22.01.2015 Views

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

Download Tender Document Corrigendum - Western Railway ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

epair of all equipment. The training courses<br />

should, apart from formal class room training,<br />

include hand on practical experience and visits to<br />

working installation. (v) The contractor shall at<br />

every stage of installation; testing and<br />

Subject : Pre-bid clarification on commissioning queries received shall provide from all facilities Industry for Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 adequate Virar training (at of <strong>Railway</strong> Km 60)-Vadodara personnel who may (at Km be 397) section<br />

Sr. No. Cl. No. Firm Tdeputed to work on Original the project. Text (vi) In the event of<br />

Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

yany equipment sub-system being manufactured /<br />

passembled in India in technical collaboration with<br />

foreign firm by the tenderer or any of its subcontractor,<br />

approximately half of the training<br />

provided in the schedule shall be arranged at the<br />

collaborator's premises/training centre and the<br />

remaining portion at the working installations. Details<br />

of training proposal shall be submitted by the<br />

contactor for approval of <strong>Railway</strong>s. (vii) Set of<br />

documents related to training in adequate quantity<br />

shall be provided.(viii) The cost of travel to the place<br />

of training and return of <strong>Railway</strong> officials deputed for<br />

training shall be borne by <strong>Railway</strong>s. Cost of training<br />

if any shall be borne by the contractor.<br />

67 Chapter-4<br />

SCC 4.10<br />

Alstom<br />

TLONG TERM AVAILABILITY OF SPARES AND<br />

-SYSTEM SUPPORT<br />

W<br />

(i) The tenderer shall give, in writing along We understand that for long term supply of<br />

S<br />

with the tender, an undertaking that the<br />

spares there will be a separate agreement<br />

E<br />

components / modules as also the main signed with mutually agreed terms and<br />

T<br />

equipment quoted in the schedule requirements conditions and mutually agreed price<br />

-<br />

will be supplied at the same unit rates until the end variation formula. Kindly confirm.<br />

R<br />

of the warranty period and subsequently also at the<br />

D<br />

rates mutually agreed to. The manufacturer shall<br />

S<br />

guarantee that spare parts for the system shall be<br />

O<br />

available for life cycle period (at least 15 years). At<br />

least 3 years notice shall be given to the<br />

<strong>Railway</strong>s before any equipment or components<br />

are discontinued or phased out from the<br />

manufacturing plans. This will enable the <strong>Railway</strong>s<br />

to assess the life time requirement of spares needed<br />

and order in sufficient quantity prior to stoppage of<br />

the manufacture. This condition is to be observed<br />

for ten years after expiry of the warranty period so<br />

that the <strong>Railway</strong> can procure spares for the<br />

components / modules from the suppliers.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

Pre Bid Queries for TPWS 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!