Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

38<br />

Cl. No.<br />

Chapter 4<br />

Firm<br />

Invensys<br />

T<br />

y<br />

p<br />

TProvision of one potential free contact for each<br />

SCC, Cl 4.3.3,<br />

-signal aspect including calling on „A‟/‟G‟ marker in<br />

iv), page no. 42<br />

WRelay Room/Relay Hut<br />

S<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

We understand LEUs will be in centralized<br />

location either in Relay room / or at the<br />

Relay Huts (Goomties). Please confirm the<br />

same.<br />

LEU shall be centralized in Relay<br />

room / Equipment Room / Relay<br />

huts, as far as possible.<br />

39 Chapter 4<br />

SCC, Cl 4.6,<br />

a), Completion<br />

period, page<br />

no. 44<br />

Invensys<br />

GThe time schedule for the entire work is of utmost<br />

importance. The entire work is required to be fully<br />

executed within 18 months from date of issue of<br />

Letter of Acceptance (LOA).<br />

We request you to increase the completion<br />

period to 24 months instead of 18 months.<br />

The completion period for this is 18<br />

months. However, any change in this<br />

regard will be notified, subsequently.<br />

40 Chapter 4<br />

SCC, Cl 4.6,<br />

c), Completion<br />

period, (V)<br />

page no. 45<br />

&<br />

cl. 4.20.1,<br />

Functional<br />

Acceptance<br />

Tests, page no.<br />

53<br />

Invensys GSupply of Materials We request, D – reference shall commence<br />

from the date of functional test approval of<br />

the prototype by RDSO/Purchaser<br />

<strong>Tender</strong> Condition remain unchanged.<br />

41 Chapter 4<br />

SCC, Cl 4.55,<br />

On Account<br />

Payment, page<br />

no. 79<br />

42 Chapter 5<br />

Technical<br />

Specification &<br />

Requirements,<br />

RDSO Cl.<br />

14.0(j), page<br />

no. 90<br />

43 Chapter 6<br />

Schedule of<br />

Supplies &<br />

Works, Part A,<br />

S.No A1.3.<br />

page no. 98<br />

Invensys<br />

Invensys<br />

Invensys<br />

SFor supply items of tender schedule 75% (Seventy<br />

-five percent) of the value of each consignment shall<br />

Fbe paid on receipt of materials at consignee store<br />

depot and on production of the following documents:<br />

We request you to consider 90% on receipt<br />

of materials against 75% in the tender.<br />

T8 Position Switch Please clarify the purpose of 8 Position<br />

-<br />

Switch when CENELEC DMI is used.<br />

W<br />

S<br />

E<br />

TBTM plus antenna – 60 Nos.<br />

-<br />

R<br />

D<br />

S<br />

O<br />

T<br />

Only one antenna per loco and one antenna<br />

per MEMU is considered, please clarify the<br />

position of the antenna where it would be<br />

mounted (Front / Rear / Center of the Loco<br />

or MEMU).<br />

<strong>Tender</strong> Condition remain unchanged.<br />

8 Position Switch for CENELEC DMI<br />

is not required. Necessary corrction<br />

is being made in tender document.<br />

One antenna per loco and two<br />

antenna per MEMU have been<br />

considered. Antenna will be placed<br />

as per RDSO guidelines during the<br />

execution.<br />