

O<br />

135 Page No 139 Siemens T<br />

-<br />

R<br />

136 Bid Chap – 2<br />

ITT Clause<br />

2.12 (v) g,<br />

Page - 27<br />

Please clarify the quantity mentioned is per<br />

cable or per core or per strand.<br />

Does the use of Euroloop would not provide<br />

further advantages regarding the main task<br />

(avoiding SPAD) and going alongside with<br />

increasing line performance by continuously<br />

updating the signal information in the cab.<br />

The current version of SRS released by<br />

UNISIG is 2.3.0d. Please confirm whether<br />

the same is applicable for this tender.<br />

Tentative space for OB equipment in WAP4<br />

loco, RDSO to provide drawings<br />

Siemens DG Please clarify if the System Performance<br />

Guarantee is to be submitted along with the<br />

offer. As per SCC (Chapter 4), clause no.<br />

4.16, page 50,the Performance guarantee<br />

is to be submitted only by successful bidder<br />

after receipt of LoA<br />

137 Bid Chap – 2<br />

ITT Clause 2.7,<br />

Page – 21<br />

Siemens G EMD Validity: The maximum validity of a<br />

demand draft is 6 Months from the date of<br />

issue. Therefore the same would get expired<br />

before offer validity. Hence we would revalidate<br />

/ issue a fresh draft before the<br />

validity expire & you would arrange to return<br />

the earlier issued draft for cancellation.<br />

Quantity mentioned is Per Terminal .<br />

RDSO/SPN/183/2011 Ver 2 does not<br />

caters for Euroloop.<br />

As per new guidelines issued by<br />

RDSO, UNISIG-SRS Ver 2.3.0d is<br />

applicable.<br />

It has been indicated in Annexure-4<br />

(page 139) of tender document.<br />

This Clause is self explanatory. The<br />

System Performance Guarantee is to<br />

submitted as Para 2.12 (g) on Format-<br />

7. Para 4.16 is regarding<br />

Performance Bank Guarantee, which<br />

is required to be submitted after<br />

issue of LoA by successful bidder.<br />

The Demand Draft submitted as<br />

EMD should be valid as per tender<br />

conditions. Preferably it should be<br />

valid for entire period to validity of<br />

offer ( 6 months).<br />

Pre Bid Queries for TPWS 51


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

138<br />

p<br />

Bid Chap – 2 ITT Siemens Clause 2.19, Page G – 32<br />

Currently in clause reference is made to<br />

Clause 4.14 of Chapter 4. But the reference<br />

should be made to clause 4.16 of the<br />

Chapter 4 (pg 50) instead of Clause 4.14<br />

(SCC)<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

The "Clause 4.14" in this Para may<br />

be read as "Clause 4.16". Necessary<br />

corection is being incorportaed in<br />

tender document.<br />

139 Bid Chap – 4<br />

SCC Clause<br />

4.7 + 4.13<br />

Page – 46 + 49<br />

Siemens<br />

T<br />

-<br />

W<br />

S<br />

E<br />

Consignee's address is given in Chap 4 Cl.<br />

4.7 (SCC) pg. 46. and as per Chap 4 Cl.<br />

4.13 (SCC) pg 49, Contractor is also<br />

required to establish an office and stores<br />

depot for receiving & storing equipment and<br />

materials. Kindly Clarify, whether contractor<br />

is required to establish any such office <br />

This Para is self explanatory and<br />

should be read in totality. The<br />

contractor has to establish<br />

temporary office for storage of<br />

materials issued by consinee for<br />

execution of work..<br />

140 Bid Chap – 4<br />

SCC Clause<br />

4.15 (ii) + 4.16<br />

(e) Page – 50 +<br />

51<br />

Siemens<br />

S<br />

-<br />

F<br />

Security Deposit recovered from running This Para is self explanatory and<br />

bills can be returned in lieu of irrevocable should be read in totality.<br />

BG. (Chapter 4 SCC Cl. 4.15 (ii) pg. 50.<br />

Whereas in Chapter 4 SCC Cl. 4.16 (e) pg.<br />

51 it is mentioned that Security Deposit shall<br />

be released only after expiry of maintenance<br />

period and after passing of final bill based on<br />

"No claim Certificate"<br />

141 Bid Chap – 4<br />

SCC Clause<br />

4.54, Page –<br />

78<br />

142 Bid Chap – 4<br />

SCC Clause<br />

4.55, Page –<br />

79<br />

144 Bid Chap – 4<br />

SCC Clause<br />

4.55, Page –<br />

79<br />

Siemens<br />

Siemens<br />

S<br />

-<br />

F<br />

S<br />

-<br />

F<br />

Mobilization Advance<br />

Currently Interest Rates - 18% p.a<br />

Request for giving interest free mobilization<br />

advance<br />

AS per <strong>Railway</strong> Board July 2008<br />

letter, the "moblisation advance shall<br />

carry an interest of 12% p.a" The<br />

changes in this regard will be<br />

notified, subsequently.<br />

Terms for Payment of SPARES. The correction in this regard is being<br />

In case of Spares / Additional Items : incorportaed in tender document.<br />

Payment Terms : 75% on receipt of material The statement "15% after isssue of<br />

: 15% after issuance of PAC : PAC" may be read as "20% after<br />

05% made after warranty period<br />

isssue of PAC".<br />

Total comes to 95%, then when balancing<br />

5% will be paid<br />

Siemens G Mode of Payment How The payment will be credited to<br />

will the payment be credited to contractor‟s contractor's account through<br />

account NEFT/ECS/Cheque<br />

NEFT/ECS as per declaration /details<br />

given by him along with offer.<br />

Necessary changes in this regard is<br />

being incorporated in tender<br />

document.<br />

Pre Bid Queries for TPWS 52


Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

145 Bid Chap – 4<br />

SCC Clause<br />

4.67, Page –<br />

87<br />

Siemens<br />

146 General Clause no. Siemens<br />

S<br />

-<br />

F<br />

F<br />

G<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

PRICE Variation Clause<br />

Currently - Not Applicable<br />

We<br />

request for inclusion of Price Variation<br />

Clause, as this tender is high value and will<br />

last for longer period.<br />

Octroi exemption certificate to be issued by<br />

<strong>Railway</strong>s. In case the certificate is not<br />

honoured by the concerned authorities, then<br />

the octroi duty will be to railway‟s account.<br />

The <strong>Tender</strong> Condition remain<br />

unchanged.<br />

Plese refer Para 2.14.4 (ii) of ITT,<br />

which is self explanatory. The <strong>Tender</strong><br />

Condition remain unchanged.<br />

147 Bid Chap – 4 Siemens<br />

SCC Clause<br />

4.55,Page – 79<br />

S<br />

-<br />

F<br />

Proposed Payment Scheme:-<br />

The <strong>Tender</strong> Condition remain<br />

We propose 90% on Supply 5% unchanged.<br />

on (PAC) . However, in case the installation<br />

is kept ready for commissioning for a period<br />

more than 3 months on account of <strong>Railway</strong>s,<br />

then payment to be released against Bank<br />

Guarantee of equivalent amount Balance<br />

5% against Final Acceptance certificate<br />

(FAC)<br />

Items involving<br />

Installation testing & commissioning : 90%<br />

on production of certificate by the site<br />

Engineer that relevant portion of respective<br />

item has been completed.<br />

5% on Production of Provisional Acceptance<br />

certificate (PAC)<br />

5% after execution of warranty period &<br />

issue of Final Acceptance certificate (FAC).<br />

Installation & Commissioning: 90% on<br />

receipt of PAC and 10% on Receipt of FAC<br />

Training: 100% Payment completion of the<br />

training<br />

148 General Clause<br />

no.<br />

Siemens<br />

S<br />

-<br />

F<br />

Statutory Variation - Any new and /or<br />

additional levy on any of the transactions<br />

covered under this offer arising out of new<br />

Sales Tax / VAT legislation / Union Budget<br />

will be to <strong>Railway</strong>s account<br />

Please refer Para 4.59 of SCC in<br />

tender document. This Para is self<br />

explantory.<br />

Pre Bid Queries for TPWS 53


WESTERN RAILWAY<br />

Minutes of Pre-bid Conference in connection with <strong>Tender</strong> No. WR/S&T/HQ/2010-11/05<br />

held on 30.06.2011 in MRVC Office, Churchgate, Mumbai – 400 020.<br />

Pre-bid conference in connection with <strong>Tender</strong> No. WR/S&T/HQ/2010-11/05 (Two Packet<br />

System) for “Survey, Design, Supply, Installation, Testing and Commissioning of On Board<br />

Equipments in Locomotives/MEMUs and Trackside Equipments along with Associated<br />

Signalling Works for Train Protection and Warning System (TPWS) in Virar (at Km 60)-<br />

Vadodara (at Km 397) Section of <strong>Western</strong> <strong>Railway</strong>” was held on 30.06.2011 in the conference<br />

room of MRVC at <strong>Western</strong> <strong>Railway</strong> Headquarter office, Churchgate, Mumbai-400 020. The<br />

Participants are as under:-<br />

<strong>Railway</strong>s Side:<br />

1. Shri Ompal Singh CELE/WR<br />

2. Shri Harish Gupta, CSTE/Works/WR<br />

3. Shri A.K. Jain ED/Signal/RDSO/LKO<br />

4. Shri Shri Ashok Nair Dy FA&CAO(F)/WR<br />

5. Shri R.K.Pandey Dy.CSTE/W/WR<br />

6. Shri Hemant Kagra Dir/QA/S&T/Mumbai<br />

7. Shri Dinesh Vashistha Sr.DSTE/W/BCT/WR<br />

8. Shri Yashvir Guleria DSTE/S/BRC/WR<br />

9. Shri V.K.Agrawal ADSTE/W/WR<br />

Firms Side:<br />

1. Shri Pier P. Severino M/s. Ansaldo STS<br />

2. Shri Sajit Bhaskaran M/s. Ansaldo STS<br />

3. Shri Glen Mascrenhas M/s. Invesys Rail<br />

4. Shri Sebastin Sahayaraj, -do-<br />

5. Shri Niraj Shah M/s. Bombardier<br />

6. Shri Mangesh Warankar -do-<br />

7. Shri Parnupong C -do-<br />

8. Shri Anil Kishore M M/s. MerMec Hytronics JV<br />

9. Shri C.V.Kamesh M/s. Hitachi<br />

10. Shri Tarun Khanna M/s. Itochu India<br />

11. Shri P.G.B.Nair M/s. Thales<br />

12. Shri Ashok Bansode M/s. Siemens<br />

13. Shri Vikrant V. Hublikar M/s. Siemens<br />

14. Shri Kuldip Pandya -do-<br />

15. Shri P.A.Swamy M/s. Alstom P. Ltd.,


16. Shri S. Karthikeyan M/s. Alstom P. Ltd<br />

17. Shri Therry Lesaine M/s. Alstom<br />

18. Shri Aminesh Shorua M/s. Eldyne<br />

1. CSTE/Works welcomed all participants present in the pre-bid conference. He also<br />

explained the scope of the work covered in this tender with the technical plan of other<br />

work and the scheme of the section as under:-<br />

The work involves Survey, Design, Supply, Installation, Testing and Commissioning of<br />

On Board Equipment (for Locomotives / MEMUs) and Track Side Equipments including<br />

associated signalling works for Train Protection Warning System (TPWS) in Virar (VR)<br />

(at Km 60) -Vadodara (BRC)( at Km 397) Section on Mumbai & Vadodara Divisions of<br />

<strong>Western</strong> <strong>Railway</strong>. Electrical Multiple Units & Main line Electrical Multiple Units (EMUs<br />

& MEMUs), and Locomotives are plying in the sections. The section is provided with<br />

25KV, 50 Hz, AC electrified traction with Double line, Four Aspect Colour light<br />

Automatic Signalling system and relay based interlocking exist at the stations.<br />

At present, the section contains approximately 835 Signals including Automatic &<br />

Station signals in UP and Down direction for passenger running lines. There are 49 Nos<br />

of Station (including Virar & Vadodara), 117 interlocked gates in the section and<br />

there can be minor changes with time. In this tender 40 Numbers of WAP-4<br />

locomotives and 10 MEMUs (20 cabs) are covered.<br />

2. Rates of all the items covered in Schedule of Requirement of the tender are to be<br />

mandatorily quoted as per Schedule in Indian Rupees by the bidders. It was also made<br />

clear that the conditions of JV mentioned in the tender document are specifically for Joint<br />

Venture and Consortium in place of JV will not be acceptable.<br />

3. All the participating firms except M/s Hitachi, M/s. Itochu India, M/s. Eldyne have<br />

submitted their written questions for Pre-bid meeting on 30.06.2011.<br />

4. CSTE/Works has requested M/s Hitachi, M/s. Itochu India, M/s. Eldyne to submit their<br />

queries within a week’s time.<br />

5. It was decided that <strong>Western</strong> <strong>Railway</strong> will compile all the queries of firms received till<br />

15.07.2011 and reply will be sent to all the participants. The reply will be also up-loaded<br />

at site www.wr.indianrailways.gov.in as per tender conditions.<br />

6. As decided vide item 5 above the queries of participants of Pre-Bid conference and<br />

clarification of <strong>Western</strong> <strong>Railway</strong> on each query have been documented and is enclosed<br />

herewith.<br />

(Harish Gupta)<br />

CSTE (Works)<br />

For Chief Signal & Telecom Engineer<br />

<strong>Western</strong> <strong>Railway</strong>, Mumbai – 400020.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!