22.01.2015 Views

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

y<br />

p<br />

65 Chapter-4 Alstom SCONSIGNEE<br />

SCC 4.7<br />

-(a)<br />

The consignee for this work will be Senior<br />

FSection Engineer (Signal)/Stores/ Valsad for<br />

Mumbai (BCT) Division work & Senior Section<br />

Engineer (Signal)/Stores/ Vadodara for Vadodara<br />

(BRC) Division work for track side equipments and<br />

Signalling material.<br />

(b) The consignee for On Board Equipments will be<br />

Senior Section Engineer /RS / Vadodara (BRCY)&<br />

Senior Section<br />

Engineer /MEMU /Vadodara(BRCY)<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

Our understanding is that for SOR items<br />

consignee shall be the Purchaser. For<br />

imported items the Bill of Entry shall be filed<br />

in the name of Purchaser. Please confirm.<br />

Title to the equipment manufactured or<br />

sourced outside India shall pass to the<br />

Purchaser once the equipment passes over<br />

the ship‟s rail / aircraft door in the country of<br />

origin. Kindly confirm. Irrespective<br />

of title to equipment, risk in respect of each<br />

item will pass to the Purchaser on the date<br />

of issue of the Provisional Acceptance<br />

Certificate. Kindly confirm.<br />

This Para is self explanatory and<br />

should be read in totality. All<br />

materials are to be supplied to<br />

nominated consignee along with<br />

relevant inspection and commercial<br />

documents. The contractor will be<br />

responsible for proper up-keep of<br />

equipments supplied and installed till<br />

warranty period is over.<br />

66 Chapter-4<br />

SCC 4.8<br />

Alstom<br />

TTRAINING:<br />

-(i) (a) Training of <strong>Railway</strong> officials at<br />

Wmanufacturer's premises for understanding of<br />

Smanufacturing, and design processes pertaining to<br />

Ehardware & software. This also includes<br />

demonstration of interoperability, operation,<br />

maintenance, data preparation & configuring of<br />

the system at working site as mutually agreed<br />

training program.<br />

We understand that Contractor is<br />

responsible for imparting training of <strong>Railway</strong><br />

Officials only for the purpose of installation,<br />

operation, maintenance and repair of all<br />

equipment. Kindly confirm.<br />

This Para is self explanatory and<br />

should be read in totality. OEM has<br />

to impart required knowledge<br />

mentioned in this Para to different<br />

groups as per requiement of<br />

<strong>Railway</strong>s .<br />

Pre Bid Queries for TPWS 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!