22.01.2015 Views

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

77<br />

Cl. No.<br />

Chapter-4<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

TWARRANTY<br />

SCC 4.44<br />

-The warranty for this tender will be for a period of<br />

WFive Years in lieu of three years as mentioned in<br />

Sclause 12.4 in RDSO Specification number<br />

E RDSO/SPN/183/2011 Version 2<br />

T<br />

-<br />

R<br />

D<br />

S<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Warranty for a period of Five years should be given by the contractor/OEM from the date of issue of Final Acceptance Certificate, which will be considered as date of<br />

Since the essence of the equipment being provided is the reliability & proven- ness for trouble free working at site, the Contractor shall confirm that in case the equipm<br />

O<br />

i.The contractor shall guarantee that all material &<br />

equipment to be supplied and installed as per this<br />

contract shall be free from defect and fault in<br />

design, material, workmanship and manufacture<br />

and shall be of the highest grade and consistent<br />

with established and generally accepted standard for<br />

materials of the type ordered and in full conformity<br />

with the contract specification.<br />

ii.During the period of Warranty the contractor shall<br />

be responsible to the extent expressed in this<br />

clause for any defects that may develop under the<br />

conditions provided for by the contractor and under<br />

proper use, arising from faulty materials, design or<br />

workmanship on the plant or from faulty erection of<br />

the equipments under the supervision of the<br />

contractor, but not to do so by the purchaser who<br />

shall state in writing in what the portion is faulty<br />

iii.This tender shall guarantee that the material/<br />

equipment supplied will continue to conform to the<br />

specification and quality, as covered in this tender,<br />

for a period of Five Years. Final Acceptance<br />

Certificate and this warranty shall survive,<br />

notwithstanding the fact that, the material /<br />

equipment may have been inspected, accepted and<br />

payment therefore made by the <strong>Railway</strong>s.<br />

Our understanding is that if any part of the<br />

works is put in use by the Purchaser before<br />

completion of the entire work then warranty<br />

for such part or Phase of the works shall<br />

cease 5 years from the date on which such<br />

part or Phase was put to use. Kindly confirm<br />

Warranty for a period of Five years<br />

will start from date of commissioning<br />

of complete system and issue of<br />

Final Acceptance Certificate.<br />

Pre Bid Queries for TPWS 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!