Download Tender Document Corrigendum - Western Railway ...
Download Tender Document Corrigendum - Western Railway ...
Download Tender Document Corrigendum - Western Railway ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />
TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />
Sr. No. Cl. No. Firm T<br />
y<br />
p<br />
65 Chapter-4 Alstom SCONSIGNEE<br />
SCC 4.7<br />
-(a)<br />
The consignee for this work will be Senior<br />
FSection Engineer (Signal)/Stores/ Valsad for<br />
Mumbai (BCT) Division work & Senior Section<br />
Engineer (Signal)/Stores/ Vadodara for Vadodara<br />
(BRC) Division work for track side equipments and<br />
Signalling material.<br />
(b) The consignee for On Board Equipments will be<br />
Senior Section Engineer /RS / Vadodara (BRCY)&<br />
Senior Section<br />
Engineer /MEMU /Vadodara(BRCY)<br />
Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />
Our understanding is that for SOR items<br />
consignee shall be the Purchaser. For<br />
imported items the Bill of Entry shall be filed<br />
in the name of Purchaser. Please confirm.<br />
Title to the equipment manufactured or<br />
sourced outside India shall pass to the<br />
Purchaser once the equipment passes over<br />
the ship‟s rail / aircraft door in the country of<br />
origin. Kindly confirm. Irrespective<br />
of title to equipment, risk in respect of each<br />
item will pass to the Purchaser on the date<br />
of issue of the Provisional Acceptance<br />
Certificate. Kindly confirm.<br />
This Para is self explanatory and<br />
should be read in totality. All<br />
materials are to be supplied to<br />
nominated consignee along with<br />
relevant inspection and commercial<br />
documents. The contractor will be<br />
responsible for proper up-keep of<br />
equipments supplied and installed till<br />
warranty period is over.<br />
66 Chapter-4<br />
SCC 4.8<br />
Alstom<br />
TTRAINING:<br />
-(i) (a) Training of <strong>Railway</strong> officials at<br />
Wmanufacturer's premises for understanding of<br />
Smanufacturing, and design processes pertaining to<br />
Ehardware & software. This also includes<br />
demonstration of interoperability, operation,<br />
maintenance, data preparation & configuring of<br />
the system at working site as mutually agreed<br />
training program.<br />
We understand that Contractor is<br />
responsible for imparting training of <strong>Railway</strong><br />
Officials only for the purpose of installation,<br />
operation, maintenance and repair of all<br />
equipment. Kindly confirm.<br />
This Para is self explanatory and<br />
should be read in totality. OEM has<br />
to impart required knowledge<br />
mentioned in this Para to different<br />
groups as per requiement of<br />
<strong>Railway</strong>s .<br />
Pre Bid Queries for TPWS 17