Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No. Cl. No. Firm T<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

y<br />

p<br />

After clearance of the on board equipment installed<br />

for safe working Loco /MEMU and fit for<br />

commercial run, the TPWS system will be made<br />

functional in the concerned Loco / MEMU. After<br />

completion of installation, testing and successful<br />

commissioning of TPWS system in the Loco /<br />

MEMU with the on board supply for each batch (as<br />

per Para 4.6 of SCC) of supplied equipments, a<br />

„Provisional Acceptance Certificate‟ (PAC) will be<br />

issued for that batch of equipments after<br />

observance period of one month.<br />

II. Track Side Equipments & Accessories<br />

(a) Immediately after completion of the work at each<br />

sub-sections (i.e.100 Kms, 100Kms, 140 Kms on<br />

Virar -Vadodara section) or still shorter, the<br />

contractor shall certify and advise the <strong>Railway</strong>s in<br />

writing that the installation is (i) complete, (ii) ready<br />

for satisfactory service and (iii) ready to be handed<br />

over. He will also place at the disposal of the<br />

purchaser the required staff for inspection, testing<br />

and putting it into operation.<br />

(b) The test or tests specified in Technical<br />

specification will be conducted jointly by the<br />

<strong>Railway</strong>s and contractor as soon as possible after<br />

receipt of advice regarding completion of one sub -<br />

section by the contractor. The test schedule shall be<br />

furnished by the contractor which will be modified by<br />

mutual discussion between the contractor and<br />

<strong>Railway</strong> before finalization. Any component,<br />

modules, sub-assemblies or equipment failing<br />

during the commissioning test shall be<br />

replaced/repaired free of cost by contractor.<br />

Pre Bid Queries for TPWS 29