Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />
TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />
Sr. No. Cl. No. Firm T<br />
Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />
y<br />
p<br />
The Unit prices offered against the various items in<br />
schedules will include beside labour the following<br />
elements of cost:-<br />
(i) Cost of all materials required for preparing the<br />
cable routes, laying the cables and all other<br />
incidentals connected therewith excluding the<br />
materials supplied by the <strong>Railway</strong>s.<br />
(ii) Special tools & installation materials for TPWS<br />
equipments, racks, wiring etc.<br />
(iii) Cost of transportation of material, supplied by<br />
the <strong>Railway</strong> from place of delivery to the site of work.<br />
(iv) Return of released materials, left over cables<br />
and other materials from the site of work and<br />
handing over to the Engineer at specified locations<br />
or stores depot.<br />
(v) Cost of preparation of detailed<br />
documentation completion plans/drawings.<br />
(vi) All other miscellaneous expenses necessary for<br />
the execution of work and fulfillment of contractual<br />
obligation.<br />
82 Chapter-4<br />
SCC 4.64<br />
Alstom<br />
GSETTLEMENT OF DISPUTES<br />
Arbitration & conciliation ordinance 1996 /<br />
Arbitration Act, 1996 with latest circular or<br />
corrigendum will be valid for this tender.<br />
We suggest disputes be settled by<br />
arbitration under the Rules of Arbitration of<br />
the International Chamber of Commerce by<br />
three arbitrators appointed in accordance<br />
with the said Rules. And the place of<br />
arbitration should be neutral venue. We<br />
propose Singapore or London.<br />
<strong>Tender</strong> Condition remain<br />
unchanged.<br />
The successful tenderer/s shall put up his/their<br />
claim as per clause 43 of the General Conditions of<br />
The provision of Clauses 63 & 64 to the General<br />
Condition of Contract will be applicable only for<br />
settlement of claims or disputes between the parties<br />
for values less than or equal to 20% of the value of<br />
the contract, and when claim or disputes are of<br />
value more than 20% of the contract, provision of<br />
Clauses 63 & 64 and other relevant clauses of the<br />
General Conditions of Contract will not be<br />
applicable and arbitration will not be a remedy for<br />
settlement of such disputes.<br />
Pre Bid Queries for TPWS 37