Subject : Pre-bid clarification on queries received from Industry Participants of TPWS: Date-30.06.2011<br />

TENDER NO. WR/S&T/HQ/2010-11/05 Virar (at Km 60)-Vadodara (at Km 397) section<br />

Sr. No.<br />

71<br />

Cl. No.<br />

Chapter-4<br />

Firm<br />

Alstom<br />

T<br />

y<br />

p<br />

TSYSTEM PERFORMANCE GUARANTEE We understand that end objective shall be<br />

SCC 4.20.2<br />

-(i) Since the design of the system to achieve the according to technical specification and<br />

Wend objective shall be checked and confirmed by Contractor‟s proposal. Kindly confirm.<br />

Sthe contractor and the supply of the materials will be<br />

E according to this system design, the tenderer shall<br />

Ggive unqualified and unconditional guarantee that<br />

when the equipment supplied by him are<br />

installed and commissioned at site, it shall achieve<br />

the desired objective and that in the event of<br />

performance of the system when installed not<br />

complying with the end objective or with the<br />

specifications, he shall provide further inputs to<br />

enable the <strong>Railway</strong>s to realize the end objectives<br />

with full compliance of the specifications contained<br />

in these documents. No additional payment will be<br />

made to the contractor for supply of any additional<br />

goods and service required in this regard.<br />

Original Text Clarification needed Clarification of <strong>Western</strong> <strong>Railway</strong><br />

This Para is self explanatory and<br />

should be read in totality. <strong>Tender</strong><br />

condition remain unchanged.<br />

(ii) This certificate in the pro-forma given in Form<br />

No. 7, shall accompany the offer. Absence of this<br />

certificate which will form part of the agreement shall<br />

disqualify the tenderer automatically.<br />

72 Chapter-4<br />

SCC 4.21<br />

Alstom GPROGRAMME OF WORK EXECUTION<br />

(i) Time is the essence of this contract and time<br />

schedule shall be strictly adhered to. The entire<br />

work as per the Contract will have to be completed<br />

within Eighteen months from the Date of issue of<br />

acceptance letter, on a progressive basis. The<br />

<strong>Tender</strong>er will be responsible for progress of work on<br />

progressive basis from the date of issue of<br />

acceptance letter. Since the progress of the work is<br />

critically related to the supply of material by the<br />

contractor, he will be responsible for supply of duly<br />

inspected Material on a progressive basis, so<br />

that the work can be completed within Eighteen<br />

months progressively.<br />

We understand that Work shall be<br />

completed in phases and Purchaser shall<br />

put to use the Work in phases. Kindly<br />

confirm.<br />

This Para is self explanatory and<br />

should be read in totality.<br />

Pre Bid Queries for TPWS 24